By the end of this chapter, you will be able to:
Mastering these skills will help you ensure accuracy and quality in civil works, making you a valuable asset on any construction site.
Squaring dimensions is a fundamental aspect in the measurement of civil works, especially for quantity surveyors who must ensure precise calculations of areas and volumes for accurate cost estimation and resource planning. In Kenyan construction projects, errors in squaring can lead to significant financial discrepancies, disputes, and delays. This chapter focuses on the principles and practical techniques necessary for multiplying dimensions correctly, a skill that underpins the measurement of surfaces such as floors, walls, and slabs. Mastery of timesing dimensions enhances the accuracy of bills of quantities, supporting effective project management.
Timesing dimensions refers to the process of multiplying two or more linear measurements to obtain an area or volume, a critical step in the quantification of civil works. Quantity surveyors in Kenya frequently apply timesing when calculating floor areas, wall surfaces, and excavation volumes to prepare bills of quantities that guide budgeting and procurement. This topic breaks down the principles, methods, and common considerations in timesing dimensions to ensure precision and consistency in measurement work.
Timesing dimensions involves multiplying linear measurements such as length, width, and depth to derive the area or volume of a construction element. This operation is foundational in quantity surveying because it translates physical dimensions into quantifiable units required for cost estimation and resource allocation.
The process of timesing dimensions in civil works requires a systematic approach to ensure accuracy and reliability. Quantity surveyors must follow clear steps to convert linear measurements into areas or volumes, considering site-specific factors and measurement conventions.
Identify the Dimensions to be Multiplied
Determine which linear measurements (length, width, depth) are relevant for the element being measured, such as the length and width of a slab or the height and width of a wall.
Ensure Consistent Units
Verify that all measurements are recorded in the same unit system, preferably metres, to avoid errors during multiplication.
Measure Accurately on Site
Use appropriate tools like measuring tapes or laser distance meters to obtain precise linear measurements, noting any irregularities in shape.
Apply the Correct Mathematical Operation
Multiply the linear dimensions to calculate area (length × width) or volume (length × width × depth), depending on the element's nature.
Round Off Appropriately
Round the calculated area or volume to a standard decimal place, commonly two decimal places for areas and three for volumes, aligning with industry practice.
Record and Verify Calculations
Document the calculations clearly in measurement sheets and cross-check with site drawings or plans to confirm accuracy.
Adjust for Openings or Projections
Subtract areas of openings like windows or doors or add projections such as plinths to the total area or volume as per measurement rules.
Example: At a county government office construction, the quantity surveyor measured a rectangular floor slab 12.5 m long and 8.4 m wide. The area was calculated as 12.5 × 8.4 = 105.0 m², which was then recorded for concrete works estimation.
Despite its apparent simplicity, timesing dimensions is prone to errors that can significantly affect project outcomes. Quantity surveyors must be vigilant to avoid mistakes and implement quality checks to uphold measurement integrity.
Timesing dimensions varies depending on the type of civil work element being measured. Quantity surveyors must adapt their approach to the specific characteristics of floors, walls, excavations, and concrete elements to ensure accurate quantification.
Example: In a SACCO office extension, the quantity surveyor calculated the plastering area by timesing the wall length of 15 m by the height of 3 m, resulting in 45 m² of plastering work for cost estimation.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter examined the essential techniques for accurately measuring and recording dimensions in civil works. It began with the process of timesing dimensions, which involves multiplying linear measurements to calculate areas, a critical step in quantifying materials and work scope. The discussion then moved to dotting dimensions, a method used to mark precise points on drawings or site layouts, ensuring clarity and accuracy in transferring measurements. Finally, the chapter covered the squaring of booked dimensions, which entails verifying and adjusting recorded measurements to confirm right angles and correct proportions in construction projects. Practical exercises and project applications reinforced these concepts, emphasizing the importance of precision and reliability in measurement for successful civil engineering work. Mastery of these techniques supports efficient resource management and quality assurance in various construction settings.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Nails 2" |
| Builder's Square | Profile Boards (25mm thick timber) |
| Spirit Level (600mm) | Lime Powder |
| Hammer | |
| Plumb Bob | |
| Chalk Line |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Builder's Square | 1 Pc per 4 Candidates |
| 3 | Spirit Level (600mm) | 1 Pc per Candidate |
| 4 | Hammer | 1 Pc per 4 Candidates |
| 5 | Nails 2" | Sufficient per Candidate |
| 6 | Profile Boards (25mm thick timber) | 4 pcs 2m length per Candidate |
| 7 | Lime Powder | Sufficient per Candidate |
| 8 | Plumb Bob | 1 Pc per Candidate |
| 9 | Chalk Line | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Site Preparation and Setting Out | |||
| Identified and used appropriate PPE (helmet, safety boots, reflective jacket) (Award 1 mark for each correctly worn PPE) | 3 | ||
| Assembled all required tools and materials before starting (Award 0.5 marks for each tool/material assembled, max 2 marks) | 2 | ||
| Prepared and cleared site area sufficient for marking out (Award 2 marks for proper clearing and preparation) | 2 | ||
| Positioned profile boards accurately at corners using hammer and nails (Award 1 mark for each correctly positioned profile board) | 3 | ||
| Used measuring tape and builder's square to set out the rectangular dimensions (Award 1 mark for each accurate dimension set: length, width, and 2 marks for correct squaring) | 4 | ||
| Verified squareness by timesing method (correct diagonal measurements) (Award 2 marks for each correct diagonal measurement matching within tolerance) | 4 | ||
| Marked corners and lines on ground using lime powder and chalk line (Award 1 mark for each correctly marked corner and line) | 3 | ||
| Checked and ensured profile boards are vertical using plumb bob (Award 2 marks for correctly plumbed profile boards) | 2 | ||
| Cleaned working area after setting out (Award 2 marks for thorough cleaning) | 2 | ||
| Stored tools and materials properly after use (Award 2 marks for proper cleaning and storage) | 2 | ||
| Sub-Total | 27 | ||
| PRODUCT CHECKLIST | |||
| Rectangular area marked out with dimensions 4,000mm by 3,000mm within ±50mm tolerance (Award 4 marks for all dimensions within tolerance; otherwise 2 marks for partial accuracy) | 4 | ||
| Timesing method correctly applied with diagonals measuring approximately 5,000mm ±50mm confirming squareness (Award 4 marks for diagonals within tolerance confirming the rectangle is square) | 4 | ||
| Profile boards are vertical and firmly fixed in correct positions (Award 3 marks for vertical and stable profile boards) | 3 | ||
| Layout lines clearly marked on ground and visible (Award 2 marks for clear and neat marking on ground) | 2 | ||
| Finished layout is free from damage, spillage or disturbance after marking (Award 2 marks for intact and neat final layout) | 2 | ||
| Sub-Total | 15 | ||
| GRAND TOTAL | 42 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Nails 2" |
| Builder's Square | Lime Powder |
| Plumb Bob | PPE (Helmet, Safety Boots, Reflective Jacket) |
| Spirit Level | |
| Hammer | |
| Profile Boards | |
| String Line | |
| Chalk Marker |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Builder's Square | 1 Pc per 4 Candidates |
| 3 | Plumb Bob | 1 Pc per Candidate |
| 4 | Spirit Level | 1 Pc per Candidate |
| 5 | Hammer | 1 Pc per 4 Candidates |
| 6 | Nails 2" | Sufficient |
| 7 | Lime Powder | Sufficient |
| 8 | Profile Boards | 4 Pcs per Candidate |
| 9 | String Line | 2 Rolls per Candidate |
| 10 | Chalk Marker | 1 Pc per Candidate |
| 11 | PPE (Helmet, Safety Boots, Reflective Jacket) | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: SETTING OUT USING TIMESING METHOD | |||
| Identified and used PPEs in line with occupational safety and health regulations (Award 1 mark for each correctly worn PPE: Helmet, Safety Boots, Reflective Jacket, Gloves, Eye Protection) | 5 | ||
| Assembled correct tools and materials for the timesing process (Award 0.5 mark for each of the six correct tools/materials assembled) | 3 | ||
| Prepared and cleared the site area sufficiently for layout (Award 2 marks for properly cleared and leveled site area) | 2 | ||
| Used measuring tapes and builder's square correctly to establish baseline dimensions (Award 1 mark for each accurate baseline dimension set) | 4 | ||
| Applied timesing method accurately to locate and mark corners and intermediate points (Award 1 mark for each correctly timesed dimension transfer at each corner and intermediate point) | 6 | ||
| Transferred measurements to profile boards and fixed string lines accurately (Award 1 mark for each correctly fixed profile board and string line) | 5 | ||
| Marked layout on ground clearly using lime powder at all key points (Award 1 mark for each correctly marked corner point) | 3 | ||
| Checked squareness of layout using builder's square and diagonal measurements (Award 2 marks for correct squareness within 50mm tolerance, 2 marks for correct diagonal measurement) | 4 | ||
| Cleaned working area after completion (Award 1 mark for clearing all debris and tools) | 1 | ||
| Properly cleaned and stored tools and equipment after use (Award 1 mark each for cleaning and correct storage) | 2 | ||
| Sub-Total | 35 | ||
| PRODUCT CHECKLIST | |||
| Layout dimensions match the specified 4500mm x 3200mm within ±50mm tolerance (Award 4 marks for both length and width within tolerance) | 4 | ||
| Layout is squared with diagonals measured correctly within ±50mm tolerance (Award 4 marks for diagonals within tolerance) | 4 | ||
| Profile boards and string lines are firmly fixed and correctly positioned (Award 3 marks for firm fixing and correct alignment) | 3 | ||
| Marked points on ground are clear, unambiguous and accurately placed (Award 3 marks for clean and accurate markings) | 3 | ||
| Layout is parallel to the datum level as verified by spirit level (Award 2 marks for parallelism within ±10mm) | 2 | ||
| Final layout presentation is neat and shows care in workmanship (Award 3 marks for overall neatness and professional presentation) | 3 | ||
| Sub-Total | 19 | ||
| GRAND TOTAL | 54 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.