Quantity Survey  ·  Level 6
Measurement Of Building Works III
Chapter 3: Squaring dimensions
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • carry out timesing of dimensions safely and correctly following standard operating procedures (SOPs).
  • perform dotting of dimensions accurately according to SOPs.
  • square dimensions precisely and confidently following SOPs.

Mastering these skills will help you create accurate building layouts, which is essential for quality construction work and professional success in the trade.

Squaring dimensions is a fundamental skill in quantity surveying, ensuring accurate measurement and calculation of building elements. In the Kenyan construction industry, precision in dimension measurement directly influences cost estimation, tendering, and project execution. Mastery of squaring dimensions supports quantity surveyors in minimizing errors, optimizing resource allocation, and maintaining professional credibility. This chapter explores the key techniques and principles involved in the timesing of dimensions, a critical aspect of squaring.

3.1 Timesing of Dimensions

The process of timesing dimensions involves multiplying a given dimension by a certain factor to obtain the total measurement for repeated elements or units in a building structure. This technique is vital in quantity surveying to efficiently calculate the total length, area, or volume when multiple identical components exist, such as wall lengths, window frames, or floor finishes. In Kenya, where many projects involve repetitive structural elements, timesing facilitates rapid and accurate measurement, saving time and reducing calculation errors during bill preparation.

3.1.1 Meaning of Timesing Dimensions

Timesing dimensions refers to the multiplication of a single measured dimension by the corresponding number of repeated units or components to determine the total dimension required. This technique is applied when identical elements occur multiple times in a building, enabling the quantity surveyor to consolidate measurements quickly.

Characteristics of Timesing Dimensions

  • Repetition-Based Calculation: Timesing is used when multiple identical components exist, such as five identical windows in a wall.
  • Simplification of Measurement: Instead of measuring each unit separately, one measurement is multiplied by the total count.
  • Accuracy Dependent on Unit Count: Accurate counting of repeated units is essential to avoid errors in total dimension.
  • Applicable to Length, Area, and Volume: Timesing can be applied to linear dimensions, surface areas, or volumes depending on the element measured.
  • Reduces Manual Workload: It streamlines the measurement process, particularly in large-scale projects with repetitive designs.

In practice, a quantity surveyor at a county government office preparing bills for a new hospital wing might measure the length of a standard corridor panel and times it by the number of panels to get the total corridor length, thus saving time and ensuring consistency.

3.1.2 Significance of Timesing in Quantity Surveying

Timesing dimensions plays a crucial role in quantity surveying by improving efficiency and accuracy in measurement and cost estimation. Its significance is particularly evident in Kenyan construction projects where repetitive design elements are common.

Importance of Timesing Dimensions

  • Enhances Measurement Efficiency: Simplifies the measurement process by reducing repetitive individual measurements.
  • Improves Accuracy of Quantity Take-Offs: Minimizes human error by consolidating repetitive measurements.
  • Facilitates Cost Estimation: Provides reliable data for pricing repeated elements, essential in preparing bills of quantities.
  • Supports Project Planning: Enables better resource allocation by quickly determining total material requirements.
  • Ensures Consistency Across Measurements: Maintains uniformity in measurement practices, reducing discrepancies in tender documents.

3.1.3 Procedures for Timesing Dimensions

The process of timesing dimensions requires systematic steps to ensure accurate total measurements for repeated building components. Careful execution is necessary to avoid compounding errors in quantity take-offs.

Steps in Timesing Dimensions

  1. Identify the Dimension to be Timesed: Determine the single dimension of the repeated element, such as the length of one wall segment.
  2. Count the Number of Repeated Units: Accurately count how many identical elements exist in the building layout.
  3. Multiply the Single Dimension by the Quantity: Use multiplication to calculate the total dimension.
  4. Record the Timesed Dimension Clearly: Document the calculation neatly to avoid confusion during bill preparation.
  5. Cross-Check the Unit Count: Verify the number of units to prevent overestimation or underestimation.
  6. Apply Timesing to Relevant Measurements Only: Ensure timesing is used only for truly identical repeated elements to maintain accuracy.

In a university project, a quantity surveyor might measure one classroom door width and multiply it by the number of classrooms to obtain the total door width dimension for procurement planning.

3.1.4 Common Errors and Quality Checks in Timesing

While timesing dimensions enhances efficiency, errors can occur if care is not taken in counting or calculation. Quality control measures are essential to maintain accuracy in quantity surveying documentation.

Typical Mistakes in Timesing

  • Incorrect Unit Count: Miscounting the number of repeated elements leads to significant errors in total dimension.
  • Multiplying Different Dimensions: Confusing dimensions of varying sizes and timesing them as if identical.
  • Ignoring Non-Uniform Elements: Applying timesing to elements that have slight variations in size or shape.
  • Poor Documentation: Failing to clearly indicate the timesing calculation can cause misinterpretation later.
  • Neglecting Verification Steps: Skipping cross-checking increases the risk of cumulative errors.

Quality Assurance Measures

  • Detailed Site Inspection: Physically verify the number and uniformity of repeated elements before timesing.
  • Use of Measurement Tools: Employ tape measures or laser distance meters to confirm single unit dimensions.
  • Documentation of Calculations: Include clear notes and workings in measurement sheets or electronic records.
  • Peer Review: Have another professional cross-check the timesed dimensions for accuracy.
  • Consistent Measurement Standards: Adhere to standard measurement codes such as those outlined by the National Construction Authority (NCA) in Kenya.

At a county hospital refurbishment, a quantity surveyor who cross-verifies the number of identical windows before timesing ensures that the bill of quantities reflects the actual construction scope, avoiding costly disputes.

Practice Questions

  1. Explain the concept of timesing dimensions and its relevance in quantity surveying within the Kenyan construction industry. (10 marks)

  2. Describe the step-by-step procedure for timesing dimensions when measuring repeated building elements. (12 marks)

  3. Identify and explain five common errors that can occur during timesing of dimensions and suggest quality checks to prevent them. (15 marks)

  4. A quantity surveyor measures a single wall panel length as 3.5m. There are 12 identical panels in a hospital project. Calculate the total length of wall panels using timesing. Show your working. (8 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Dotting of Dimensions

In the practice of quantity surveying in Kenya, precise measurement and clear communication of dimensions on drawings are critical to avoid costly errors during construction. Dotting of dimensions is a technique used to enhance the readability and accuracy of…

🔒3.3 Squaring of Booked Dimensions Practical/Projects

The practical application of squaring booked dimensions is a critical skill for Quantity Surveyors in Kenya. In the dynamic construction environment, accurate measurement and verification of dimensions ensure that bills of quantities reflect the true scope of…

Chapter Summary

This chapter focused on the essential techniques used in the squaring of dimensions within building works measurement. It began by examining the timesing of dimensions, a process that involves multiplying measured lengths by specified quantities to determine total measurements accurately. Following this, the chapter explored the dotting of dimensions, which is a method used to mark and verify key points on drawings or site plans to ensure precision. The final section addressed the practical application of squaring booked dimensions, emphasizing how these theoretical methods are applied in real construction projects to maintain accuracy and consistency. Together, these topics equip students with the skills needed to measure and record building works effectively, ensuring that all dimensions align correctly for successful project execution. The chapter stressed the importance of accuracy in each step to avoid costly errors during construction. Mastery of these techniques is crucial for any professional involved in building measurement and project management.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the purpose of timesing dimensions in quantity surveying measurements? (2 marks)
  2. Identify two advantages of dotting dimensions during measurement booking. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the purpose of timesing of dimensions in building measurement and how it aids a Quantity Surveyor working on a county government housing project. (4 marks)
  2. Describe the process of dotting dimensions and its importance in ensuring accuracy in measurement records for a commercial office block construction. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Applying Timesing Marks on Measured Lines for Site Layout

Quantity Survey · Level 6
Measurement Of Building Works III
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Apply timesing marks on a site layout measuring 6000mm x 4000mm, ensuring correct squaring and dimension accuracy.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Lime Powder
Builder's SquareNails 2 inch
Spirit LevelProfile Boards (timber) 25mm thick
Chalk Line
Hammer
Pencil
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Builder's Square1 Pc per 4 Candidates
3Spirit Level1 Pc per Candidate
4Chalk Line1 Pc per Candidate
5Lime PowderSufficient per Candidate
6Hammer1 Pc per 4 Candidates
7Nails 2 inchSufficient per Candidate
8Profile Boards (timber) 25mm thick8 meters length per Candidate
9Pencil1 Pc per Candidate
10Protective Gloves1 Pair per Candidate
11Safety Boots1 Pair per Candidate
12Reflective Safety Vest1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PROCESS AND SITE PREPARATION
Used appropriate PPE (Safety boots, gloves, reflective vest)
(Award 1 mark for each correct PPE worn)
3
Assembled all required tools and materials correctly
(Award 1/2 mark for each of six tools/materials assembled)
3
Prepared site area by clearing and leveling for layout
(Award 2 marks for proper site preparation)
2
Set out baseline and datum points using measuring tape and builder's square
(Award 1 mark for each correct baseline and datum point set)
4
Used spirit level to ensure profile boards and lines are level
(Award 1 mark for each correct leveling at three points)
3
Marked timesing lines accurately on profile boards and ground using chalk line and lime
(Award 1 mark for each correctly marked line; total 5 lines)
5
Checked squareness of layout by measuring diagonals and using builder's square
(Award 2 marks for each diagonal correctly measured and within tolerance)
4
Cleaned working area after marking
(Award 1 mark for cleaning site)
1
Stored tools and materials properly after use
(Award 1 mark for correct storage)
1
Sub-Total26
PRODUCT CHECKLIST
Timesing marks are correctly placed at 6000mm x 4000mm with a tolerance of ±50mm
(Award 5 marks if all marks are within tolerance)
5
Layout is square with diagonal measurements equal within ±10mm
(Award 4 marks for correct diagonal equality)
4
Profile boards positioned correctly and firmly fixed
(Award 3 marks for stable and accurate profile board positioning)
3
Lines marked are clear, continuous, and correctly identified as timesing marks
(Award 2 marks for neat and clear marking)
2
Sub-Total14
GRAND TOTAL40
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Dotting of Booked Dimensions on Site Layout

Quantity Survey · Level 6
Measurement Of Building Works III
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Transfer and dot the booked dimensions for a 4000mm x 3000mm site layout accurately on the ground.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Nails 2"
Builder's SquareLime Powder
Spirit LevelProfile Boards
Plumb Bob
Hammer
Pens
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Builder's Square1 Pc per 4 Candidates
3Spirit Level1 Pc per Candidate
4Plumb Bob1 Pc per Candidate
5Hammer1 Pc per 4 Candidates
6Nails 2"Sufficient
7Lime PowderSufficient
8Profile Boards4 Pcs per Candidate
9Pens1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SITE PREPARATION AND SETTING OUT
Used appropriate PPEs (helmet, boots, reflective vest)
(Award 1 mark for each correctly worn PPE)
3
Assembled all required tools and materials before starting
(Award 1/2 mark for each of six tools/materials assembled)
3
Cleared and prepared the site area sufficiently for layout
(Award 2 marks for correct site clearance)
2
Positioned profile boards accurately as per layout corners
(Award 1 mark for each correctly positioned profile board)
4
Set out the layout corners using builder’s square and measuring tape
(Award 1 mark for each corner accurately set out)
4
Verified squareness of layout by correct diagonal measurements
(Award 3 marks for correct diagonal checks within tolerance)
3
Used plumb bob and spirit level to ensure vertical and horizontal alignment of profile boards
(Award 1 mark each for plumb bob use, spirit level use, and correct alignment)
3
Marked layout corners and key points on ground with lime dots
(Award 1 mark for each correctly dotted corner or key point)
5
Cleaned working area after completion of layout dotting
(Award 2 marks for thorough cleaning)
2
Cleaned and stored tools and materials properly after use
(Award 1 mark each for cleaning and proper storing)
2
Sub-Total31
PRODUCT CHECKLIST
Layout dimensions correctly dotted on ground within ±50 mm tolerance for length and width (4000mm x 3000mm)
(Award 3 marks each for length and width within tolerance)
6
Layout is square with diagonals matching within ±20 mm tolerance
(Award 5 marks for correct diagonal measurements)
5
Dots clearly visible and accurately placed at key measurement points
(Award 4 marks for neat and clear dotting)
4
Profile boards firmly fixed and aligned vertically and horizontally
(Award 4 marks for stable and vertical profile boards)
4
Overall neatness and accuracy of set-out layout
(Award 5 marks for overall neat and accurate layout)
5
Sub-Total24
GRAND TOTAL55
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Setting Out and Squaring Booked Dimensions for Building LayoutPractical 3
🔒Verification of layout dimensions using timesing and dotting methodsPractical 4
🔒Setting out squaring dimensions using timesing marks for a 5m x 4m foundation layoutPractical 5
🔒Marking and Dotting Dimensions for Squaring Verification on LayoutPractical 6
🔒Full Squaring and Dimension Marking of Building LayoutPractical 7
🔒Measurement and Timesing of Irregular Building EdgesPractical 8
🔒Dotting of dimensions on an irregular layout for squaringPractical 9
🔒Verification of Squaring Using Booked Dimensions on SitePractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • carry out timesing of dimensions safely and correctly following standard operating procedures (SOPs).
  • perform dotting of dimensions accurately according to SOPs.
  • square dimensions precisely and confidently following SOPs.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.