Quantity Survey  ·  Level 6
Measurement Of Building Works II
Chapter 3: Squaring dimensions
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • correctly carry out timesing of dimensions by following standard operating procedures (SOPs)
  • accurately perform dotting of dimensions according to SOPs
  • properly square dimensions by following SOPs

Mastering these skills ensures your building measurements are precise and reliable, which is essential for quality workmanship in the construction trade.

Measurement of building works is a fundamental aspect of quantity surveying, ensuring accurate calculation of materials, labour, and costs for construction projects. Squaring dimensions, a critical technique in measurement, involves the multiplication of linear measurements to determine areas and volumes essential for preparing bills of quantities. Mastery of these skills enables quantity surveyors in Kenya to produce precise cost estimates and control budgets effectively, supporting clients such as county governments, private developers, and financial institutions in managing their resources. This chapter focuses on the timesing of dimensions, a key process in squaring that underpins accurate quantification of building elements.

3.1 Timesing of Dimensions

In quantity surveying, timesing of dimensions refers to the multiplication of linear measurements to calculate areas, volumes, or quantities of construction materials and works. This process is vital for developing bills of quantities and cost plans that reflect the true scope of works in a building project. Accurate timesing ensures that the quantities recorded correspond to the actual physical dimensions on site, enabling effective cost control and resource allocation. For instance, at a county government office expansion project in Kisumu, precise timesing of floor areas and wall volumes was essential to avoid budget overruns and delays due to material shortages.

3.1.1 Meaning of Timesing of Dimensions

Timesing of dimensions means multiplying two or more linear measurements to determine a derived quantity such as an area or volume. In building measurement, this is a fundamental arithmetic operation used to convert linear lengths into measurable quantities for costing and procurement.

Characteristics of Timesing of Dimensions

  • Multiplication of Linear Measurements: Timesing involves multiplying length by width to obtain area or length by width by height for volume.
  • Foundation for Quantification: It serves as the basis for calculating the amount of materials like concrete, bricks, or plaster required.
  • Units Conversion: Timesing often requires careful attention to units, converting millimetres or centimetres into metres for consistency.
  • Precision Dependent: The accuracy of timesing depends on precise initial measurements; errors propagate through multiplication.
  • Applicable Across Elements: Timesing is used for floors, walls, roofs, excavations, and other components requiring area or volume measurement.

3.1.2 Purpose of Timesing of Dimensions

The primary purpose of timesing is to translate linear measurements into quantities that can be priced and managed within a construction budget. This process supports cost estimation, procurement planning, and financial reporting.

Purposes of Timesing of Dimensions

  • Calculate Material Quantities: Enables determination of concrete volume or plaster area for ordering supplies.
  • Support Cost Estimation: Provides the basis for pricing works in bills of quantities.
  • Facilitate Tendering: Ensures contractors bid accurately by quantifying work scope.
  • Assist Project Planning: Allows scheduling of material deliveries based on quantities.
  • Enable Progress Measurement: Supports tracking of completed work against planned quantities.

3.1.3 Methods of Timesing Dimensions in Quantity Surveying

Timesing can be performed using various methods depending on the complexity of the measurement and available tools. Quantity surveyors in Kenya often employ manual calculations, digital spreadsheets, and specialized software for accuracy and efficiency.

Common Methods for Timesing Dimensions

  • Manual Calculation: Using calculators or mental arithmetic for simple rectangular areas.
  • Scaled Drawings: Measuring dimensions on drawings and applying scale factors before timesing.
  • Spreadsheets: Utilizing Excel or similar tools to automate multiplication and reduce errors.
  • Measurement Software: Employing digital measurement tools linked with software for direct input and calculation.
  • Field Measurement Devices: Using laser distance meters to obtain precise dimensions for timesing on site.

3.1.4 Challenges and Solutions in Timesing Dimensions

Timesing, while straightforward, can present challenges related to measurement errors, unit inconsistencies, and complex shapes. Addressing these challenges is crucial to maintaining accuracy in quantity surveying.

Challenges in Timesing Dimensions

  • Measurement Inaccuracies: Errors in initial length or width measurements lead to incorrect quantities.
  • Unit Conversion Mistakes: Mixing centimetres and metres without proper conversion causes calculation errors.
  • Irregular Shapes: Non-rectangular areas require subdivision or approximation, complicating timesing.
  • Data Entry Errors: Manual transcription of measurements into calculation tools can introduce mistakes.
  • Lack of Standardization: Varied measurement approaches among surveyors can lead to inconsistent quantities.

Solutions to Timesing Challenges

  • Use Precise Measuring Tools: Laser meters and tape measures with clear graduations reduce errors.
  • Standardize Units: Always convert to a single unit system before timesing.
  • Divide Complex Shapes: Break irregular areas into rectangles or triangles for simpler multiplication.
  • Double-Check Data Entry: Review calculations and inputs to catch errors early.
  • Adopt Consistent Procedures: Follow standardized measurement rules as per the Civil Engineering and Quantity Surveying manuals used by Kenyan professionals.

Practice Questions

  1. Explain the meaning of timesing of dimensions and its relevance in preparing bills of quantities. (10 marks)
  2. Describe five purposes of timesing dimensions in quantity surveying and how they contribute to project cost management. (15 marks)
  3. Discuss three common methods used by quantity surveyors in Kenya to perform timesing of dimensions, highlighting their advantages and limitations. (15 marks)
  4. Identify five challenges faced during timesing of dimensions and propose practical solutions for each within a Kenyan construction project context. (20 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Dotting of Dimensions

In the measurement of building works, dotting of dimensions is a crucial technique used to accurately transfer measurements from drawings to site or vice versa. For Quantity Surveyors in Kenya, mastering dotting ensures precision in quantifying building elemen…

🔒3.3 Squaring of Booked Dimensions Practical/Projects

In the Kenyan quantity surveying profession, the practical aspect of squaring booked dimensions is fundamental to accurate measurement and valuation of building works. This process ensures that all dimensions recorded during site measurements correspond correc…

Chapter Summary

This chapter has explored the essential techniques involved in squaring dimensions within building measurement. It began with an explanation of timesing of dimensions, highlighting the process of multiplying booked measurements by a specified factor to facilitate accurate scaling and calculation. The discussion then moved to dotting of dimensions, a method used to clearly mark and differentiate specific measurements on drawings or records for ease of reference. Finally, the chapter covered the practical applications of squaring booked dimensions, emphasizing hands-on exercises and projects that reinforce the theoretical concepts. These projects demonstrate how to apply timesing and dotting methods in real-world measurement tasks to ensure precision in building works. Through this comprehensive approach, students gain both the theoretical understanding and practical skills necessary for effective dimension squaring in construction measurement.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the purpose of timesing dimensions in quantity surveying measurements? (2 marks)
  2. Identify two common symbols used in the dotting of dimensions and explain their significance. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the purpose of timesing of dimensions in the measurement of building works and provide an example from a county government office’s building project in Kenya. (4 marks)
  2. Describe the process of dotting of dimensions and discuss its importance in ensuring accuracy in quantity surveying measurements. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Timesing of Linear Dimensions on Layout

Quantity Survey · Level 6
Measurement Of Building Works II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Mark and record linear dimensions of a 6000mm x 4500mm layout using timesing method.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape 5mLime Powder
Builder's SquareNails 2 inch
Spirit Level 600mmSafety Helmet
Plumb BobSafety Boots
Profile BoardsReflective Jacket
Hammer
Pencil
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape 5m1 Pc per Candidate
2Builder's Square1 Pc per 4 Candidates
3Spirit Level 600mm1 Pc per Candidate
4Plumb Bob1 Pc per Candidate
5Profile Boards4 Pcs per Candidate
6Lime PowderSufficient per Candidate
7Nails 2 inchSufficient per Candidate
8Hammer1 Pc per 4 Candidates
9Pencil1 Pc per Candidate
10Safety Helmet1 Pc per Candidate
11Safety Boots1 Pair per Candidate
12Reflective Jacket1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SETTING OUT AND TIMESING OF DIMENSIONS
Used appropriate PPEs (helmet, boots, reflective jacket)
(Award 1 mark for each correctly used PPE, total 5 marks)
5
Assembled and prepared all required tools and materials for timesing
(Award 1 mark each for assembling measuring tape, builder's square, profile boards)
3
Selected and cleared a sufficient area for layout
(Award 2 marks for proper site preparation)
2
Set out profile boards accurately at corners according to layout
(Award 1 mark for each correctly positioned profile board, total 4 marks)
4
Measured and marked linear dimensions on profile boards using timesing method
(Award 1 mark per correct timesing measurement and marking, total 6 marks)
6
Checked and ensured layout is square by verifying diagonal measurements
(Award 2 marks for each correct diagonal measurement, total 4 marks)
4
Recorded all timesing measurements clearly and accurately
(Award 1 mark per correct recording, total 3 marks)
3
Marked layout on ground correctly with lime at corners and edges
(Award 1 mark for each correctly lime marked corner, total 3 marks)
3
Cleaned and stored tools and working area after completion
(Award 1 mark each for cleaning and proper storing, total 2 marks)
2
Sub-Total32
PRODUCT CHECKLIST
Layout dimensions are accurate within ±50mm tolerance (6000mm x 4500mm)
(Award 6 marks for correct linear dimensions within tolerance)
6
Layout is squared with diagonals measuring approximately 7500mm ±50mm
(Award 5 marks for correct diagonal measurements indicating squareness)
5
Timesing markings on profile boards are clear, legible and complete
(Award 3 marks for neat and complete timesing markings)
3
Profile boards are stable and correctly positioned as per layout
(Award 4 marks for correct positioning and stability of profile boards)
4
Sub-Total18
GRAND TOTAL50
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Dotting Dimensions on Layout for a 4m x 3m Foundation

Quantity Survey · Level 6
Measurement Of Building Works II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Dot the dimensions accurately on the 4000mm x 3000mm foundation layout.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Lime Powder
Builder's SquareNails 2"
Spirit LevelProfile Boards (25mm thick timber)
Hammer
Plumb Bob
Pencil / Marker Pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Builder's Square1 Pc per 4 Candidates
3Spirit Level1 Pc per Candidate
4Hammer1 Pc per 4 Candidates
5Nails 2"Sufficient per Candidate
6Lime PowderSufficient per Candidate
7Profile Boards (25mm thick timber)8m length Pc per Candidate
8Plumb Bob1 Pc per Candidate
9Pencil / Marker Pen1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION AND SITE SETTING OUT
Identified and used appropriate PPE: helmet, safety boots, reflective jacket
(Award 1 mark each for correctly worn PPE)
3
Assembled all necessary tools and materials before starting work
(Award 0.5 mark each for assembling 4 tools/materials)
2
Prepared the site by clearing and demarcating sufficient area for the layout
(Award 2 marks for correct and clean site preparation)
2
Set out the profile boards at correct positions using measuring tape and nails
(Award 1 mark each for correct placement of three profile boards)
3
Used builder's square and spirit level to ensure layout is squared and level
(Award 1 mark each for correct use of builder's square, spirit level, and plumb bob)
3
Marked the layout corners and edges using lime powder accurately
(Award 1 mark each for marking all four corners accurately)
3
Dotted the measured dimensions clearly and accurately on the layout
(Award 1 mark each for dotting four key dimensions within +50mm tolerance)
4
Sub-Total20
PRODUCT CHECKLIST
Dimensions dotted on layout match 4000mm length (+50mm tolerance)
(Award 2 marks for correct length dimension)
2
Dimensions dotted on layout match 3000mm width (+50mm tolerance)
(Award 2 marks for correct width dimension)
2
Layout is well squared with correct diagonal measurements (+50mm tolerance)
(Award 3 marks for correct squaring of layout)
3
Profile boards are positioned correctly according to the layout plan
(Award 3 marks for correct positioning and firm fixing)
3
Sub-Total10
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Setting Out and Verifying Squaring of a Rectangular Layout Using Booked DimensionsPractical 3
🔒Timesing and Dotting Dimensions on a Technical DrawingPractical 4
🔒Practical squaring of foundation layout using timesing methodPractical 5
🔒Dotting and squaring layout on site for a 4m x 3m foundationPractical 6
🔒Dimension recording using timesing on a building planPractical 7
🔒Dimension marking using dotting on a measured site planPractical 8
🔒Setting out and squaring foundation trenches using booked dimensionsPractical 9
🔒Verification of Squaring Accuracy Using Timesing and Dotting MethodsPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 18 questions Start quiz ▾
0%
0 / 2
🔒

16 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • correctly carry out timesing of dimensions by following standard operating procedures (SOPs)
  • accurately perform dotting of dimensions according to SOPs
  • properly square dimensions by following SOPs

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.