Building formwork, also known as shuttering, is a critical temporary structure in construction projects, particularly in Kenya where rapid urban development demands efficient and safe practices. For Quantity Surveyors, understanding the construction and dismantling of formwork is essential for accurate cost estimation, resource planning, and contract management. This chapter focuses on the structural elements of building formwork, highlighting their roles, types, and considerations that influence both design and dismantling phases within the Kenyan construction context.
2.1 Structural elements
Formwork structural elements provide the necessary support and shape to concrete until it gains sufficient strength. These elements must be carefully selected, assembled, and dismantled to ensure safety, cost-effectiveness, and quality of the finished structure. Quantity Surveyors need to comprehend these components to prepare precise bills of quantities and anticipate potential risks and delays in the project schedule.
2.1.1 Types of Structural Elements in Formwork
The structural elements of formwork are categorized based on their function and position within the system. Each type contributes uniquely to the stability and shape of the concrete element being cast.
Primary Structural Elements
Primary elements directly support the weight of the fresh concrete and live loads during construction. These include:
- Form Panels: These are the surfaces against which concrete is poured, typically made of plywood, steel, or plastic. Their quality affects the finish of concrete and influences reusability.
- Beams and Girders: Horizontal members that support form panels, transferring loads to the supporting framework.
- Posts and Props: Vertical supports that carry loads from beams to the ground, adjustable to accommodate different floor heights.
- Strongbacks: Vertical stiffeners fixed to form panels to prevent bulging under concrete pressure.
- Walings: Horizontal members that tie the form panels and strongbacks together, distributing loads evenly.
Secondary Structural Elements
Secondary elements assist in maintaining the integrity of the formwork but do not carry primary loads. These include:
- Bracing: Diagonal supports that stabilize the entire formwork structure against lateral forces such as wind or accidental impacts.
- Ties and Anchors: Devices that hold opposing form panels together, resisting the lateral pressure from fresh concrete.
- Sheathing: The surface layer that directly contacts the concrete; it can be made from timber, steel, or plastic-coated materials for ease of stripping.
Material Considerations
Formwork elements vary in material selection, impacting durability, cost, and handling:
- Timber: Common in Kenyan sites due to availability and ease of modification but less durable and prone to warping.
- Steel: Offers strength and reusability, suitable for repetitive casting in commercial projects.
- Plastic and Composite Materials: Increasingly used for specialized formwork systems where smooth finishes and rapid dismantling are required.
2.1.2 Functions and Load-Bearing Roles of Structural Elements
Each structural element in formwork plays a specific role in safely supporting and shaping the concrete until it cures. Understanding these roles helps Quantity Surveyors anticipate resource allocation and project timelines.
Load Transmission
- Form Panels hold the concrete in shape, resisting the direct pressure exerted by the wet mix.
- Beams and Girders transfer loads from form panels to vertical supports, ensuring stability.
- Posts and Props carry the cumulative load down to the foundation or ground, preventing collapse.
Stability and Safety
- Bracing prevents lateral movement, which could cause formwork failure and safety hazards on site.
- Ties and Anchors maintain the correct spacing between panels, avoiding bulging or misalignment.
- Strongbacks and Walings reinforce form panels against deformation, ensuring dimensional accuracy of the concrete element.
Adaptability and Adjustability
- Adjustable Props allow fine-tuning of formwork heights, accommodating variations in floor levels or design changes during construction.
- Modular Components facilitate quick assembly and dismantling, essential for tight project schedules common in Kenyan urban developments.
2.1.3 Selection Criteria for Structural Elements in Kenyan Construction Projects
Choosing appropriate structural elements for formwork depends on several factors related to project requirements, site conditions, and economic considerations.
Project Scale and Complexity
- Large commercial projects in Nairobi often require steel or engineered modular formwork systems for speed and reusability.
- Smaller residential buildings may rely on timber formwork due to lower initial costs and local availability.
Concrete Specifications
- The type of concrete mix and pour height influence the strength requirements of formwork elements to resist pressure.
- High-strength concrete or rapid-setting mixes necessitate stronger, more rigid formwork materials.
Site Environment and Accessibility
- Sites with limited access or uneven terrain, such as some county government projects in rural areas, may require lightweight and easily transportable elements.
- Weather conditions, including heavy rains during Kenya’s long rains season, demand moisture-resistant materials to prevent degradation.
Cost and Availability
- Timber remains the most economical and readily available material in many Kenyan regions.
- However, the total cost of formwork includes not only material purchase but also labor for assembly, dismantling, and potential wastage.
Durability and Reusability
- Projects aiming for sustainability and cost reduction over multiple pours benefit from steel or plastic formwork that can be reused multiple times.
- Timber formwork, while cheaper upfront, may incur higher replacement costs due to wear and damage.
2.1.4 Implications of Structural Elements on Quantity Surveying Tasks
The choice and management of formwork structural elements significantly impact the Quantity Surveyor’s scope of work, including cost estimation, procurement, and project control.
Accurate Bill of Quantities Preparation
- Understanding the specifications and quantities of form panels, props, ties, and bracing helps in preparing detailed bills, reducing the risk of underestimation.
- For example, a SACCO building project in Kisumu required detailed measurement of adjustable props to ensure budget accuracy.
Cost Control and Value Engineering
- Knowledge of material lifespans and reusability informs decisions on whether to invest in steel or timber formwork.
- Quantity Surveyors can advise clients on long-term savings versus immediate costs, balancing project budgets effectively.
Scheduling and Resource Planning
- The assembly and dismantling time of various structural elements affect the critical path in project schedules.
- For instance, hospital expansion projects in Mombasa utilized modular steel formwork to expedite construction within tight timelines.
Risk Management and Compliance
- Proper specification of formwork components ensures compliance with safety standards, reducing the risk of accidents and associated liabilities.
- Quantity Surveyors play a role in verifying that contractors include adequate provisions for formwork safety in their tenders.
Practice Questions
- Explain the roles of primary and secondary structural elements in formwork and how they contribute to the stability of the structure. (10 marks)
- Discuss five key factors that influence the selection of formwork structural elements in Kenyan construction projects. (10 marks)
- How does the choice of formwork materials affect the Quantity Surveyor’s cost estimation and project control processes? Provide examples from different sectors. (10 marks)
- Identify and explain the load-bearing roles of at least five structural elements used in building formwork. (10 marks)
The rest of this chapter
🔒Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free account 🔒2.2 Types of Formworks Assignment
In the practice of quantity surveying within Kenya's construction industry, understanding the various types of formworks is essential for accurate cost estimation, resource planning, and contract management. Formworks, also known as shuttering, serve as tempor…
🔒2.3 Formwork materials
In the Kenyan quantity surveying profession, understanding formwork materials is critical for accurate cost estimation, procurement planning, and contract management during construction projects. Formwork materials directly influence the quality, safety, and e…
🔒2.4 Formwork measurements and dimensions
Formwork measurements and dimensions are critical in quantity surveying for accurate estimation, procurement, and cost control on construction projects. In Kenya, quantity surveyors must ensure that all formwork components are measured precisely to avoid wasta…
🔒2.5 Timber properties
Timber remains one of the most widely used materials for building formwork and shuttering in Kenya due to its availability, affordability, and ease of handling. For quantity surveyors, understanding the properties of timber is essential when estimating costs,…
🔒2.6 Formwork Construction/Installation
Formwork construction and installation are critical activities in building projects that directly affect the quality, safety, and cost of concrete works. For Quantity Surveyors in Kenya, understanding the technical and practical aspects of formwork installatio…
🔒2.7 Formwork dismantling
Formwork dismantling is a critical phase in the construction process where the temporary structures supporting freshly cast concrete are carefully removed. For Quantity Survey professionals in Kenya, understanding this process is essential to ensure accurate m…
Chapter Summary
This chapter explored the key structural elements involved in building temporary works, emphasizing their role in supporting concrete during construction. Various types of formworks were discussed, highlighting their specific applications and suitability for different construction tasks. The chapter examined the materials used in formwork, focusing on their properties and advantages to ensure durability and safety. Accurate formwork measurements and dimensions were presented as critical factors for achieving the desired shape and stability of concrete structures. Timber properties were analyzed in detail, considering strength, workability, and resistance to environmental factors. The processes of formwork construction and installation were described step-by-step to ensure efficient and secure assembly. Finally, the chapter covered the proper techniques for dismantling formwork to prevent damage to the concrete and allow for safe reuse of materials.
Self-Assessment
🔒 PDFDownload this self-assessment, with answers
A. Written Assessment
- What are the primary structural elements involved in building formwork? (3 marks)
- Identify and describe three common types of formwork used in construction projects. (6 marks)
🔒20 more in this section.
Chapter Examination Questions
🔒 PDFDownload these examination questions, with worked answers
SECTION A (40 Marks) - Answer ALL Questions
- Explain the role of formwork in concrete construction and why accurate formwork measurements are critical in a project such as the Nairobi West Hospital expansion. (4 marks)
- Identify and describe four common types of formwork used in building construction projects in Kenya. (4 marks)
🔒18 more in this section.
Chapter Practical Activities
Practical 1: Identify and mark structural elements for building formwork
Quantity Survey · Level 6
Building Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Identify and mark out the footing and column layout requiring formwork, with footing dimensions 1200mm x 1200mm x 300mm deep and column 300mm x 300mm x 1500mm high.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Measuring Tape (5m) | Safety Helmet |
| Spirit Level | Safety Boots |
| Builder's Square | Reflective Jacket |
| Plumb Bob | |
| Chalk Line / Lime | |
| Hammer | |
| Marking Pens | |
| Nails 2 inch | |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level | 1 Pc per Candidate |
| 3 | Builder's Square | 1 Pc per 4 Candidates |
| 4 | Plumb Bob | 1 Pc per Candidate |
| 5 | Chalk Line / Lime | 1 Pc per Candidate |
| 6 | Hammer | 1 Pc per 4 Candidates |
| 7 | Nails 2 inch | Sufficient per Candidate |
| 8 | Marking Pens | 1 Pc per Candidate |
| 9 | Safety Helmet | 1 Pc per Candidate |
| 10 | Safety Boots | 1 Pair per Candidate |
| 11 | Reflective Jacket | 1 Pc per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Identification and Marking Out of Structural Elements |
Identified and donned all required PPEs (helmet, boots, reflective jacket) (Award 1 mark for each correctly worn PPE) | 3 | | |
Assembled all necessary tools and materials before starting work (Award 1/2 mark for each of at least four tools assembled, max 2 marks) | 2 | | |
Prepared the site by clearing and selecting appropriate area for marking out (Award 2 marks for proper site preparation and clearance) | 2 | | |
Measured and marked footing layout accurately to 1200mm x 1200mm with 300mm depth indication (Award 1 mark for each correctly marked dimension corner, 4 marks total) | 4 | | |
Measured and marked column layout accurately to 300mm x 300mm with height indication of 1500mm (Award 1 mark for each correctly marked dimension corner, 4 marks total) | 4 | | |
Used builder's square and plumb bob to ensure right angles and vertical alignment marks (Award 1 mark for correct use of builder's square, 2 marks for plumb bob vertical marking) | 3 | | |
Transferred measurements correctly from working drawing to site using measuring tape and chalk line/lime (Award 1 mark for each correct transfer of footing, column, and depth markings) | 3 | | |
Marked out the key structural elements clearly and neatly on the ground using lime or chalk line (Award 3 marks for clear, visible, and neat marking of all required elements) | 3 | | |
Cleaned the site and stored tools properly after completion of marking out (Award 1 mark for cleaning site, 1 mark for proper tool storage) | 2 | | |
| Sub-Total | 26 | | |
| PRODUCT CHECKLIST |
Footing dimensions correctly marked at 1200mm x 1200mm with 300mm depth indication (+50mm tolerance) (Award 4 marks for all footing dimensions within tolerance) | 4 | | |
Column dimensions correctly marked at 300mm x 300mm with 1500mm height indication (+50mm tolerance) (Award 4 marks for all column dimensions within tolerance) | 4 | | |
Markings are square with correct diagonals for footing and column layout (max 5mm tolerance) (Award 4 marks for correct squareness and diagonal accuracy) | 4 | | |
Vertical alignment marking for column is plumb within +10mm tolerance (Award 3 marks for correct plumbness marking) | 3 | | |
Overall neatness and clarity of the marked layout on site (Award 3 marks for clean, clear, and professional marking) | 3 | | |
| Sub-Total | 18 | | |
| GRAND TOTAL | 44 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
Practical 2: Select and Classify Appropriate Formwork Types for Structural Elements
Quantity Survey · Level 6
Building Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Select and classify appropriate formwork types for a 300mm x 300mm reinforced concrete column, a 120mm thick slab spanning 3m, and a 600mm wide beam.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Measuring Tape (5m) | Nails 2 inch |
| Spirit Level | Plywood Sheets (12mm thick) |
| Hammer | Timber Battens 50mm x 25mm |
| Carpenter's Square | Steel Props Adjustable |
| Chalk Line | |
| Pen and Notebook | |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level | 1 Pc per Candidate |
| 3 | Hammer | 1 Pc per 4 Candidates |
| 4 | Carpenter's Square | 1 Pc per Candidate |
| 5 | Nails 2 inch | Sufficient per Candidate |
| 6 | Plywood Sheets (12mm thick) | 4 sheets per Candidate |
| 7 | Timber Battens 50mm x 25mm | 8m length per Candidate |
| 8 | Steel Props Adjustable | 4 pcs per Candidate |
| 9 | Chalk Line | 1 Pc per Candidate |
| 10 | Pen and Notebook | 1 set per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: OBSERVE PPE AND TOOL PREPARATION |
Identified and used appropriate PPE including helmet, safety boots, and gloves (Award 1 mark for each correct PPE worn) | 3 | | |
Assembled and prepared required tools and materials correctly for the task (Award 1 mark for each correctly assembled tool/material up to 3 marks) | 3 | | |
Cleared and prepared a sufficient workspace for formwork selection activity (Award 2 marks for proper site preparation) | 2 | | |
Demonstrated safe handling and storage of materials during the task (Award 2 marks for correct handling and storage) | 2 | | |
Used measuring tools accurately to verify dimensions of formwork materials (Award 1 mark each for correct use of tape, spirit level, carpenter's square) | 3 | | |
Marked and recorded formwork types clearly and correctly in notebook (Award 2 marks for correct and clear classification notes) | 2 | | |
| Sub-Total | 15 | | |
| TASK 2: FORMWORK TYPE SELECTION AND CLASSIFICATION |
Selected suitable formwork type for the 300mm x 300mm column (e.g. timber shuttering with plywood facing) (Award 3 marks for correct formwork type selection and justification) | 3 | | |
Selected appropriate formwork type for the 120mm thick slab spanning 3m (e.g. timber formwork with props and soffit support) (Award 3 marks for correct formwork type selection and justification) | 3 | | |
Selected proper formwork type for the 600mm wide beam (e.g. timber or steel panel formwork with adequate support) (Award 3 marks for correct formwork type selection and justification) | 3 | | |
Classified formwork types into traditional and modern categories accurately (Award 3 marks for correct classification with examples) | 3 | | |
Explained advantages and disadvantages of selected formwork types for each structural element (Award 4 marks for clear and accurate explanation) | 4 | | |
| Sub-Total | 16 | | |
| PRODUCT CHECKLIST |
Formwork selections correctly match the structural element dimensions: 300mm x 300mm column, 120mm slab thickness, 600mm beam width (Award 5 marks for correct dimension matching) | 5 | | |
Formwork types are classified correctly into traditional and modern categories with examples (Award 5 marks for accurate classification) | 5 | | |
Written notes and sketches are neat, clear, and demonstrate understanding of formwork types and suitability (Award 4 marks for neatness and clarity) | 4 | | |
| Sub-Total | 14 | | |
| GRAND TOTAL | 45 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
🔒Select Suitable Formwork Materials for Column ConstructionPractical 3
🔒Measure and mark formwork dimensions for a rectangular footingPractical 4
🔒Cut and prepare timber components for 200mm x 200mm x 750mm formworkPractical 5
🔒Assemble and Install Column Formwork 300mm x 300mm x 1500mm HighPractical 6
🔒Check and Adjust Formwork Alignment and Stability for a 2000mm x 600mm x 400mm Concrete BeamPractical 7
🔒Dismantle timber formwork for a 2000mm x 300mm x 500mm concrete beam safelyPractical 8
🔒Handle, clean, and store formwork materials after dismantlingPractical 9
🔒Prepare working drawing for formwork layout of a reinforced concrete beamPractical 10