Quantity Survey  ·  Level 6
Building Temporary Works
Chapter 1: Construct and dismantle trench timbering
📚 6 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Select the right trench timbering materials and tools following construction rules and regulations.
  • Choose, fit, and use the correct personal protective equipment (PPE) to stay safe on site.
  • Construct trench timbering safely, taking into account soil type and site topography.
  • Dismantle trench timbering safely by following site procedures and structural safety requirements.
  • Identify suitable formwork materials based on the structure’s complexity, job drawings, or supervisor instructions.
  • Measure and determine accurate formwork dimensions to support structural elements properly.
  • Safely erect the correct type of formwork for the structural element to be cast.
  • Apply oil to timber formwork surfaces correctly to make dismantling easier after the concrete sets.
  • Securely fix formwork into position following construction rules and regulations.
  • Dismantle formwork safely by following site procedures and critical structural safety requirements.

Mastering these skills helps you build safe, strong temporary structures that protect workers and ensure quality construction every time.

Constructing and dismantling trench timbering is a critical competence within quantity surveying, especially in Kenya’s construction sector where excavation works form the backbone of many infrastructural projects. Temporary works such as trench timbering ensure safety and structural integrity during excavation, protecting workers and adjacent structures from collapse. Quantity surveyors play a pivotal role in specifying, costing, and managing these timbering systems, requiring a firm understanding of materials and tools involved to optimize project efficiency and safety compliance.

1.1 Trench Timbering Materials and Tools Assignment

Trench timbering involves the use of various materials and specialized tools to support trench walls during excavation. Quantity surveyors must be conversant with these components to accurately assess costs, procurement needs, and ensure compliance with occupational safety standards such as those stipulated by the Directorate of Occupational Safety and Health Services (DOSHS) in Kenya. This knowledge is essential when preparing bills of quantities, tender documents, and supervising site operations in urban or rural projects alike.

1.1.1 Timbering Materials: Types and Characteristics

The selection of timbering materials impacts both the safety and cost efficiency of trench support systems. Timber must be robust enough to withstand lateral earth pressures and environmental conditions common in Kenyan soils, which vary from clay to sandy loams.

Types of Timber Used in Trench Timbering

  • Sawn Timber Boards: These are standard rectangular planks used for sheeting the trench walls. They provide a continuous surface to prevent soil collapse and are typically sourced from indigenous hardwoods like Meru oak or imported softwoods treated for durability.
  • Struts: Horizontal timber pieces that brace the trench walls against inward pressure. Their strength and length must be sufficient to span the trench width without bending or breaking.
  • Walers: Vertical or horizontal beams that distribute the load from struts or sheeting to the ground or other supports. They stabilize the timbering structure and prevent localized failure.
  • Chocks and Wedges: Smaller timber pieces used to tighten and secure joints between main timber components, ensuring a snug fit that resists movement.
  • Treated Timber: To resist decay and termite attack prevalent in Kenya’s tropical climate, timber used in trenching is often chemically treated, extending service life and reducing replacement frequency.

Characteristics Required of Timbering Materials

  • Strength and Durability: Timber must support significant earth pressure without deformation or failure.
  • Moisture Resistance: Given the frequent exposure to groundwater and rain in Kenyan sites, timber should resist warping and rotting.
  • Workability: Timber should be easy to cut, nail, and fit on site, enabling quick assembly and dismantling.
  • Availability and Cost: Locally sourced timber reduces project costs and lead times, enhancing procurement efficiency.
  • Safety Compliance: Materials must meet Kenyan safety regulations to minimize on-site hazards during excavation.

1.1.2 Tools Used in Trench Timbering: Specifications and Functions

Efficient construction and dismantling of trench timbering rely on a suite of hand and power tools designed for precision and safety. Quantity surveyors need to consider the cost of these tools as part of temporary works budgeting and ensure their availability on site.

Name Specification Use
Hammer Claw hammer, 500-700g weight Driving and removing nails in timber components
Saw Handsaw or power saw, 24-inch blade Cutting timber to required lengths and angles
Spirit Level 600mm length, bubble vial Ensuring timbering components are horizontally and vertically aligned
Measuring Tape Steel tape, 5m or 10m length Accurate measurement of timber and trench dimensions
Crowbar Steel, 600-900mm length Leveraging and prying timber components during assembly/disassembly

Usage and Maintenance of Timbering Tools

  • Hammer: Used primarily for nailing timber components together; regular inspection for handle integrity prevents accidents.
  • Saw: Cutting timber to precise sizes; blades must be sharpened frequently to maintain clean cuts and reduce effort.
  • Spirit Level: Critical for alignment to prevent uneven pressure distribution; stored carefully to avoid damage to the vial.
  • Measuring Tape: Essential for accurate timber sizing; retracted carefully to avoid kinks or breaks.
  • Crowbar: Facilitates dismantling and adjustment of timber; kept rust-free and inspected for bends or cracks.

1.1.3 Assignment of Materials and Tools in Quantity Surveying Practice

In the Kenyan construction environment, quantity surveyors must coordinate the assignment of timbering materials and tools efficiently to optimize costs and ensure timely project delivery. This involves detailed specification, cost estimation, and management of procurement and inventory.

Key Considerations in Material and Tool Assignment

  • Accurate Bill of Quantities Preparation: Detailed quantification of timber sizes, types, and tool requirements reduces waste and cost overruns.
  • Supplier Selection and Sourcing: Preference for suppliers offering treated timber and reliable tool hire services minimizes delays and quality issues.
  • Cost Control and Budgeting: Monitoring market prices of timber and tools helps manage project budgets effectively.
  • Site Logistics and Storage: Proper storage of timber and tools on site prevents damage and theft, common challenges in Kenyan urban projects.
  • Coordination with Site Safety Officers: Ensuring that tools and materials meet safety standards to avoid accidents during trench excavation.

1.1.4 Challenges in Procuring and Managing Timbering Materials and Tools and Mitigation Strategies

Procurement and management of trench timbering components in Kenya face obstacles such as fluctuating material costs, supply chain delays, and onsite misuse or damage. Quantity surveyors must anticipate and mitigate these challenges to uphold project timelines and budgets.

Challenges

  • Price Volatility: Timber prices can vary due to seasonal demand and import costs, affecting budgeting accuracy.
  • Supply Chain Disruptions: Remote sites may experience delays in delivery due to poor roads or logistical constraints.
  • Quality Variability: Inconsistent timber quality from local suppliers can compromise safety and durability.
  • Tool Theft and Misuse: Security on site is vital as tools are prone to theft or improper handling.
  • Storage Limitations: Limited space on congested sites complicates proper storage of timber and tools.

Mitigation Strategies

  • Bulk Purchasing Agreements: Negotiating volume discounts with suppliers stabilizes prices and ensures supply.
  • Local Sourcing: Engaging local timber yards reduces transportation delays and supports the local economy.
  • Quality Inspection Protocols: Implementing acceptance criteria and random checks prevents substandard materials from entering the site.
  • Tool Inventory Management: Using sign-out registers and secure storage reduces loss and misuse.
  • Site Layout Planning: Allocating designated storage areas protects materials from weather and damage.

Practice Questions

  1. Explain the importance of selecting treated timber in trench timbering within Kenyan construction sites. (6 marks)

  2. List and describe five essential tools used in trench timbering, including their specifications and uses. (10 marks)

  3. Discuss the challenges faced in procuring trench timbering materials in Kenya and propose mitigation strategies for each. (10 marks)

  4. How does accurate assignment of timbering materials and tools contribute to effective cost control in quantity surveying? Provide examples. (8 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Soil mechanics

Understanding soil mechanics is fundamental for quantity surveyors involved in the construction and dismantling of trench timbering. The stability and safety of trenches largely depend on the properties and behavior of the soil encountered on site. In Kenya, w…

🔒1.3 Site Investigation

Site investigation is a critical preliminary activity in the construction of trench timbering, ensuring safety, cost-effectiveness, and structural integrity. For Quantity Surveyors in Kenya, conducting thorough site investigations informs accurate cost estimat…

🔒1.4 Trench timbering methods

Trench timbering is an essential safety and structural practice in civil construction projects involving excavation. For Quantity Surveyors in Kenya, understanding trench timbering methods is critical to accurate cost estimation, risk assessment, and ensuring…

🔒1.5 Trench layout design

Trench layout design is a critical aspect of temporary works in construction projects, particularly for quantity surveyors who must ensure accuracy in planning, cost estimation, and resource allocation. In Kenya, where infrastructure development projects frequ…

🔒1.6 Trench Timbering Dismantling

In the Kenyan construction industry, trench timbering is critical for ensuring worker safety and structural stability during excavation. Dismantling trench timbering requires careful planning and execution to prevent accidents, avoid damage to materials, and c…

Chapter Summary

This chapter covered the essential materials and tools required for trench timbering, emphasizing the importance of selecting appropriate timber and equipment for safety and efficiency. It explored soil mechanics, detailing how different soil types affect trench stability and the need for adequate support. Site investigation techniques were discussed to assess ground conditions and identify potential hazards before excavation. Various trench timbering methods were explained, highlighting their suitability for different soil and trench conditions. The chapter also addressed trench layout design, focusing on planning timber placement to ensure structural integrity. Finally, procedures for the safe and systematic dismantling of trench timbering were presented to prevent accidents and preserve materials for reuse.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Identify five common materials used in trench timbering and explain their suitability for use in Kenyan construction sites. (5 marks)
  2. What is the significance of understanding soil mechanics in the design of trench timbering? Provide two reasons. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Identify five common materials used in trench timbering and explain one advantage of each in the context of a Nairobi County road excavation project. (4 marks)
  2. Describe the effect of soil moisture content on trench stability during excavation works at a Nairobi Water Company site. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify and select trench timbering materials and tools

Quantity Survey · Level 6
Building Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and select timbering materials and tools suitable for constructing trench timbering for a trench 2m deep and 1.2m wide as per the provided site requirements.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Timber Boards 25mm thick, 3m length
Spirit LevelNails 2 inch
HammerPPE Kit (Helmet, Safety boots, Gloves, Reflective jacket)
Saw (Hand saw)
Plumb Bob
Chisel
Marking Chalk/Lime
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Spirit Level1 Pc per Candidate
3Hammer1 Pc per 4 Candidates
4Saw (Hand saw)1 Pc per Candidate
5Shovel1 Pc per 4 Candidates
6Plumb Bob1 Pc per Candidate
7Nails 2 inchSufficient per Candidate
8Timber Boards 25mm thick, 3m length8 m length per Candidate
9PPE Kit (Helmet, Safety boots, Gloves, Reflective jacket)1 set per Candidate
10Chisel1 Pc per Candidate
11Marking Chalk/LimeSufficient per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and Selection of Trench Timbering Materials and Tools
Candidate dons all required PPE correctly
(Award 1 mark for each correct PPE worn: helmet, safety boots, gloves, reflective jacket, eye protection)
5
Candidate assembles at least five correct tools for trench timbering
(Award 0.5 mark for each correctly selected tool, max 3 marks)
3
Candidate selects timber boards of correct thickness and length suitable for trench timbering
(Award 4 marks for correct selection of 25mm thick, 3m length timber boards)
4
Candidate selects appropriate nails (2 inch) and sufficient quantity
(Award 2 marks for correct nail size and sufficient quantity)
2
Candidate uses measuring tape, spirit level, and plumb bob correctly to verify timber dimensions and alignment
(Award 1 mark each for correct use of measuring tape, spirit level, plumb bob, and marking chalk)
4
Candidate inspects timber for defects (knots, splits, warping) and rejects unsuitable pieces
(Award 3 marks for correct inspection and rejection of defective timber)
3
Candidate stores selected materials and tools neatly and safely after inspection
(Award 2 marks for proper cleaning, arranging, and storing)
2
Sub-Total23
PRODUCT CHECKLIST
Timber boards selected are 25mm thick and 3m long as specified
(Award 3 marks for correct dimensions)
3
Nails are 2 inch and quantity is sufficient for trench timbering
(Award 2 marks for correct nail size and quantity)
2
Tools selected match the requirements for trench timbering
(Award 3 marks for correct tools selection)
3
Materials and tools are clean, undamaged, and ready for use
(Award 2 marks for neatness and care in handling materials and tools)
2
Sub-Total10
GRAND TOTAL33
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Conduct soil classification and testing for trench stability

Quantity Survey · Level 6
Building Temporary Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Perform soil classification and Atterberg limits tests on a soil sample to determine suitability and safety for trench timbering.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Spade/ShovelDistilled water
Soil augerSoil sample
Plastic sampling bags
Soil test tubes
Moisture content cans
Liquid limit device (Casagrande apparatus)
Plastic limit rolling surface
Balance scale (0-500g capacity)
Measuring cylinder 100 ml
Ruler (30 cm)
Pen and notebook
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Spade/Shovel1 Pc per Candidate
2Soil auger1 Pc per Candidate
3Plastic sampling bags5 Pcs per Candidate
4Soil test tubes3 Pcs per Candidate
5Moisture content cans2 Pcs per Candidate
6Liquid limit device (Casagrande apparatus)1 Pc per 5 Candidates
7Plastic limit rolling surface1 Pc per Candidate
8Balance scale (0-500g capacity)1 Pc per 5 Candidates
9Measuring cylinder 100 ml1 Pc per Candidate
10Distilled waterSufficient for tests per Candidate
11Soil identification chart1 Pc per Candidate
12Ruler (30 cm)1 Pc per Candidate
13Pen and notebook1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SAFETY AND PREPARATION
Identified and used appropriate PPE (helmet, safety boots, gloves)
(Award 1 mark each for helmet, boots, gloves)
3
Assembled all required tools and materials before testing
(Award 2 marks for complete assembly, 1 mark for partial)
2
Selected a representative soil sample from the site using correct sampling method
(Award 3 marks for proper sampling technique and depth)
3
Prepared soil samples correctly for moisture content and Atterberg limit tests
(Award 2 marks for correct preparation, 1 mark for partial)
2
Maintained cleanliness and orderliness of workspace during testing
(Award 1 mark for clean and safe working area)
1
Sub-Total11
TASK 2: CONDUCTING SOIL TESTS
Measured moisture content accurately using oven-drying or equivalent method
(Award 4 marks for correct procedure and recording)
4
Determined liquid limit using Casagrande device accurately
(Award 5 marks for proper procedure and consistent results)
5
Determined plastic limit by rolling soil threads correctly
(Award 4 marks for correct rolling method and observation)
4
Recorded all test results clearly and legibly
(Award 2 marks for complete and clear records)
2
Sub-Total15
TASK 3: SOIL CLASSIFICATION AND REPORTING
Calculated plasticity index correctly from test results
(Award 3 marks for accurate calculation)
3
Classified soil type correctly using plasticity chart and soil classification chart
(Award 4 marks for correct soil classification)
4
Assessed soil suitability and trench stability implications based on classification
(Award 4 marks for valid assessment and recommendations)
4
Presented findings clearly in a written report format
(Award 3 marks for clear and concise report)
3
Sub-Total14
PRODUCT CHECKLIST
Test results recorded and calculations accurate with plasticity index matching classification
(Award 6 marks for complete and accurate documentation)
6
Soil classification matches test data and correct soil type identified
(Award 6 marks for correct classification)
6
Report includes clear recommendations on trench timbering suitability and safety
(Award 6 marks for practical and relevant recommendations)
6
Sub-Total18
GRAND TOTAL58
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Perform site investigation for trench timbering setupPractical 3
🔒Design and Mark Out Trench Timbering Layout for 3m Long TrenchPractical 4
🔒Set out trench lines and levels for timbering as per designPractical 5
🔒Assemble and erect trench timbering supports for a 2m deep trenchPractical 6
🔒Install trench timbering supports using hydraulic or mechanical methodsPractical 7
🔒Inspect and Maintain Erected Trench Timbering for StabilityPractical 8
🔒Safe Dismantling of Trench Timbering SupportsPractical 9
🔒Dispose and store timbering materials after dismantling trench timberingPractical 10
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Select the right trench timbering materials and tools following construction rules and regulations.
  • Choose, fit, and use the correct personal protective equipment (PPE) to stay safe on site.
  • Construct trench timbering safely, taking into account soil type and site topography.
  • Dismantle trench timbering safely by following site procedures and structural safety requirements.
  • Identify suitable formwork materials based on the structure’s complexity, job drawings, or supervisor instructions.
  • Measure and determine accurate formwork dimensions to support structural elements properly.
  • Safely erect the correct type of formwork for the structural element to be cast.
  • Apply oil to timber formwork surfaces correctly to make dismantling easier after the concrete sets.
  • Securely fix formwork into position following construction rules and regulations.
  • Dismantle formwork safely by following site procedures and critical structural safety requirements.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.