Building finishes are critical in defining the aesthetic appeal, durability, and functionality of constructed buildings. For Quantity Surveyors in Kenya, understanding the types of finishes and their application methods is essential for accurate cost estimation, procurement planning, and quality assurance during construction projects. Building finishes not only enhance visual appearance but also protect structural elements from environmental damage, contributing to the longevity of the asset. This chapter explores the various types of building finishes and the prevalent methods used in their application within the Kenyan construction industry.
The selection of building finishes depends on factors such as building use, environmental conditions, budget constraints, and desired aesthetics. For Quantity Surveyors, knowledge of these finishes is vital for preparing detailed Bills of Quantities (BoQs), advising on cost-effective alternatives, and ensuring compliance with client specifications. Building finishes broadly fall into categories including surface finishes for walls, floors, ceilings, and external facades.
Wall finishes improve both the appearance and protection of internal and external walls. Internally, plaster and paint are common, while externally, finishes must resist weathering and moisture ingress.
Floor finishes must withstand traffic loads, provide safety, and complement the building’s function. Quantity Surveyors must understand the specifications to estimate materials and labour accurately.
Ceiling finishes contribute to thermal comfort, acoustics, and aesthetics. Quantity Surveyors must consider ceiling types in cost plans and maintenance projections.
External finishes protect the building envelope against weather and impact the overall visual impression. Quantity Surveyors must account for durability and maintenance costs in their assessments.
Explain the importance of wall finishes in building construction and list five common types used in Kenyan buildings. (10 marks)
Describe four types of floor finishes and their suitability for different building uses. (8 marks)
Identify three ceiling finish types and discuss their impact on building functionality. (6 marks)
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the various types of building finishes, emphasizing their role in enhancing both the functionality and aesthetics of structures. It detailed the methods used to apply these finishes, highlighting the importance of proper technique for durability and appearance. Specific application procedures were examined for a range of finishes including tiles, paints, parquets-facing, pebble dash, plaster, render, floor screed, marquees, granolithic finish, terrazzo, cladding, curtain walling, wall in-fills, wallpapers, and ceiling boards, each with its unique process and considerations. The chapter also introduced emerging technologies that are transforming finishing techniques, followed by a focus on smart wall finishes such as advanced aesthetics, heat-reflective coatings, and acoustic finishes that improve building performance. Sustainability was addressed through the discussion of greening practices and the use of renewable resources, particularly natural materials. Finally, the incorporation of recycled content in finishes was highlighted as a key strategy for reducing environmental impact in modern construction.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Sand (fine) |
| Spirit Level | Cement (OPC) |
| Trowel | Water |
| Float | |
| Hawk Board | |
| Mixing Hoe | |
| Wheelbarrow | |
| Bucket |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level | 1 Pc per Candidate |
| 3 | Trowel | 1 Pc per Candidate |
| 4 | Float | 1 Pc per Candidate |
| 5 | Hawk Board | 1 Pc per Candidate |
| 6 | Mixing Hoe | 1 Pc per 4 Candidates |
| 7 | Wheelbarrow | 1 Pc per 4 Candidates |
| 8 | Bucket | 1 Pc per Candidate |
| 9 | Water | Sufficient per Candidate |
| 10 | Sand (fine) | Sufficient per Candidate |
| 11 | Cement (OPC) | Sufficient per Candidate |
| 12 | Protective Gloves | 1 Pair per Candidate |
| 13 | Dust Mask | 1 Pc per Candidate |
| 14 | Safety Goggles | 1 Pc per Candidate |
| 15 | Protective Apron | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and Application Process | |||
| Identified and used appropriate PPE (gloves, dust mask, goggles, apron) (Award 1 mark for each correct PPE worn) | 4 | ||
| Assembled all necessary tools and materials before starting (Award 2 marks for assembling all required tools and materials) | 2 | ||
| Prepared the wall surface by cleaning and removing loose particles (Award 3 marks for thorough surface preparation) | 3 | ||
| Mixed plaster/render with correct cement to sand ratio (1:4) and water to achieve workable consistency (Award 5 marks for correct mixing ratio and consistency) | 5 | ||
| Applied the first coat (scratch coat) evenly ensuring proper thickness (10mm approx.) (Award 5 marks for uniform and correct thickness application) | 5 | ||
| Applied the second coat (float coat) smoothly and evenly after initial set of first coat (Award 5 marks for smooth and even float coat application) | 5 | ||
| Finished with a smooth trowelled surface ensuring no cracks or unevenness (Award 4 marks for neat, smooth finishing without defects) | 4 | ||
| Cleaned the working area after completion (Award 2 marks for proper cleaning of the work area) | 2 | ||
| Cleaned and stored tools and materials correctly after use (Award 2 marks for correct cleaning and storage) | 2 | ||
| Sub-Total | 32 | ||
| PRODUCT CHECKLIST | |||
| Plastered/rendered wall surface measuring approximately 2500mm wide by 2000mm high within ±50mm tolerance (Award 5 marks for correct dimensions within tolerance) | 5 | ||
| Wall surface is smooth, even and free from cracks or blisters (Award 5 marks for surface quality and uniformity) | 5 | ||
| Plaster thickness uniform and consistent at approximately 15mm total thickness (Award 5 marks for consistent and correct thickness) | 5 | ||
| Rendered finish is well bonded to the wall with no peeling or detachment (Award 3 marks for good adhesion and bonding) | 3 | ||
| Overall neatness and workmanship of the finished wall (Award 5 marks for overall presentation and care) | 5 | ||
| Sub-Total | 23 | ||
| GRAND TOTAL | 55 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Cement |
| Spirit Level (600mm) | Sharp sand |
| Trowel | Granolithic aggregate |
| Float | Water |
| Wheelbarrow | |
| Shovel | |
| Compaction rod | |
| Buckets |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level (600mm) | 1 Pc per Candidate |
| 3 | Trowel | 1 Pc per Candidate |
| 4 | Float (wooden or plastic) | 1 Pc per Candidate |
| 5 | Wheelbarrow | 1 Pc per 4 Candidates |
| 6 | Shovel | 1 Pc per 4 Candidates |
| 7 | Compaction rod (steel rod 20mm diameter, 600mm long) | 1 Pc per Candidate |
| 8 | Buckets (20L capacity) | 2 Pcs per Candidate |
| 9 | Water supply | Sufficient per Candidate |
| 10 | Cement (Portland cement) | 5 kg per Candidate |
| 11 | Sharp sand | 15 kg per Candidate |
| 12 | Granolithic aggregate (granite chippings 3-6 mm) | 10 kg per Candidate |
| 13 | Protective gloves | 1 Pair per Candidate |
| 14 | Safety boots | 1 Pair per Candidate |
| 15 | Dust mask | 1 Pc per Candidate |
| 16 | Protective eyewear | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: PREPARATION AND MIXING | |||
| Identified and used appropriate PPE (gloves, boots, dust mask, eyewear) (Award 1 mark for each correctly donned PPE item) | 5 | ||
| Assembled all required tools and materials before starting (Award 0.5 marks for each of six or more tools/materials assembled) | 3 | ||
| Prepared the floor area by cleaning and removing debris (Award 2 marks for thorough cleaning and clearing) | 2 | ||
| Measured and marked the 2.5m x 2.5m screed area accurately (Award 1 mark each for correct length, width, and marking method) | 3 | ||
| Mixed floor screed in correct proportion (1:3 cement to sand by volume) with uniform consistency (Award 4 marks for proper ratio and uniform mix, 2 marks for attempted mixing) | 4 | ||
| Sub-Total | 17 | ||
| TASK 2: LAYING AND FINISHING | |||
| Laid floor screed evenly to 25mm thickness over the marked area (Award 4 marks for correct thickness and even application) | 4 | ||
| Compacted screed uniformly using compaction rod immediately after laying (Award 3 marks for uniform compaction without segregation) | 3 | ||
| Applied granolithic finish mix (1:2 cement to granite chippings) uniformly over screed (Award 4 marks for proper mix application and coverage) | 4 | ||
| Trowelled and floated granolithic finish to achieve a smooth and level surface (Award 4 marks for smooth, level and durable finish) | 4 | ||
| Cleaned and stored tools properly after completion (Award 2 marks for cleaning and correct storage) | 2 | ||
| Sub-Total | 17 | ||
| PRODUCT CHECKLIST | |||
| Finished floor screed dimensions correct within ±50mm tolerance (2500mm x 2500mm area, 25mm thickness) (Award 2 marks each for length, width, and thickness within tolerance) | 6 | ||
| Granolithic finish surface is smooth, level, and free from cracks or segregation (Award 6 marks for durable, uniform, and crack-free finish) | 6 | ||
| Overall neatness and workmanship of the finished floor surface (Award 4 marks for professional appearance and care) | 4 | ||
| Sub-Total | 16 | ||
| GRAND TOTAL | 50 | ||