By the end of this chapter, you will be able to:
Mastering these skills ensures you can maintain building structures safely and effectively, which is essential for quality and durability in the construction trade.
Building maintenance is a critical aspect of quantity surveying that ensures the longevity, safety, and functionality of constructed assets. For quantity surveyors in Kenya, understanding building inspection procedures and performing relevant tests is essential in identifying defects, estimating repair costs, and advising clients appropriately. This chapter explores systematic approaches to building inspection and the role of written tests in verifying material quality and workmanship during maintenance works.
Building inspection procedures provide a structured method for assessing the condition of a building, identifying defects, and determining maintenance needs. Quantity surveyors must master these procedures to produce accurate maintenance cost estimates and ensure the building complies with safety and quality standards. Effective inspections reduce costly surprises during maintenance and support decision-making for repair prioritization.
Building inspections serve several vital functions in the maintenance process. They help quantity surveyors and maintenance teams to:
Different inspections focus on specific aspects of building condition. Quantity surveyors collaborate with engineers and specialists to cover all relevant areas:
A systematic approach ensures thoroughness and consistency in inspections. Quantity surveyors often lead or coordinate this process:
Building inspections often face practical difficulties that quantity surveyors must manage effectively.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter focused on the essential procedures involved in carrying out building maintenance works, beginning with building inspection procedures that outline systematic methods for assessing the condition of structures. It then explored building diagnosis, emphasizing the identification of defects and their underlying causes to determine appropriate interventions. The preparation of inspection reports was covered, highlighting the importance of clear, detailed documentation to guide maintenance decisions. Various types of maintenance were examined, including preventive, corrective, routine, and emergency maintenance, each serving distinct purposes to prolong building lifespan. Practical aspects were integrated through projects that reinforce the application of theoretical knowledge. Finally, the chapter addressed the preparation of maintenance programs, which involve planning and scheduling maintenance activities to ensure effective building management and resource allocation. Together, these topics provide a comprehensive framework for maintaining building integrity and safety.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Safety Helmet |
| Spirit Level (600mm) | Safety Boots |
| Hammer | Reflective Safety Jacket |
| Flashlight | |
| Ladder (3m) | |
| Chisel | |
| Plumb Bob | |
| Notebook and Pen | |
| Chalk or Marker |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level (600mm) | 1 Pc per Candidate |
| 3 | Hammer | 1 Pc per 4 Candidates |
| 4 | Flashlight | 1 Pc per Candidate |
| 5 | Ladder (3m) | 1 Pc per 4 Candidates |
| 6 | Notebook and Pen | 1 Set per Candidate |
| 7 | Chisel | 1 Pc per Candidate |
| 8 | Plumb Bob | 1 Pc per Candidate |
| 9 | Safety Helmet | 1 Pc per Candidate |
| 10 | Safety Boots | 1 Pair per Candidate |
| 11 | Reflective Safety Jacket | 1 Pc per Candidate |
| 12 | Chalk or Marker | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: BUILDING INSPECTION PROCEDURES | |||
| Identified and used appropriate PPEs in line with safety regulations (Award 1 mark for each PPE donned: helmet, boots, jacket, gloves, eye protection) | 5 | ||
| Assembled all necessary inspection tools and equipment prior to inspection (Award 1 mark each for assembling at least three key tools) | 3 | ||
| Checked external walls for visible cracks, dampness, and surface defects (Award 1 mark each for checking cracks, dampness, peeling paint, and loose finishes) | 4 | ||
| Measured verticality (plumb) of walls using plumb bob and spirit level (Award 2 marks for correct plumb measurement, 2 marks for correctly recording results) | 4 | ||
| Checked horizontal levels of floors and window sills using spirit level (Award 2 marks for correct leveling technique, 2 marks for accurate notes) | 4 | ||
| Inspected roof covering for missing or damaged tiles and water leakage signs (Award 1 mark each for checking tiles, leaks, and gutter condition) | 3 | ||
| Checked doors and windows for proper alignment, operation, and damage (Award 1 mark each for alignment, operation, damage, and locking mechanism) | 4 | ||
| Observed electrical fittings for safety and proper installation visually (Award 1 mark each for checking sockets, switches, and wiring condition) | 3 | ||
| Recorded all defects and observations clearly and systematically in the notebook (Award 1 mark for each of five clear and organized defect entries) | 5 | ||
| Cleaned the inspection site and stored tools properly after completion (Award 1 mark each for cleaning and proper storing) | 2 | ||
| Sub-Total | 37 | ||
| PRODUCT CHECKLIST | |||
| Complete and clear inspection report with all defects identified and measurements recorded (Award 2 marks each for completeness, clarity, accuracy, neatness, and organization) | 10 | ||
| Correct identification of structural defects such as cracks, dampness, and plumb deviations within ±10mm tolerance (Award 2 marks each for correct identification of 4 key defects) | 8 | ||
| Correct identification of finishing defects including paint peeling, loose tiles, and misaligned doors/windows (Award 1 mark for each correctly identified finishing defect) | 5 | ||
| Report includes recommendations for maintenance or repair actions (Award up to 5 marks for relevant and practical recommendations) | 5 | ||
| Overall neatness and professionalism of the final report (Award 5 marks for neat, legible, and professionally presented report) | 5 | ||
| Sub-Total | 33 | ||
| GRAND TOTAL | 70 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | PPE Set (Helmet, Safety Boots, Reflective Jacket, Gloves) |
| Spirit Level (600mm) | |
| Hammer | |
| Chisel | |
| Magnifying Glass | |
| Notebook and Pen | |
| Camera |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Spirit Level (600mm) | 1 Pc per Candidate |
| 3 | Hammer | 1 Pc per 4 Candidates |
| 4 | Chisel | 1 Pc per Candidate |
| 5 | Magnifying Glass | 1 Pc per Candidate |
| 6 | Notebook and Pen | 1 Set per Candidate |
| 7 | Camera (optional for documentation) | 1 Pc per Candidate |
| 8 | PPE Set (Helmet, Safety Boots, Reflective Jacket, Gloves) | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: BUILDING DEFECTS DIAGNOSIS | |||
| Identified and used appropriate PPE in line with occupational safety and health regulations (Award 1 mark for each PPE correctly worn: Helmet, Safety Boots, Reflective Jacket, Gloves, and adherence to safety procedures) | 5 | ||
| Assembled and used all necessary inspection tools correctly before starting (Award 1 mark each for correct use of Measuring Tape, Spirit Level, and Magnifying Glass) | 3 | ||
| Conducted systematic visual inspection of the external wall surface (Award 1 mark for inspecting all four wall quadrants and noting defects) | 4 | ||
| Measured and recorded dimensions of affected wall areas accurately within ±10mm tolerance (Award 1 mark each for length, height, and width measurements correctly taken) | 3 | ||
| Used hammer and chisel appropriately to test suspected defect areas without causing additional damage (Award 1 mark for correct and safe use of hammer and chisel during inspection) | 3 | ||
| Identified and categorized defects such as cracks, dampness, efflorescence, and paint blistering (Award 1 mark for each defect type correctly identified and explained) | 5 | ||
| Recorded findings clearly and legibly in the notebook, including sketches or notes where necessary (Award 1 mark for clarity, completeness, legibility, and inclusion of sketches or photos) | 4 | ||
| Cleaned and stored tools properly after completion of the inspection (Award 1 mark each for cleaning and proper storing) | 2 | ||
| Sub-Total | 29 | ||
| PRODUCT CHECKLIST | |||
| Accurate measurement of external wall area inspected (approx. 4000mm x 3000mm) within ±10mm tolerance (Award 4 marks for correct dimensions recorded) | 4 | ||
| Correct identification and categorization of at least four different types of defects (Award 1.5 marks for each correctly identified defect type with cause analysis) | 6 | ||
| Clear, organized, and legible defect report with sketches or photos where applicable (Award 5 marks for a comprehensive and neat report) | 5 | ||
| Proper use and care of tools and PPE maintained throughout the task (Award 2 marks for proper tool use, 2 marks for PPE adherence during inspection) | 4 | ||
| Sub-Total | 19 | ||
| GRAND TOTAL | 48 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.