Plumbing  ·  Level 5
Drainage System Installation I
Chapter 2: Install below ground drainage system
📚 8 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Apply safety measures correctly to protect yourself and others while working.
  • Prepare below ground drainage materials accurately by reading and following the working drawing.
  • Assemble the drainage tools and equipment needed for the job correctly and efficiently.
  • Prepare drainage trenches safely and accurately according to the work requirements.
  • Install drainage pipework accurately following the drainage system layout.
  • Construct drainage access points correctly and safely by following the proper work procedures.
  • Perform a functionality test safely and correctly to ensure the drainage system works well.
  • Conduct proper housekeeping to keep your work area clean and safe throughout the job.

Mastering these skills helps you build strong, reliable drainage systems that keep communities safe and healthy!

Compiled by: Joseph Njoroge

Installing below ground drainage systems is a critical aspect of plumbing that ensures effective wastewater and stormwater management in buildings and infrastructure. In Kenya, proper installation safeguards public health by preventing contamination and flooding, especially in urban areas like Nairobi and Mombasa where drainage challenges are frequent. This chapter focuses on the essential practices and safety measures that plumbing professionals must follow when working below ground. Personal protective equipment (PPE) forms the foundation for safety during such installations, protecting workers from physical, chemical, and biological hazards on site.

2.1 Personal Protective Equipment

2.1.1 Hardhat / Helmet

The hardhat or helmet is a vital piece of PPE designed to protect the plumber’s head from impact injuries, falling objects, and electrical hazards encountered on site. It is mandatory on all construction and installation sites, including drainage works in hospitals and schools, where overhead risks are common.

Protection Against Impact Injuries

Hardhats are engineered to absorb and deflect blows from falling debris, tools, or materials that may drop during excavation or pipe laying operations. This protection is crucial in confined trenches where space is limited and workers are vulnerable to overhead hazards.

Electrical Hazard Resistance

Some drainage sites expose plumbers to live wiring or underground cables. Hardhats made from non-conductive materials provide insulation against electrical shocks, which is essential when working near power lines or electrical installations, such as at county government offices.

Design Features and Comfort

Modern hardhats include adjustable suspension systems to fit various head sizes securely, ventilation slots to reduce heat buildup, and sweatbands for comfort during long shifts. Kenyan plumbers working in hot climates benefit from these features, as they reduce fatigue and improve focus.

Compliance with Kenyan Standards

Hardhats used in plumbing must meet standards set by the Kenya Bureau of Standards (KEBS), ensuring durability and reliability. Employers at institutions like Nairobi Hospital enforce strict PPE policies requiring certified helmets to minimize liability and protect their workforce.

2.1.2 Safety Gloves

Safety gloves shield the hands from cuts, abrasions, chemical exposure, and infections that plumbers face when handling pipes, solvents, and contaminated soil during drainage installation.

Types of Gloves for Drainage Work

Different gloves suit varied tasks: heavy-duty leather gloves protect against mechanical injuries during pipe cutting, while nitrile or latex gloves guard against chemical irritants and biological contaminants common in sewage handling.

Chemical and Biological Resistance

Plumbers often come into contact with wastewater containing pathogens and harsh cleaning agents. Gloves made from materials resistant to these hazards prevent skin infections and allergic reactions, which are prevalent in settings like retail food outlets and hotels where drainage systems must meet hygiene standards.

Grip and Dexterity Considerations

Effective gloves balance protection with flexibility, allowing plumbers to manipulate small fittings and tools with precision. Gloves with textured palms improve grip on slippery pipes, reducing accidents on muddy or wet sites such as farms or cooperative processing plants.

Proper Maintenance and Replacement

Gloves should be inspected regularly for tears, holes, or degradation. Frequent replacement is necessary to maintain protective integrity, especially when gloves are exposed to harsh substances or wear from repetitive tasks.

2.1.3 Dustcoat / Overall

Dustcoats or overalls provide full-body protection against dirt, chemical splashes, and physical abrasions encountered during below ground drainage system installation.

Barrier Against Contaminants

Overalls prevent contaminants from contacting the wearer’s skin or personal clothing, reducing the risk of skin infections and cross-contamination. This is particularly important in healthcare facilities like Kenyatta National Hospital, where sanitation is critical.

Protection from Physical Hazards

Thick, durable fabric overalls shield plumbers from cuts and bruises caused by rough surfaces, sharp tools, and pipe edges encountered during excavation and fitting.

Enhancing Visibility and Identification

High-visibility overalls with reflective strips improve safety in low-light conditions or busy sites, such as county government roadworks, by making workers easily identifiable to vehicle operators and machinery drivers.

Comfort and Mobility

Ergonomically designed overalls made from breathable materials allow ease of movement and reduce heat stress in Kenya’s hot climate, enabling plumbers to work efficiently over extended periods.

2.1.4 Safety Shoes / Boots

Safety footwear is essential for protecting feet from crushing injuries, punctures, chemical spills, and slips on uneven or wet surfaces prevalent in drainage installation sites.

Name Specification Use
Safety Boots Steel toe cap, puncture-resistant sole, slip-resistant tread Protect feet from heavy falling objects, sharp debris, and slippery ground

Protection from Impact and Compression

Steel toe caps in safety boots prevent fractures from heavy pipes or machinery parts accidentally dropped during installation. This is critical in warehouse settings supplying plumbing materials.

Puncture Resistance

Soles reinforced with metal plates protect against nails, glass shards, or metal scraps that may be present in excavation trenches, a common hazard in urban building sites.

Slip Resistance and Stability

Drainage installation involves working in wet, muddy conditions. Boots with slip-resistant soles reduce the risk of falls, especially on sloped surfaces found in hotels or retail parks.

Durability and Comfort

Quality safety boots made from waterproof leather and cushioned interiors withstand harsh site conditions while providing comfort for long working hours, as seen in agricultural irrigation projects.

2.1.5 Safety Goggles / Face Mask

Eye and respiratory protection is crucial during below ground drainage installation to guard against dust, chemical splashes, and harmful fumes generated by solvents or disturbed contaminated soil.

Protection Against Dust and Debris

Safety goggles prevent particles dislodged during excavation or pipe cutting from entering the eyes, reducing the risk of irritation or injury. This protection is vital in educational institutions where dust control is regulated.

Chemical Splash Shielding

Goggles with tight seals protect against splashes from acids, detergents, or sewage encountered when cleaning or repairing drainage pipes, common in hotel kitchens or hospital wards.

Respiratory Safety with Face Masks

Face masks filter airborne particles and harmful gases such as methane or hydrogen sulfide that may accumulate in confined drainage trenches, safeguarding the plumber’s lungs.

Types and Selection Criteria

Plumbers must choose appropriate goggles and masks based on site hazards, vented goggles for dusty environments and full-face respirators for high-risk chemical exposure, as practiced in pharmaceutical manufacturing plants.

2.1.6 Workshop SOPs, Rules and Regulations

Standard operating procedures (SOPs), rules, and regulations govern safe practices in plumbing workshops and on-site installations to minimize accidents and ensure legal compliance.

Importance of SOPs in Plumbing Workshops

SOPs provide step-by-step instructions on handling tools, equipment, and hazardous materials safely, reducing errors and injuries. County government workshops enforcing SOPs have recorded significant reductions in workplace accidents.

Compliance with Kenyan Occupational Safety Laws

Adhering to OSHA standards and KEBS guidelines ensures that plumbing activities meet national safety requirements, protecting workers and employers from legal penalties.

Training and Continuous Awareness

Regular safety training sessions keep plumbing professionals updated on new regulations and best practices, fostering a safety culture in companies such as Equity Bank’s facility management teams.

Incident Reporting and Emergency Procedures

Clear rules for reporting accidents and responding to emergencies ensure timely medical intervention and prevent escalation of hazards on sites like retail stores and cooperative societies.

Personal Accountability and Supervision

Workers are expected to follow rules diligently while supervisors monitor compliance, creating a disciplined environment that minimizes risks during drainage system installation.

Practice Questions

  1. Explain how the design features of a hardhat contribute to safety during below ground drainage installation. (6 marks)
  2. Discuss the factors to consider when selecting safety gloves for plumbing work involving wastewater. (8 marks)
  3. Identify five hazards addressed by wearing safety boots on drainage installation sites and explain how boots mitigate these risks. (10 marks)
  4. Outline the role of SOPs in maintaining safety standards in plumbing workshops and on-site installations. (6 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Types of below ground drainage materials / accessories

In the installation of below ground drainage systems, selecting the appropriate materials and accessories is critical to ensure durability, water-tightness, and ease of maintenance. Plumbing professionals in Kenya must understand the range of pipes, fittings,…

🔒2.3 Types of drainage tools and equipment

In below ground drainage system installation, the correct selection and use of tools and equipment greatly influences the quality and efficiency of work. Plumbing professionals in Kenya must be familiar with a range of hand tools and power equipment designed f…

🔒2.4 Preparation of Drainage Trenches

Preparation of drainage trenches is a critical stage in installing below ground drainage systems. In Kenya, where soil types vary from sandy to clayey in different regions, proper trench preparation ensures the durability and functionality of the drainage netw…

🔒2.5 Installation of drainage pipework

Installing drainage pipework below ground is a critical phase in plumbing that demands precision to ensure efficient wastewater flow and prevent leaks or blockages. In Kenya, where varied soil types and climatic conditions impact pipe durability and performanc…

🔒2.6 Construction of Drainage Access Points

Drainage access points are critical features in below ground drainage systems, providing necessary entry for inspection, cleaning, maintenance, and flow management. In Kenya, effective construction of these access points ensures longevity and performance of dr…

🔒2.7 Drainage systems functionality tests

Testing the functionality of below ground drainage systems is a critical step in plumbing installations to ensure the system performs efficiently and safely. In Kenya, where drainage failures can lead to public health risks and costly repairs, rigorous testing…

🔒2.8 Housekeeping

In the installation of below ground drainage systems, effective housekeeping is vital for maintaining a safe, efficient, and professional work environment. In Kenya’s construction and plumbing sectors, particularly on urban sites such as county government offi…

Chapter Summary

This chapter covered the essential aspects of installing a below ground drainage system, beginning with the importance of personal protective equipment such as helmets, gloves, dustcoats, safety boots, goggles, and adherence to workshop safety procedures. It then examined the various types of drainage materials and accessories including waste pipes, fittings such as bends, tees, couplings, and supports like hangers, brackets, clamps, and clips, as well as drainage fixtures. The chapter detailed the tools and equipment required for the installation process, from hacksaws and trowels to spirit levels, drilling machines, plumbing snakes, and sump pumps. Preparation of drainage trenches involved marking the drainage line, excavating the trench, preparing the trench bottom, and setting out the pipes correctly. The installation of the pipework focused on setting pipes, installing supports, cutting pipes to length, assembling fittings, fixing pipes in place, checking alignment and slope, sealing joints, and installing fixtures. Construction of drainage access points such as cleanouts, inspection chambers, septic tanks, biodigesters, access wells, and vent pipes was explained thoroughly. Finally, the chapter emphasized the importance of conducting functionality tests including visual inspections, water flow, pressure, air, backflow, sump pump, and fixture tests, alongside proper housekeeping through care, maintenance, and storage of materials and equipment.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which personal protective equipment is most crucial for protecting your head during below ground drainage installation? (2 marks)
  2. Identify three types of pipe fittings used in below ground drainage systems. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe the importance of wearing a hardhat during below ground drainage installation on a construction site in Nairobi County. (4 marks)
  2. Identify and explain the function of three types of drainage pipe fittings commonly used in below ground drainage systems. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify and Use Below Ground Drainage Materials and Fittings

Plumbing · Level 5
Drainage System Installation I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and assemble a below ground drainage pipe run with PVC pipes and fittings totaling 3 meters in length.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring TapePVC Waste Pipe 110mm diameter
Marker PenPVC Couplings 110mm
GlovesPVC Bends 110mm 45 degrees
Safety BootsPVC Bends 110mm 90 degrees
Safety HelmetPVC Tees 110mm
PVC Inspection Tee 110mm
PVC Cross Tee 110mm
PVC Adapters 110mm to 50mm
Pitcher Tee 110mm
PVC Solvent Cement
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1PVC Waste Pipe 110mm diameter5 meters per Candidate
2PVC Couplings 110mm4 Pcs per Candidate
3PVC Bends 110mm 45 degrees2 Pcs per Candidate
4PVC Bends 110mm 90 degrees2 Pcs per Candidate
5PVC Tees 110mm2 Pcs per Candidate
6PVC Inspection Tee 110mm1 Pc per Candidate
7PVC Cross Tee 110mm1 Pc per Candidate
8PVC Adapters 110mm to 50mm2 Pcs per Candidate
9Pitcher Tee 110mm1 Pc per Candidate
10PVC Solvent Cement250 ml per Candidate
11Measuring Tape1 Pc per Candidate
12Marker Pen1 Pc per Candidate
13Gloves1 Pair per Candidate
14Safety Boots1 Pair per Candidate
15Safety Helmet1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identify and Assemble Below Ground Drainage Materials and Fittings
Donned PPEs including safety boots and helmet
(Award 1 mark each or zero)
2
Identified all required below ground drainage pipes and fittings as per the working drawing
(Award 1 mark each for correct identification of pipes, couplings, bends, tees)
4
Measured and marked pipe lengths accurately according to the drawing
(Award 1 mark each for correct measuring, marking, and cutting preparation)
3
Assembled pipes with correct fittings including couplings, bends, tees, and adapters
(Award 1 mark each for proper fitting of couplings, bends, tees, adapters, and inspection tee)
5
Applied solvent cement correctly to joints ensuring firm connections
(Award 1 mark each for correct application on 3 different joints)
3
Handled and stored tools and materials safely after completion
(Award 1 mark or zero)
1
Sub-Total18
PRODUCT CHECKLIST
Assembled pipe run total length 3000mm ± 20mm
(Award 3 marks or zero)
3
Correct use and positioning of fittings: couplings, bends (45° & 90°), tees, adapters, inspection tee, and pitcher tee
(Award 1 mark each for correct fitting x 5)
5
Joints firmly bonded with no visible gaps or misalignments
(Award 4 marks or zero)
4
Pipe run is straight and plumb where required
(Award 3 marks or zero)
3
Sub-Total15
GRAND TOTAL33
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Install Pipe Hangers and Supports for Below Ground Drainage Pipes

Plumbing · Level 5
Drainage System Installation I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Install pipe hangers and supports to secure 4 meters of 110mm diameter below ground drainage pipe.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
HammerPipe hangers
Spirit levelPipe clamps
Tape measureWall brackets
ScrewdriverClips
WrenchGalvanized nails
Plumb bobBolts and nuts
Timber support blocks
PVC drainage pipe 110mm diameter
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Pipe hangers6 Pcs per Candidate
2Pipe clamps6 Pcs per Candidate
3Wall brackets4 Pcs per Candidate
4Clips8 Pcs per Candidate
5Galvanized nails30 Pcs per Candidate
6Bolts and nuts12 Sets per Candidate
7Timber support blocks2 Pcs per Candidate
8PVC drainage pipe 110mm diameter4 meters per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Donning of PPE including safety boots and helmet
(Award 1 mark for each PPE worn correctly or zero)
2
Sub-Total2
TASK 2: Tool and Material Assembly
Identification and assembly of all required tools and materials
(Award 1 mark for correct assembly or zero)
1
Sub-Total1
TASK 3: Marking and Setting Out
Marking pipe hanger and support positions based on working drawing
(Award 3 marks for accurate marking or zero)
3
Sub-Total3
TASK 4: Installation of Pipe Hangers and Supports
Fixing pipe hangers and clamps securely to timber supports and wall brackets
(Award 1 mark for each correctly installed hanger or clamp, max 6)
6
Ensuring correct spacing and alignment of supports
(Award 3 marks for correct spacing and alignment or zero)
3
Sub-Total9
TASK 5: Installation of PVC Drainage Pipe
Laying and securing PVC pipe onto installed hangers and supports
(Award 4 marks for secure and level pipe installation or zero)
4
Checking and adjusting pipe plumbness and level
(Award 3 marks for correct plumbness and level or zero)
3
Sub-Total7
TASK 6: Final Checks and Housekeeping
Tightening all bolts and screws to ensure no movement
(Award 2 marks for all fasteners tightened or zero)
2
Cleaning and storing tools and leftover materials as per workplace guidelines
(Award 2 marks for proper storage and housekeeping or zero)
2
Sub-Total4
PRODUCT CHECKLIST
Pipe hangers and supports installed at correct spacing of 600mm c/c
(Award 4 marks for correct spacing or zero)
4
Pipe securely fixed with no sagging or movement
(Award 4 marks for secure pipe fixing or zero)
4
Pipe installed plumb and level as per drawing
(Award 4 marks for correct plumbness and level or zero)
4
Timber supports fixed with dimensions 750mm length x 150mm width x 1000mm height
(Award 4 marks for correct timber support dimensions or zero)
4
Sub-Total16
GRAND TOTAL42
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Prepare drainage trenches for pipe installationPractical 3
🔒Set out and install below ground drainage pipework with correct alignment and slopePractical 4
🔒Cut and Assemble Below Ground Drainage Pipes and FittingsPractical 5
🔒Install Below Ground Drainage Fixtures Including Traps, Vent Pipes, and Downspout OutletsPractical 6
🔒Construct drainage access points including manholes, septic tanks, and catch basinsPractical 7
🔒Install sump pumps and fit drainage grates and frames as per working drawingPractical 8
🔒Perform functionality tests on below ground drainage systemPractical 9
🔒Use plumbing and drainage tools correctly during below ground drainage installationPractical 10
🔒Set Out Below Ground Drainage Lines Using Levels and Measuring ToolsPractical 11
🔒Assemble and fix below ground drainage pipes with supportsPractical 12
🔒Apply Workshop SOPs and Safety Regulations during Below Ground Drainage InstallationPractical 13
🔒Housekeeping, Care and Maintenance of Drainage Tools and MaterialsPractical 14
🔒Install Cleanout Fittings and Traps for Below Ground DrainagePractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Apply safety measures correctly to protect yourself and others while working.
  • Prepare below ground drainage materials accurately by reading and following the working drawing.
  • Assemble the drainage tools and equipment needed for the job correctly and efficiently.
  • Prepare drainage trenches safely and accurately according to the work requirements.
  • Install drainage pipework accurately following the drainage system layout.
  • Construct drainage access points correctly and safely by following the proper work procedures.
  • Perform a functionality test safely and correctly to ensure the drainage system works well.
  • Conduct proper housekeeping to keep your work area clean and safe throughout the job.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.