By the end of this chapter, you will be able to:
Mastering these skills helps you build strong, reliable drainage systems that keep communities safe and healthy!
Compiled by: Joseph Njoroge
Installing below ground drainage systems is a critical aspect of plumbing that ensures effective wastewater and stormwater management in buildings and infrastructure. In Kenya, proper installation safeguards public health by preventing contamination and flooding, especially in urban areas like Nairobi and Mombasa where drainage challenges are frequent. This chapter focuses on the essential practices and safety measures that plumbing professionals must follow when working below ground. Personal protective equipment (PPE) forms the foundation for safety during such installations, protecting workers from physical, chemical, and biological hazards on site.
The hardhat or helmet is a vital piece of PPE designed to protect the plumber’s head from impact injuries, falling objects, and electrical hazards encountered on site. It is mandatory on all construction and installation sites, including drainage works in hospitals and schools, where overhead risks are common.
Hardhats are engineered to absorb and deflect blows from falling debris, tools, or materials that may drop during excavation or pipe laying operations. This protection is crucial in confined trenches where space is limited and workers are vulnerable to overhead hazards.
Some drainage sites expose plumbers to live wiring or underground cables. Hardhats made from non-conductive materials provide insulation against electrical shocks, which is essential when working near power lines or electrical installations, such as at county government offices.
Modern hardhats include adjustable suspension systems to fit various head sizes securely, ventilation slots to reduce heat buildup, and sweatbands for comfort during long shifts. Kenyan plumbers working in hot climates benefit from these features, as they reduce fatigue and improve focus.
Hardhats used in plumbing must meet standards set by the Kenya Bureau of Standards (KEBS), ensuring durability and reliability. Employers at institutions like Nairobi Hospital enforce strict PPE policies requiring certified helmets to minimize liability and protect their workforce.
Safety gloves shield the hands from cuts, abrasions, chemical exposure, and infections that plumbers face when handling pipes, solvents, and contaminated soil during drainage installation.
Different gloves suit varied tasks: heavy-duty leather gloves protect against mechanical injuries during pipe cutting, while nitrile or latex gloves guard against chemical irritants and biological contaminants common in sewage handling.
Plumbers often come into contact with wastewater containing pathogens and harsh cleaning agents. Gloves made from materials resistant to these hazards prevent skin infections and allergic reactions, which are prevalent in settings like retail food outlets and hotels where drainage systems must meet hygiene standards.
Effective gloves balance protection with flexibility, allowing plumbers to manipulate small fittings and tools with precision. Gloves with textured palms improve grip on slippery pipes, reducing accidents on muddy or wet sites such as farms or cooperative processing plants.
Gloves should be inspected regularly for tears, holes, or degradation. Frequent replacement is necessary to maintain protective integrity, especially when gloves are exposed to harsh substances or wear from repetitive tasks.
Dustcoats or overalls provide full-body protection against dirt, chemical splashes, and physical abrasions encountered during below ground drainage system installation.
Overalls prevent contaminants from contacting the wearer’s skin or personal clothing, reducing the risk of skin infections and cross-contamination. This is particularly important in healthcare facilities like Kenyatta National Hospital, where sanitation is critical.
Thick, durable fabric overalls shield plumbers from cuts and bruises caused by rough surfaces, sharp tools, and pipe edges encountered during excavation and fitting.
High-visibility overalls with reflective strips improve safety in low-light conditions or busy sites, such as county government roadworks, by making workers easily identifiable to vehicle operators and machinery drivers.
Ergonomically designed overalls made from breathable materials allow ease of movement and reduce heat stress in Kenya’s hot climate, enabling plumbers to work efficiently over extended periods.
Safety footwear is essential for protecting feet from crushing injuries, punctures, chemical spills, and slips on uneven or wet surfaces prevalent in drainage installation sites.
| Name | Specification | Use |
|---|---|---|
| Safety Boots | Steel toe cap, puncture-resistant sole, slip-resistant tread | Protect feet from heavy falling objects, sharp debris, and slippery ground |
Steel toe caps in safety boots prevent fractures from heavy pipes or machinery parts accidentally dropped during installation. This is critical in warehouse settings supplying plumbing materials.
Soles reinforced with metal plates protect against nails, glass shards, or metal scraps that may be present in excavation trenches, a common hazard in urban building sites.
Drainage installation involves working in wet, muddy conditions. Boots with slip-resistant soles reduce the risk of falls, especially on sloped surfaces found in hotels or retail parks.
Quality safety boots made from waterproof leather and cushioned interiors withstand harsh site conditions while providing comfort for long working hours, as seen in agricultural irrigation projects.
Eye and respiratory protection is crucial during below ground drainage installation to guard against dust, chemical splashes, and harmful fumes generated by solvents or disturbed contaminated soil.
Safety goggles prevent particles dislodged during excavation or pipe cutting from entering the eyes, reducing the risk of irritation or injury. This protection is vital in educational institutions where dust control is regulated.
Goggles with tight seals protect against splashes from acids, detergents, or sewage encountered when cleaning or repairing drainage pipes, common in hotel kitchens or hospital wards.
Face masks filter airborne particles and harmful gases such as methane or hydrogen sulfide that may accumulate in confined drainage trenches, safeguarding the plumber’s lungs.
Plumbers must choose appropriate goggles and masks based on site hazards, vented goggles for dusty environments and full-face respirators for high-risk chemical exposure, as practiced in pharmaceutical manufacturing plants.
Standard operating procedures (SOPs), rules, and regulations govern safe practices in plumbing workshops and on-site installations to minimize accidents and ensure legal compliance.
SOPs provide step-by-step instructions on handling tools, equipment, and hazardous materials safely, reducing errors and injuries. County government workshops enforcing SOPs have recorded significant reductions in workplace accidents.
Adhering to OSHA standards and KEBS guidelines ensures that plumbing activities meet national safety requirements, protecting workers and employers from legal penalties.
Regular safety training sessions keep plumbing professionals updated on new regulations and best practices, fostering a safety culture in companies such as Equity Bank’s facility management teams.
Clear rules for reporting accidents and responding to emergencies ensure timely medical intervention and prevent escalation of hazards on sites like retail stores and cooperative societies.
Workers are expected to follow rules diligently while supervisors monitor compliance, creating a disciplined environment that minimizes risks during drainage system installation.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covered the essential aspects of installing a below ground drainage system, beginning with the importance of personal protective equipment such as helmets, gloves, dustcoats, safety boots, goggles, and adherence to workshop safety procedures. It then examined the various types of drainage materials and accessories including waste pipes, fittings such as bends, tees, couplings, and supports like hangers, brackets, clamps, and clips, as well as drainage fixtures. The chapter detailed the tools and equipment required for the installation process, from hacksaws and trowels to spirit levels, drilling machines, plumbing snakes, and sump pumps. Preparation of drainage trenches involved marking the drainage line, excavating the trench, preparing the trench bottom, and setting out the pipes correctly. The installation of the pipework focused on setting pipes, installing supports, cutting pipes to length, assembling fittings, fixing pipes in place, checking alignment and slope, sealing joints, and installing fixtures. Construction of drainage access points such as cleanouts, inspection chambers, septic tanks, biodigesters, access wells, and vent pipes was explained thoroughly. Finally, the chapter emphasized the importance of conducting functionality tests including visual inspections, water flow, pressure, air, backflow, sump pump, and fixture tests, alongside proper housekeeping through care, maintenance, and storage of materials and equipment.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape | PVC Waste Pipe 110mm diameter |
| Marker Pen | PVC Couplings 110mm |
| Gloves | PVC Bends 110mm 45 degrees |
| Safety Boots | PVC Bends 110mm 90 degrees |
| Safety Helmet | PVC Tees 110mm |
| PVC Inspection Tee 110mm | |
| PVC Cross Tee 110mm | |
| PVC Adapters 110mm to 50mm | |
| Pitcher Tee 110mm | |
| PVC Solvent Cement |
| S/N | Item | Quantity |
|---|---|---|
| 1 | PVC Waste Pipe 110mm diameter | 5 meters per Candidate |
| 2 | PVC Couplings 110mm | 4 Pcs per Candidate |
| 3 | PVC Bends 110mm 45 degrees | 2 Pcs per Candidate |
| 4 | PVC Bends 110mm 90 degrees | 2 Pcs per Candidate |
| 5 | PVC Tees 110mm | 2 Pcs per Candidate |
| 6 | PVC Inspection Tee 110mm | 1 Pc per Candidate |
| 7 | PVC Cross Tee 110mm | 1 Pc per Candidate |
| 8 | PVC Adapters 110mm to 50mm | 2 Pcs per Candidate |
| 9 | Pitcher Tee 110mm | 1 Pc per Candidate |
| 10 | PVC Solvent Cement | 250 ml per Candidate |
| 11 | Measuring Tape | 1 Pc per Candidate |
| 12 | Marker Pen | 1 Pc per Candidate |
| 13 | Gloves | 1 Pair per Candidate |
| 14 | Safety Boots | 1 Pair per Candidate |
| 15 | Safety Helmet | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identify and Assemble Below Ground Drainage Materials and Fittings | |||
| Donned PPEs including safety boots and helmet (Award 1 mark each or zero) | 2 | ||
| Identified all required below ground drainage pipes and fittings as per the working drawing (Award 1 mark each for correct identification of pipes, couplings, bends, tees) | 4 | ||
| Measured and marked pipe lengths accurately according to the drawing (Award 1 mark each for correct measuring, marking, and cutting preparation) | 3 | ||
| Assembled pipes with correct fittings including couplings, bends, tees, and adapters (Award 1 mark each for proper fitting of couplings, bends, tees, adapters, and inspection tee) | 5 | ||
| Applied solvent cement correctly to joints ensuring firm connections (Award 1 mark each for correct application on 3 different joints) | 3 | ||
| Handled and stored tools and materials safely after completion (Award 1 mark or zero) | 1 | ||
| Sub-Total | 18 | ||
| PRODUCT CHECKLIST | |||
| Assembled pipe run total length 3000mm ± 20mm (Award 3 marks or zero) | 3 | ||
| Correct use and positioning of fittings: couplings, bends (45° & 90°), tees, adapters, inspection tee, and pitcher tee (Award 1 mark each for correct fitting x 5) | 5 | ||
| Joints firmly bonded with no visible gaps or misalignments (Award 4 marks or zero) | 4 | ||
| Pipe run is straight and plumb where required (Award 3 marks or zero) | 3 | ||
| Sub-Total | 15 | ||
| GRAND TOTAL | 33 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Hammer | Pipe hangers |
| Spirit level | Pipe clamps |
| Tape measure | Wall brackets |
| Screwdriver | Clips |
| Wrench | Galvanized nails |
| Plumb bob | Bolts and nuts |
| Timber support blocks | |
| PVC drainage pipe 110mm diameter |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Pipe hangers | 6 Pcs per Candidate |
| 2 | Pipe clamps | 6 Pcs per Candidate |
| 3 | Wall brackets | 4 Pcs per Candidate |
| 4 | Clips | 8 Pcs per Candidate |
| 5 | Galvanized nails | 30 Pcs per Candidate |
| 6 | Bolts and nuts | 12 Sets per Candidate |
| 7 | Timber support blocks | 2 Pcs per Candidate |
| 8 | PVC drainage pipe 110mm diameter | 4 meters per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and PPE | |||
| Donning of PPE including safety boots and helmet (Award 1 mark for each PPE worn correctly or zero) | 2 | ||
| Sub-Total | 2 | ||
| TASK 2: Tool and Material Assembly | |||
| Identification and assembly of all required tools and materials (Award 1 mark for correct assembly or zero) | 1 | ||
| Sub-Total | 1 | ||
| TASK 3: Marking and Setting Out | |||
| Marking pipe hanger and support positions based on working drawing (Award 3 marks for accurate marking or zero) | 3 | ||
| Sub-Total | 3 | ||
| TASK 4: Installation of Pipe Hangers and Supports | |||
| Fixing pipe hangers and clamps securely to timber supports and wall brackets (Award 1 mark for each correctly installed hanger or clamp, max 6) | 6 | ||
| Ensuring correct spacing and alignment of supports (Award 3 marks for correct spacing and alignment or zero) | 3 | ||
| Sub-Total | 9 | ||
| TASK 5: Installation of PVC Drainage Pipe | |||
| Laying and securing PVC pipe onto installed hangers and supports (Award 4 marks for secure and level pipe installation or zero) | 4 | ||
| Checking and adjusting pipe plumbness and level (Award 3 marks for correct plumbness and level or zero) | 3 | ||
| Sub-Total | 7 | ||
| TASK 6: Final Checks and Housekeeping | |||
| Tightening all bolts and screws to ensure no movement (Award 2 marks for all fasteners tightened or zero) | 2 | ||
| Cleaning and storing tools and leftover materials as per workplace guidelines (Award 2 marks for proper storage and housekeeping or zero) | 2 | ||
| Sub-Total | 4 | ||
| PRODUCT CHECKLIST | |||
| Pipe hangers and supports installed at correct spacing of 600mm c/c (Award 4 marks for correct spacing or zero) | 4 | ||
| Pipe securely fixed with no sagging or movement (Award 4 marks for secure pipe fixing or zero) | 4 | ||
| Pipe installed plumb and level as per drawing (Award 4 marks for correct plumbness and level or zero) | 4 | ||
| Timber supports fixed with dimensions 750mm length x 150mm width x 1000mm height (Award 4 marks for correct timber support dimensions or zero) | 4 | ||
| Sub-Total | 16 | ||
| GRAND TOTAL | 42 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.