Civil Engineering  ·  Level 6
Civil Engineering Works II
Chapter 2: Carry out civil external works
📚 6 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Safely construct timbering structures using the correct procedures.
  • Correctly dismantle timbering without causing damage or safety risks.
  • Follow step-by-step guidelines to ensure timbering is stable and secure.
  • Identify and use the right tools and materials for timbering tasks.
  • Maintain a safe working environment while handling timbering work.

Mastering these skills ensures you can protect yourself and others on site while building strong, reliable structures essential in civil engineering projects.

Compiled by: Michael Githaiga

Civil external works form a critical part of civil engineering projects, transforming design drawings into functional and durable outdoor surfaces. These works involve meticulous planning, material selection, and execution to ensure pavements withstand traffic loads, weather conditions, and usage demands. In Kenya, where infrastructure development is rapidly expanding across urban and rural areas, proficiency in laying external paving according to civil engineering drawings is essential for professionals to deliver quality and longevity in projects such as county government offices, schools, and commercial complexes.

2.1 Laying External Paving (based on the civil engineering drawings)

2.1.1 Types of Paving Materials

Paving materials are selected based on structural requirements, aesthetics, durability, and cost considerations. Understanding the properties and appropriate applications of each type is vital for Kenyan civil engineers tasked with external works, especially in environments ranging from high-traffic public spaces to rural pathways.

Concrete Paving

Concrete paving is widely used due to its strength, durability, and versatility. It consists of cement, aggregates, water, and admixtures, forming a rigid surface capable of supporting heavy loads. In Nairobi's county government offices, concrete pavements are preferred for parking areas and walkways because they resist deformation and require low maintenance.

Asphalt Paving

Asphalt, a flexible paving material made from bitumen and aggregates, offers smooth finishes and rapid construction. It is commonly applied in roadways and driveways where resilience to traffic-induced stresses and ease of repair are priorities. For instance, in commercial retail complexes in Mombasa, asphalt pavements provide cost-effective surfaces that withstand heavy vehicle movement and climatic variations.

Stone Paving

Stone paving involves natural or manufactured stones arranged in patterns, valued for aesthetics and durability. It is common in pedestrian zones, parks, and heritage sites where visual appeal is important. At university campuses such as Kenyatta University, stone paving enhances landscape features while providing robust walking surfaces resistant to erosion.

Brick and Block Paving (Additional material)

Though not in the initial list, brick and block paving is prevalent in Kenya for footpaths and residential areas due to its modular nature and ease of replacement. These materials offer decorative options and good load distribution, suitable for light to moderate traffic zones.

Composite and Permeable Paving

Modern civil engineering increasingly incorporates composite materials and permeable pavements to address environmental concerns like stormwater management. These pavements allow water infiltration, reducing runoff and improving sustainability, an approach adopted in Nairobi's green building projects.

2.1.2 Base Preparation and Leveling for Paving

Proper base preparation is fundamental to the structural integrity and longevity of paved surfaces. It ensures load distribution, prevents settlement, and provides a stable platform for the paving materials. Kenyan civil engineers must adapt base preparation techniques to local soil conditions and project specifications found in county infrastructure and commercial developments.

Site Clearing and Excavation

The initial step involves removing vegetation, debris, and unsuitable soil layers to reach a firm subgrade. Excavation must follow the design levels indicated in the civil drawings, ensuring uniform depth and slope. For example, at a retail business complex in Kisumu, careful excavation prevented future water pooling and pavement damage.

Subgrade Compaction

Compaction of the exposed subgrade soil increases its density and bearing capacity, reducing the risk of settlement. Mechanical rollers or plate compactors are used until the required compaction level, often measured by the Proctor test, is achieved. This step is critical in areas with expansive clay soils common in parts of Nakuru.

Laying and Compacting the Sub-base

A sub-base layer of granular material such as crushed stone or gravel is laid over the compacted subgrade. This layer distributes loads and provides drainage to prevent water accumulation beneath the pavement. The sub-base thickness and material quality are specified in the drawings, for instance, a 150mm thick crushed stone layer for pedestrian paths in Nairobi hospitals.

Base Layer Installation and Leveling

Above the sub-base, a base layer, often of higher quality material like crushed aggregates or stabilized soil, is placed. This layer is meticulously leveled and compacted to create a smooth, even surface that matches the design grades. Laser leveling equipment may be employed for precision in large projects like university campuses.

Surface Drainage Provision

Incorporating appropriate slopes and drainage channels during base preparation prevents water stagnation on and beneath the pavement. Typical slopes range from 1% to 2% to facilitate runoff towards drains. County government offices in Eldoret frequently apply these standards to avoid pavement deterioration.

2.1.3 Laying and Jointing Techniques for Various Materials

The execution phase of paving requires adherence to specific laying and jointing methods that vary by material type to ensure durability and performance. Kenyan civil engineers must be skilled in these techniques to meet the high standards expected in public infrastructure and commercial developments.

Concrete Paving Laying Techniques

Concrete paving is generally laid by casting in situ using formwork or precast units. For in situ paving, concrete is poured into prepared molds, consolidated with vibrators to eliminate voids, and finished with trowels or broom surfaces for texture. Precast concrete slabs require precise alignment and bedding on a mortar or sand layer.

Jointing in Concrete Paving

Joints control cracking caused by shrinkage and temperature changes. Types include contraction joints, expansion joints, and construction joints. Proper spacing, typically 3 to 5 meters apart, and filling with joint sealants like bituminous materials prevent water infiltration and debris accumulation, critical in Nairobi hospital walkways.

Asphalt Paving Laying Techniques

Asphalt is laid using specialized pavers that spread and partially compact the hot mix. The material temperature must be maintained to ensure proper compaction and bonding. Rolling follows immediately to achieve the required density and smoothness. In Kenyan urban roads, temperature control is vital to prevent premature cracking.

Jointing in Asphalt Paving

Longitudinal and transverse joints are formed during paving operations. Tack coats (bitumen emulsions) are applied to joint surfaces before laying new asphalt to ensure bonding. Overlapping and proper compaction of joints minimize reflective cracking and water ingress, a practice applied in county road projects.

Stone Paving Laying Techniques

Stone paving is laid manually, with stones set on a sand or mortar bed. The pattern, such as herringbone or stretcher bond, affects strength and aesthetics. Leveling is achieved by adjusting bedding thickness and tapping stones into position. Jointing with sand or mortar stabilizes the stones and prevents weed growth, commonly seen in hotel landscaping projects.

Jointing in Stone Paving

Joints between stones can be dry (filled with sand) or mortar-filled. Mortar joints provide rigidity and prevent movement, while sand joints allow slight flexibility and drainage. The choice depends on traffic load and environmental exposure, as practiced in university pedestrian zones.

2.1.4 Sealing and Finishing Paving Surface

Sealing and finishing enhance the durability, appearance, and functionality of paved surfaces. These processes protect against weathering, chemical attack, and wear, extending the pavement's service life. Kenyan civil engineering projects in commercial and public sectors benefit from tailored sealing and finishing approaches.

Surface Sealing for Concrete Paving

Concrete sealers penetrate or coat the surface to reduce water absorption, dusting, and staining. Types include acrylic, epoxy, and silane-based sealers. Applied by spraying or rolling, sealers also improve surface aesthetics. For example, county office walkways in Kisii use silane sealers for their water repellency and breathability.

Asphalt Surface Treatments

Asphalt pavements receive surface treatments such as seal coats or slurry seals to rejuvenate aging surfaces and fill minor voids. These treatments restore skid resistance and waterproofing. Nairobi's retail parking lots often undergo seal coating every 3 to 5 years to maintain pavement integrity.

Finishing Techniques for Stone Paving

Finishing stone pavements involves cleaning, joint filling, and sometimes applying protective coatings. Anti-slip treatments may be added for safety in wet conditions. Stone surfaces at coastal hotels in Diani are finished with penetrating sealers to resist saltwater corrosion.

Edge and Surface Detailing

Proper finishing includes trimming edges, ensuring smooth transitions to adjacent surfaces, and installing edge restraints to prevent material displacement. These details contribute to the pavement's structural stability and visual appeal. In schools around Eldoret, meticulous edge finishing supports long-term maintenance.

Practice Questions

  1. Explain the key differences between concrete and asphalt paving materials in terms of composition and typical applications. (10 marks)
  2. Describe the steps involved in preparing the base layer for external paving and explain why each step is important. (12 marks)
  3. Discuss the jointing techniques used in concrete paving and their significance. (8 marks)
  4. Outline the sealing and finishing methods for asphalt pavements and their benefits in maintaining pavement quality. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Performing Soft Landscaping

Soft landscaping forms a critical part of civil engineering external works, especially in urban and peri-urban developments in Kenya. It involves the integration of living plant materials with the built environment to enhance aesthetics, control erosion, impro…

🔒2.3 Construction of Drainage System

Drainage systems are fundamental in civil engineering projects in Kenya to manage surface and subsurface water effectively. Proper drainage prevents waterlogging, soil erosion, and structural damage to roads, buildings, and agricultural land. Civil engineers m…

🔒2.4 Construction of Fences and Gates

In civil engineering projects across Kenya, the construction of fences and gates is a critical aspect of site security, boundary definition, and aesthetic enhancement. Whether for a county government office, a university campus, or a commercial property, prope…

🔒2.5 Environmental Rehabilitation

Environmental rehabilitation is a critical aspect of civil engineering projects in Kenya, especially where construction activities disrupt the natural landscape. Restoration efforts ensure that ecosystems damaged by soil erosion, excavation, or infrastructure…

🔒2.6 Waste Management

Waste management is a critical aspect of civil external works in Kenya due to the environmental and health risks posed by construction waste. Effective management not only ensures compliance with environmental regulations but also promotes sustainability by re…

Chapter Summary

This chapter covered the essential steps involved in carrying out civil external works, starting with the laying of external paving according to civil engineering drawings. It detailed the various types of paving materials such as concrete, asphalt, and stone, along with the necessary base preparation, leveling, and jointing techniques, finishing with sealing and surface treatment. The discussion then moved to soft landscaping, focusing on the selection of appropriate plants, soil preparation, drainage, irrigation systems, and ongoing maintenance. Construction of drainage systems was explored through the types of drainage, slope calculations, installation of pipes and channels, and regular inspection for functionality. The chapter also examined the construction of fences and gates, highlighting different fencing materials, the process of erecting posts and panels, gate installation, and compliance inspections. Environmental rehabilitation was addressed with attention to soil erosion types, prevention methods, habitat restoration, replanting, and monitoring rehabilitated areas. Finally, waste management practices were outlined, including waste types and sources, segregation, disposal, recycling on-site, safe handling of hazardous materials, and adherence to local regulations.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which of the following is NOT a common paving material used in civil external works? (2 marks)
    a) Concrete
    b) Asphalt
    c) Timber
    d) Stone

  2. Explain the importance of base preparation and leveling before laying paving materials. (3 marks)

🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Identify three common types of paving materials used in civil engineering external works and explain one key advantage of each in the Kenyan context. (4 marks)
  2. Describe the importance of base preparation and leveling before laying external paving and mention two consequences of poor base preparation. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Laying external concrete paving blocks as per drawing

Civil Engineering · Level 6
Civil Engineering Works II
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare base and lay external concrete paving blocks 3500mm x 1500mm area.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measureConcrete paving blocks 200mm x 100mm x 60mm
Spirit levelSharp sand
TrowelCrushed stone (20mm size)
Rubber malletWater
Wooden floatSealing compound for joints
Wheelbarrow
Broom
Builders line and pegs
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Concrete paving blocks 200mm x 100mm x 60mm100 Pcs per Candidate
2Sharp sand2 Wheelbarrows per Candidate
3Crushed stone (20mm size)2 Wheelbarrows per Candidate
4Water15 Litres per Candidate
5Sealing compound for joints1 Litre per 4 Candidates
6Wheelbarrow1 per 5 Candidates
7Tape measure1 per Candidate
8Spirit level1 per Candidate
9Trowel1 per Candidate
10Rubber mallet1 per Candidate
11Wooden float1 per Candidate
12Broom1 per Candidate
13PPE (overall, safety boots, helmet)1 set per Candidate
14Builders line and pegs1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Site preparation and base laying
Candidate wore PPE (overall, safety boots, helmet)
(Award 3 marks or zero)
3
Cleared and leveled the site removing topsoil and debris
(Award 4 marks or zero)
4
Set out paving area of 3500mm length x 1500mm width using builders line and pegs with +5mm tolerance
(Award 5 marks or zero)
5
Laid and compacted crushed stone base to 150mm thickness
(Award 6 marks or zero)
6
Laid 50mm thick sharp sand bedding and leveled using wooden float
(Award 5 marks or zero)
5
Sub-Total23
TASK 2: Laying, jointing and finishing concrete paving blocks
Laid concrete paving blocks as per drawing pattern with uniform joint spacing 5-10mm
(Award 6 marks or zero)
6
Used rubber mallet to bed blocks ensuring level surface and alignment
(Award 4 marks or zero)
4
Checked and corrected levelness and alignment with spirit level and tape measure
(Award 5 marks or zero)
5
Applied sealing compound to joints after cleaning surface
(Award 4 marks or zero)
4
Cleaned finished surface with broom ensuring no debris remains
(Award 3 marks or zero)
3
Sub-Total22
PRODUCT CHECKLIST
Finished paved area dimensions 3500mm length x 1500mm width within +5mm tolerance
(Award 4 marks or zero)
4
Uniform joint spacing of 5-10mm maintained throughout
(Award 3 marks or zero)
3
Surface levelness within 3mm tolerance checked by spirit level
(Award 4 marks or zero)
4
Paving blocks properly bedded with no rocking or loose blocks
(Award 4 marks or zero)
4
Sealing compound applied neatly and joints sealed fully
(Award 3 marks or zero)
3
Sub-Total18
GRAND TOTAL63
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Laying External Asphalt Paving 3000mm x 1500mm

Civil Engineering · Level 6
Civil Engineering Works II
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare sub-base and lay external asphalt paving 3000mm length x 1500mm width x 50mm thickness.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Slasher / pangaCrushed stone
JembeSand
Spade / ShovelAsphalt material
Tape measureSealing compound
Spirit levelWater
Wheelbarrow
Trowel
Rake
Compactor
Pegs
Building line
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Slasher / panga1 Pc per 3 Candidates
2Jembe1 Pc per Candidate
3Spade / Shovel1 Pc per Candidate
4Tape measure1 Pc per Candidate
5Spirit level1 Pc per Candidate
6Wheelbarrow1 Pc per 5 Candidates
7Asphalt paver or hand tools for asphalt laying1 Pc per 5 Candidates
8Trowel1 Pc per Candidate
9Rake1 Pc per Candidate
10Compactor (manual or mechanical)1 Pc per 5 Candidates
11Pegs10 Pcs per Candidate
12Building line1 Pc per Candidate
13Asphalt material (hot mix)0.5 m3 per Candidate
14Crushed stone (sub-base)0.6 m3 per Candidate
15Sand (bedding layer)0.2 m3 per Candidate
16Sealing compound1 liter per Candidate
17Water20 liters per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Safety and Site Preparation
Wore PPE (overall, safety boots, helmet)
(Award 3 marks or zero)
3
Cleared the site and removed topsoil
(Award 3 marks or zero)
3
Set out the paving area to 3000mm x 1500mm using pegs and building line
(Award 4 marks or zero)
4
Sub-Total10
TASK 2: Sub-base Preparation
Excavated to required depth for sub-base (minimum 150mm)
(Award 3 marks or zero)
3
Laid and compacted crushed stone sub-base to 150mm thickness
(Award 5 marks or zero)
5
Laid and leveled sand bedding layer to 50mm thickness
(Award 3 marks or zero)
3
Sub-Total11
TASK 3: Asphalt Laying and Finishing
Laid asphalt material to specified thickness of 50mm
(Award 5 marks or zero)
5
Compacted asphalt properly using compactor
(Award 4 marks or zero)
4
Finished surface levelness and smoothness checked
(Award 3 marks or zero)
3
Applied sealing compound correctly on joints and edges
(Award 4 marks or zero)
4
Sub-Total16
PRODUCT CHECKLIST
Paving dimensions: length 3000mm ±10mm
(Award 3 marks or zero)
3
Paving dimensions: width 1500mm ±10mm
(Award 3 marks or zero)
3
Paving thickness 50mm ±5mm
(Award 4 marks or zero)
4
Surface levelness within ±5mm using spirit level
(Award 4 marks or zero)
4
Edges and joints sealed uniformly and neatly
(Award 3 marks or zero)
3
Compaction achieved with no visible deformation or loose areas
(Award 3 marks or zero)
3
Sub-Total20
GRAND TOTAL57
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Laying External Stone Paving 3000mm x 1500mmPractical 3
🔒Soft landscaping soil preparation and planting a 3m x 2m garden bedPractical 4
🔒Installation and Testing of Irrigation System for a Landscaped PlotPractical 5
🔒Maintenance of Soft Landscaping Features in a Public ParkPractical 6
🔒Construct surface drainage system with pipes and catch basinsPractical 7
🔒Constructing a Subsurface Drainage System with PVC PipesPractical 8
🔒Inspect and Maintain External Drainage System ComponentsPractical 9
🔒Erect a masonry fence with posts and panelsPractical 10
🔒Erect a wooden fence 1800mm high x 3000mm long with posts and panelsPractical 11
🔒Installation of a Timber Security Gate 1200mm x 1800mmPractical 12
🔒Inspection of Fence Installation for Compliance with StandardsPractical 13
🔒Implement soil erosion control measures and restore natural habitat featuresPractical 14
🔒Replanting and monitoring rehabilitated vegetation areaPractical 15
🔒Segregate and Dispose Construction Waste as per RegulationsPractical 16
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Safely construct timbering structures using the correct procedures.
  • Correctly dismantle timbering without causing damage or safety risks.
  • Follow step-by-step guidelines to ensure timbering is stable and secure.
  • Identify and use the right tools and materials for timbering tasks.
  • Maintain a safe working environment while handling timbering work.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.