The application of superstructure works taking off principles is a fundamental skill for architecture professionals in Kenya. Accurate measurement and documentation of superstructure elements ensure that construction proceeds efficiently and within budget, while complying with design specifications and local building codes. This chapter explores the key superstructure components that architects must quantify, covering walling units, doors, windows, roof works, fittings and fixtures, and finishes. Mastery of these principles supports precise bill of quantities preparation, contributing to successful project delivery in diverse settings such as county government offices, hospitals, and educational institutions.
2.1 Superstructure Elements Documentation
Documentation of superstructure elements involves detailed measurement and description of all visible and structural components above the foundation level. For architects, precise quantification of these elements is crucial for cost estimation, material procurement, and quality control. In Kenyan practice, superstructure documentation must align with the National Construction Authority (NCA) guidelines and integrate seamlessly with the architectural design intent to facilitate effective coordination with contractors and quantity surveyors.
2.1.1 Walling Units
Walling units form the primary vertical enclosure of a building’s superstructure, providing shelter, privacy, and structural support. Measuring walling units accurately is essential for budgeting and resource planning in construction projects such as university lecture halls or county government offices. This subtopic breaks down the types of walling units, measurement methods, and documentation requirements.
Types of Walling Units
- Concrete Blocks: Widely used in Kenya for their durability and cost-effectiveness, concrete blocks come in various sizes and strengths. Their modularity simplifies measurement by counting units or calculating volume.
- Brick Masonry: Common in institutional buildings, brick walls require consideration of mortar joints in measurements to avoid overestimation of material quantities.
- Stone Masonry: Employed in heritage buildings and some high-end residences, stone walls need precise area and thickness measurements due to irregular shapes.
- Timber Walls: Used in temporary or lightweight structures, timber walls require linear measurements and assessment of panel sizes.
- Drywall Partitions: Increasingly popular in commercial buildings like banks and offices, drywall units are measured by panel area and thickness.
Measurement Methods for Walling Units
- Linear Measurement: Applied for walls with uniform height and length, typically recorded in metres.
- Area Measurement: Wall surface area is calculated by multiplying length by height, subtracting openings such as doors and windows.
- Volume Measurement: Used when block or brick volume is necessary for ordering materials, calculated by wall thickness times area.
- Counting Units: For modular blocks or bricks, counting the number of units provides a direct measure to estimate materials.
- Allowance for Openings: Accurate deduction of doors, windows, and other penetrations prevents material overestimation.
Documentation Requirements
- Detailed wall dimensions including height, length, and thickness.
- Specification of wall types and materials used.
- Notation of wall finishes if integral to the walling unit.
- Clear indication of openings with sizes and locations.
- Reference to relevant construction drawings and standards.
Importance of Accurate Walling Documentation in Practice
Accurate walling documentation ensures that contractors working on projects such as county hospitals or retail shops procure the correct amount of masonry materials, reducing wastage and cost overruns. It also facilitates effective communication between architects, quantity surveyors, and suppliers, ensuring that the project timeline is maintained.
2.1.2 Doors
Doors are critical access points that influence building functionality, security, and aesthetics. Precise measurement and documentation of door units affect procurement and installation scheduling, especially in large-scale projects such as university campuses or hotel developments.
Types of Doors Commonly Used
- Solid Timber Doors: Favoured for durability and appearance in executive offices and high-end residential buildings.
- Metal Doors: Often installed in service areas and security-sensitive locations, offering strength and fire resistance.
- Glass Doors: Used in commercial buildings for aesthetic appeal and natural lighting.
- Flush Doors: Popular in institutional buildings due to their smooth surface and ease of finishing.
- Panel Doors: Traditional style doors found in heritage and residential architecture.
Measurement Procedures for Doors
- Door Leaf Size: Measure height and width of the door leaf excluding the frame.
- Frame Dimensions: Record width and thickness of door frames for accurate fitting.
- Thickness Measurement: Important for matching with hardware specifications and wall openings.
- Clear Opening Measurement: The net opening size is critical for accessibility compliance.
- Allowance for Door Hardware: Space for hinges, locks, and handles must be accounted for.
Documentation Elements for Doors
- Door type and material specification.
- Dimensions of door leaf and frame.
- Location within the building, referencing floor plans.
- Hardware details and installation notes.
- Fire rating or security features, if applicable.
Role of Door Documentation in Project Success
In a county government office, for example, correctly documented door specifications prevent delays caused by ordering incompatible doors or hardware. It also supports compliance with accessibility standards such as the Persons with Disabilities Act in Kenya.
2.1.3 Windows
Windows contribute to natural lighting, ventilation, and building aesthetics. Detailed measurement and documentation are necessary for ordering, fabrication, and installation, especially in commercial buildings like banks or hospitals where specifications can vary widely.
Common Window Types in Architectural Practice
- Casement Windows: Hinged on one side, common in residences and offices.
- Sliding Windows: Popular in schools and hospitals for ease of operation.
- Fixed Windows: Non-opening, often used for aesthetics or security.
- Louvered Windows: Provide ventilation in kitchens and utility areas.
- Bay and Bow Windows: Architectural features enhancing interior space and views.
Window Measurement Techniques
- Overall Opening Size: Height and width of the wall opening.
- Sash Size: Dimensions of movable parts for fabrication.
- Frame Thickness: Important for fitting and sealing.
- Glazing Area: Measurement of glass surface for energy efficiency calculations.
- Allowance for Trims and Finishes: Essential for correct installation and aesthetics.
Documentation Details for Windows
- Type and material of window frames (e.g., aluminium, timber, UPVC).
- Glazing specifications including thickness and type.
- Location and floor reference.
- Opening mechanism and hardware requirements.
- Compliance with safety and energy standards.
Practical Importance of Window Documentation
Accurate window documentation ensures that suppliers can fabricate units that fit precisely, reducing onsite modifications. For example, in a hospital, well-specified windows support infection control through proper ventilation and ease of cleaning.
2.1.4 Roof Work
Roof work encompasses structural and finishing elements that protect the building envelope. Measurement of roof components is complex due to sloping surfaces and varied materials, requiring architects to apply precise taking-off methods to avoid costly errors.
Types of Roof Structures
- Timber Truss Roofs: Common in residential and institutional buildings for their strength and adaptability.
- Steel Roof Frames: Used in commercial and industrial buildings for longer spans.
- Concrete Roof Slabs: Favoured for flat roofs in urban developments.
- Thatched Roofs: Traditional roofing still used in rural settings and lodges.
- Roof Coverings: Includes tiles, metal sheets, and waterproof membranes.
Measurement Approaches for Roof Elements
- Plan Area Measurement: Horizontal projection area used for initial material estimates.
- Surface Area Measurement: Accounts for slope and pitch, calculated using Pythagorean theorem for inclined planes.
- Linear Measurement: Used for ridge, eaves, and valley lengths.
- Component Count: Number of trusses, rafters, and purlins required.
- Allowance for Overlaps and Waste: Critical for ordering roofing sheets or tiles.
Documentation Requirements for Roof Works
- Roof type and structural system.
- Dimensions including span, pitch, and overhangs.
- Material specifications for frame and covering.
- Details of insulation and waterproofing layers.
- Reference to structural and architectural drawings.
Challenges in Roof Work Measurement
In a hotel construction project, inaccurate roof measurements can lead to ordering insufficient roofing materials, causing delays and increased costs. Capturing slope and pitch correctly is vital to ensure proper water drainage and structural integrity.
2.1.5 Fittings and Fixtures
Fittings and fixtures are essential for functionality and comfort within buildings. These elements require precise quantification and specification to ensure compatibility with architectural design and mechanical systems.
Categories of Fittings and Fixtures
- Sanitary Fittings: Toilets, basins, taps, and showers common in hospitals and public buildings.
- Electrical Fixtures: Light fittings, switches, and sockets in offices and schools.
- Kitchen Fixtures: Cabinets, countertops, and sinks in residential and commercial kitchens.
- Hardware Fittings: Door handles, locks, and hinges.
- Built-in Furniture: Wardrobes and shelving units integrated into the building design.
Measurement and Documentation Practices
- Quantification by Unit: Counting the number of individual fittings.
- Specification of Type and Model: Including manufacturer and performance standards.
- Location and Installation Details: Referencing architectural plans.
- Compatibility Notes: Ensuring fittings match plumbing and electrical systems.
- Maintenance Access Provisions: Documenting ease of access for repairs.
2.1.6 Finishes
Finishes provide the final aesthetic and protective layer to building surfaces. Accurate measurement and documentation of finishes are critical for budgeting and achieving the desired quality in projects such as university lecture halls or retail outlets.
Types of Finishes
- Plastering: Internal and external wall finishes that improve surface smoothness and durability.
- Painting: Decorative and protective coatings applied to walls, ceilings, and woodwork.
- Tiling: Ceramic, porcelain, or natural stone applied to floors and walls.
- Floor Finishes: Includes concrete polishing, vinyl, and timber flooring.
- Ceiling Finishes: Gypsum boards, acoustic tiles, and suspended ceilings.
Measurement Methods for Finishes
- Surface Area Calculation: Length multiplied by height or width for walls and ceilings.
- Coverage Rates: Considering manufacturer’s recommended coverage per litre or square metre.
- Allowance for Openings: Deductions for doors, windows, and built-in fixtures.
- Thickness Specification: Important for plaster and tiling to estimate material volume.
- Edge and Joint Details: Accounting for skirting, cornices, and trim.
Documentation Essentials for Finishes
- Type and grade of finish material.
- Surface preparation requirements.
- Application method and number of coats.
- Colour and texture specifications.
- Reference to relevant Kenyan standards such as KEBS.
Effect of Finishes Documentation on Project Outcomes
In retail business fit-outs, well-documented finishes contribute to brand image and customer experience. Accurate quantities prevent overspending on materials and support timely completion of decorative works.
Practice Questions
- Explain the importance of accurate measurement and documentation of walling units in the preparation of a bill of quantities for a county government office building. (10 marks)
- Describe the key measurements required when taking off doors for a university campus project and explain why each is important. (10 marks)
- Discuss the challenges involved in measuring roof work and how these challenges can be addressed during the taking off process. (10 marks)
- Identify five types of fittings and fixtures commonly found in hospital buildings and explain the significance of precise documentation for each. (10 marks)
- Outline the procedures for measuring finishes in a commercial building and explain how allowances for openings are incorporated. (10 marks)
The rest of this chapter
🔒Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free account 🔒2.2 Superstructure Elements Quantification
In architectural practice within Kenya, accurate quantification of superstructure elements is essential for cost estimation, procurement, and construction scheduling. Superstructure elements consist of the parts of a building above the foundation, and their me…
🔒2.3 Superstructure elements quantities booking
In architectural measurement, accurately booking quantities for superstructure elements is essential to ensure precise cost estimation, material procurement, and effective project management. In Kenya, where construction projects often face budget constraints…
Chapter Summary
This chapter provided a comprehensive overview of the principles involved in taking off superstructure works in building construction. It began by detailing the documentation required for various superstructure elements including walling units, doors, windows, roof work, fittings and fixtures, and finishes, emphasizing the importance of accurate and clear records. The process of quantifying these elements was then explained, highlighting how to measure walling units, doors, windows, roofing components, fittings, and finishes systematically to ensure precise estimations. Following quantification, the chapter covered the methods for booking the quantities of each superstructure element, ensuring the measurements are properly recorded for cost estimation and project planning. This systematic approach ensures that all components of the superstructure are accounted for accurately, facilitating effective resource allocation and budgeting. The integration of documentation, quantification, and booking forms the foundation for reliable measurement practices in building works. Mastery of these principles equips students with the skills to handle complex construction projects with confidence and precision.
Self-Assessment
🔒 PDFDownload this self-assessment, with answers
A. Written Assessment
- Identify three common walling units used in superstructure construction in Kenya and explain their typical applications. (6 marks)
- Which measurement unit is most appropriate when quantifying door openings in architectural drawings? (2 marks)
🔒20 more in this section.
Chapter Examination Questions
🔒 PDFDownload these examination questions, with worked answers
SECTION A (40 Marks) - Answer ALL Questions
- Explain the importance of accurate documentation of walling units in architectural superstructure works in the context of a residential building project in Nairobi. (4 marks)
- Identify and describe four key types of doors commonly used in Kenyan architectural superstructures. (4 marks)
🔒18 more in this section.
Chapter Practical Activities
Practical 1: Document superstructure elements for a residential building
Architecture · Level 6
Building Works Measurement Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Prepare a detailed Bill of Quantities document for the superstructure walls and lintels measuring 9000mm length, 300mm thickness, and 3500mm height.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Computer with Microsoft Excel software | Dimension sheets |
| Calculator | Abstract sheets |
| Printer | Billing sheets |
| Architectural plan |
| CESMM/SMM |
| Stationery |
| Binding materials |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Dimension sheets | 3 sheets per Candidate |
| 2 | Abstract sheets | 2 sheets per Candidate |
| 3 | Billing sheets | 2 sheets per Candidate |
| 4 | Architectural plan (scale 1:100) | 1 set per Candidate |
| 5 | CESMM/SMM standard measurement document | 1 copy per Candidate |
| 6 | Computer with Microsoft Excel software installed | 1 unit per Candidate |
| 7 | Calculator | 1 unit per Candidate |
| 8 | Stationery (pens, ruler, eraser) | 1 set per Candidate |
| 9 | Printer with printing paper | 1 unit per 5 Candidates |
| 10 | Binding materials | 1 set per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Preparation and organization of superstructure documentation |
Identified and gathered all relevant documents including Bill paper, CESMM/SMM, Abstract paper (Award 1 mark each or zero x 3 = 3 Marks) | 3 | | |
Observed occupational safety and health precautions in the computer lab: ventilation, lighting, sanitation (Award 1 mark each or zero x 3 = 3 Marks) | 3 | | |
Interpreted the architectural plan provided focusing on dimensions and walling elements (Award 2 marks each or zero x 2 = 4 Marks) | 4 | | |
Transferred the scaled dimensions into the dimension sheet accurately: 9000mm length, 300mm thickness, 3500mm height (Award 2 marks each or zero x 3 = 6 Marks) | 6 | | |
Transferred the calculations from the dimension sheet to abstract sheet correctly including length, area and volume (Award 2 marks each or zero x 3 = 6 Marks) | 6 | | |
Transferred the calculated items from the abstract sheet to billing sheet with correct units and descriptions (Award 2 marks each or zero x 2 = 4 Marks) | 4 | | |
Correctly set up Microsoft Excel software and keyed in data from the billing sheet (Award 1 mark for software setup, 4 marks for data entry) | 5 | | |
Used Microsoft Excel formulas (Auto sum, Average, Multiplication) to verify quantities (Award 2 marks each or zero x 3 = 6 Marks) | 6 | | |
Printed the Bill of Quantities document and prepared it for handover (Award 3 marks or zero) | 3 | | |
Switched off the computer and printer correctly (Award 2 marks or zero) | 2 | | |
| Sub-Total | 42 | | |
| PRODUCT CHECKLIST |
Bill of Quantities document contains item column, description column, unit column, rate column, amount column; measurements match architectural plan (9000mm length, 300mm thickness, 3500mm height) (Award 2 marks each or zero x 5 = 10 Marks) | 10 | | |
| Sub-Total | 10 | | |
| GRAND TOTAL | 52 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
Practical 2: Measure and Quantify Walling Units for a 9m x 3m Wall Section
Architecture · Level 6
Building Works Measurement Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Measure and quantify walling units for a 9000mm long, 3000mm high wall section as per the provided architectural plan.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Calculator | Architectural plan A3 size |
| Computer with Microsoft Excel software | Dimension sheet |
| Printer | Abstract sheet |
| Stationery | Billing sheet |
| CESMM/SMM bill paper |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Architectural plan A3 size | 1 sheet per Candidate |
| 2 | Dimension sheet | 2 sheets per Candidate |
| 3 | Abstract sheet | 1 sheet per Candidate |
| 4 | Billing sheet | 1 sheet per Candidate |
| 5 | Calculator | 1 per Candidate |
| 6 | Computer with Microsoft Excel software | 1 per Candidate |
| 7 | CESMM/SMM bill paper | 1 sheet per Candidate |
| 8 | Printer | 1 per 5 Candidates |
| 9 | Stationery (pens, rulers, erasers) | 1 set per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Document Identification and Safety |
Identified documents used to prepare BOQ: Bill paper, CESMM/SMM, Abstract Paper (Award 1 mark each) | 3 | | |
Observed occupational safety and health precautions in the computer lab: Ventilation, Lighting, Sanitation (Award 1 mark each) | 3 | | |
| Sub-Total | 6 | | |
| TASK 2: Interpretation and Dimension Transfer |
Interpreted the architectural plan: Dimensions and Walling units (Award 2 marks each) | 4 | | |
Transferred the scaled dimensions into the dimension sheet: Wall length 9000mm (Award 2 marks) | 2 | | |
Transferred the scaled dimensions into the dimension sheet: Wall height 3000mm (Award 2 marks) | 2 | | |
| Sub-Total | 8 | | |
| TASK 3: Abstracting and Billing |
Transferred calculations from dimension sheet to abstract sheet: Number and area of walling units (Award 2 marks each) | 4 | | |
Transferred calculations from abstract sheet to billing paper: Quantities and units (Award 2 marks each) | 4 | | |
| Sub-Total | 8 | | |
| TASK 4: Microsoft Excel Data Entry and Verification |
Launched Microsoft Excel software correctly (Award 2 marks) | 2 | | |
Keyed data from billing sheet into relevant Excel columns (Award 3 marks) | 3 | | |
Used Excel formulas to verify quantities: AutoSum, Average, Multiplication (Award 2 marks each) | 6 | | |
| Sub-Total | 11 | | |
| TASK 5: Finalization |
Printed the bill of quantities document and handed over (Award 2 marks) | 2 | | |
Switched off the computer correctly (Award 2 marks) | 2 | | |
| Sub-Total | 4 | | |
| PRODUCT CHECKLIST |
Finished bill of quantities includes Item column, Description column, Unit column, Rate column, Amount column (Award 4 marks) | 4 | | |
Wall length measured as 9000mm and height as 3000mm matching drawing (Award 2 marks) | 2 | | |
Quantities of walling units accurately calculated and recorded (Award 4 marks) | 4 | | |
Bill of quantities document is neat, legible and properly formatted (Award 2 marks) | 2 | | |
| Sub-Total | 12 | | |
| GRAND TOTAL | 49 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
🔒Measure and Quantify Timber Doors for SuperstructurePractical 3
🔒Measure and quantify window openings from working drawingsPractical 4
🔒Measure and Quantify Roof Components from Architectural PlansPractical 5
🔒Measure and Quantify Fittings and Fixtures from Superstructure DrawingsPractical 6
🔒Measure and quantify plastering and painting finishes for superstructure wallsPractical 7
🔒Booking Quantities for Walling Units of a 9m x 6m External WallPractical 8
🔒Book Quantities for Doors from Architectural Take-OffPractical 9
🔒Book Quantities for Windows in Superstructure WorksPractical 10
🔒Book quantities for a pitched timber roof structure 6000mm x 4500mmPractical 11
🔒Booking Quantities for Fittings and Fixtures in a Residential SuperstructurePractical 12
🔒Booking Finish Quantities for Plaster and Paint AreasPractical 13
🔒Identification and Classification of Superstructure ElementsPractical 14
🔒Measurement and Booking of Walling Units for a Superstructure WallPractical 15