By the end of this chapter, you will be able to:
Mastering these skills will help you confidently manage construction measurements, ensuring projects run smoothly and meet quality standards.
The measurement of external works is a critical aspect of architectural quantity surveying and project management in Kenya. External works include all construction activities outside the main building structure, which significantly affect the overall project cost and quality. Accurate documentation and measurement of these elements ensure proper budgeting, scheduling, and execution. This chapter focuses on key external works elements such as landscaping, rendering, and drainage, providing detailed principles for their measurement and documentation within the architectural profession.
External works encompass various site development and finishing activities that contribute to the functionality and aesthetics of a building project. Proper documentation of these elements is essential for clear communication among architects, contractors, and quantity surveyors. In Kenya, external works often involve site-specific considerations such as soil conditions, climate, and local materials, which must be reflected accurately in measurement practices.
Landscaping works integrate natural and constructed elements to enhance the external environment of a building. They include soft landscaping, such as grass, trees and flower beds, and hard landscaping, such as parking areas, kerbs, paved walkways and cabro surfaces. Accurate documentation of landscaping is crucial for cost control and ensuring the design intent is realized, especially in public institutions such as county government offices or private developments like hotels.
Vehicular parking is the paved area set aside for cars and other vehicles to park and manoeuvre, made up of parking bays, access aisles, kerbs, drainage and markings. It must be documented with its layout, the number and size of bays, the pavement layers and the drainage, because these govern cost, usability and durability. A typical car bay is about 2.5 m wide by 5.0 m long, with a two-way aisle of about 6.0 m for right-angle parking, and accessible bays are made wider, about 3.6 m. Example: the parking for a new bank branch is documented on a site plan showing 24 bays, one accessible bay, the access aisle, kerb lines and drainage channels.
| Component | Typical specification | Purpose |
|---|---|---|
| Subgrade | Natural ground compacted to specification | Supports the pavement |
| Sub-base | Hardcore or gravel, about 150 to 200 mm | Spreads loads and drains water |
| Base | Crushed stone or murram, about 100 to 150 mm | Main load-bearing layer |
| Bedding layer | Sand about 30 to 50 mm | Bed for blocks or slabs |
| Surfacing | Cabro, paving blocks, concrete or asphalt | Wearing surface |
| Markings and signs | Road paint, wheel stops, signage | Bay layout and traffic control |
Kerbs are edging units, usually precast concrete, laid along the edges of roads, parking areas, walkways and planting beds. They restrain the edges of the paving, guide surface water to drains, separate vehicles from pedestrians and give a neat finish. Kerbs are documented by type, size, profile and bedding, since these affect both cost and performance. Example: the internal road of a secondary school is documented with half-battered kerbs along the carriageway and flush kerbs where it meets the paved parade ground.
| Type | Typical size (mm) | Use |
|---|---|---|
| Half-battered kerb | About 125 or 150 wide × 250 or 300 high × 500 to 915 long | Road and parking edges |
| Bullnosed kerb | Similar sizes, rounded top | Areas where vehicles may mount the kerb |
| Splayed kerb | Sloped face | Low kerbs at driveways |
| Flush or edge kerb | About 50 to 125 wide | Edges of walkways and planting beds |
| Dropped kerb | Lowered unit | Driveway entrances and pedestrian crossings |
Paving blocks are precast concrete or clay units laid on a sand bed to form hard surfaces for walkways, courtyards, driveways and parking areas. They include plain rectangular blocks, concrete paving slabs and decorative blocks in different colours and textures. They are popular because they are durable, easy to repair by lifting and relaying individual blocks, and allow some water to pass through the joints. Example: the walkways and courtyard of a hotel are documented as 60 mm grey and red concrete paving blocks laid in a herringbone pattern on a 50 mm sand bed.
| Type | Typical thickness | Use |
|---|---|---|
| Concrete paving blocks | 60 mm | Footpaths and light traffic |
| Concrete paving blocks | 80 mm | Driveways and parking areas |
| Heavy-duty blocks | 100 mm or more | Heavy vehicles and loading areas |
| Concrete paving slabs | 40 to 50 mm, 400 × 400 or 600 × 600 mm | Pedestrian areas and patios |
| Clay pavers | 50 to 65 mm | Decorative pedestrian paving |
Cabro is the term widely used in Kenya for interlocking concrete paving blocks, which lock into each other by their shape, such as zigzag, I-shape or dog-bone profiles. The interlocking shape spreads vehicle loads across many blocks, so cabro paving is stronger and more stable than plain blocks of the same thickness and suits driveways, parking areas, petrol stations and estate roads. Cabro is laid on a compacted sand bed over a base course, vibrated into place, and the joints are filled with fine sand. Example: the estate road of a housing SACCO's development is documented as 80 mm zigzag cabro on a 50 mm sand bed over a 150 mm crushed stone base.
| Feature | Typical specification | Purpose |
|---|---|---|
| Shape | Zigzag, I-shape, dog-bone or other interlocking profile | Interlock to resist movement |
| Thickness | 60 mm for pedestrian, 80 mm for vehicles, 100 mm for heavy traffic | Strength for expected loads |
| Concrete strength | Commonly specified compressive strength, for example 30 to 50 N/mm² | Durability under traffic |
| Bedding sand | About 30 to 50 mm, uniform | Even bed and levelling |
| Edge restraint | Concrete kerbs or edge beams | Prevent spreading of blocks |
Landscaping includes a variety of components that must be individually measured and documented to reflect their quantities and specifications accurately.
Measurement of landscaping works requires adherence to principles that ensure accuracy and clarity.
Accurate documentation links measured quantities to design drawings and specifications.
Landscaping documentation can be complex due to site variability and natural materials.
Rendering involves applying a protective and decorative coating over external walls. It is a significant external finishing element that affects building aesthetics and weather resistance. In the Kenyan context, rendering is common in residential, commercial, and institutional buildings, requiring precise measurement for cost estimation and quality control.
Different rendering types require distinct measurement approaches.
Rendering measurement must account for surface preparation and finishing layers.
Example: An external wall of a dispensary is 12 m long and 3 m high, with one window 1.5 m × 1.2 m and one door 0.9 m × 2.1 m.
Gross area = 12 × 3 = 36.00 m²
Openings = (1.5 × 1.2) + (0.9 × 2.1) = 1.80 + 1.89 = 3.69 m²
Net area = 36.00 − 3.69
Answer: 32.31 m² of rendering
Proper documentation ensures the rendering works meet design and quality standards.
Rendering quality impacts building durability and appearance.
Drainage is vital for managing surface and subsurface water around buildings, protecting foundations and landscaping. Drainage works also include the foul drainage that carries wastewater from the building to a sewer or to on-site treatment such as septic tanks, soak pits and biodigesters. Accurate measurement and proper documentation are essential for effective construction and maintenance, especially in Kenya’s varied climate zones.
A manhole is an underground chamber large enough for a person to enter, built on a drain or sewer line to allow inspection, cleaning and repair. Manholes are placed at changes of direction, gradient or pipe size, at junctions and at regular intervals on long runs, and they are usually used where drains are deep. They are built of brick, block, precast concrete rings or in-situ concrete, with a benched channel at the base, step irons for access and a cover strong enough for the traffic above. Example: the foul drainage of a shopping mall is documented with manholes at each junction, showing invert levels, depths, internal sizes and heavy-duty covers in the parking area.
| Component | Typical specification | Purpose |
|---|---|---|
| Base | Concrete about 150 to 200 mm thick | Foundation for the chamber |
| Walls | Brick, block or precast rings | Form the chamber |
| Internal size | About 1,200 × 750 mm rectangular or 1,200 mm diameter, varying with depth | Space for a person to work |
| Benching and channel | Smooth concrete sloping to a half-round channel | Guide flow and prevent solids settling |
| Step irons or ladder | Galvanised or plastic-coated steel | Safe access |
| Cover and frame | Cast iron or concrete, light, medium or heavy duty | Close the chamber and carry traffic |
An inspection chamber is a smaller, shallower access point on a drain that allows rodding and inspection from the surface without a person entering. It is used where drains are shallow, typically less than about 1 m deep, at bends, junctions and changes of gradient on domestic drainage. Inspection chambers are commonly built of brick or block or supplied as prefabricated plastic units. Example: the drainage for a private residence is documented with brick inspection chambers of 600 × 450 mm internal size at each bend and junction, with light-duty covers.
| Component | Typical specification | Purpose |
|---|---|---|
| Internal size | About 450 × 450 mm to 600 × 450 mm, or 450 mm diameter plastic | Access for rods and inspection |
| Walls | Brick or block, or prefabricated plastic | Form the chamber |
| Benching | Concrete to the channel | Smooth flow |
| Cover | Light-duty concrete, cast iron or plastic | Close the chamber |
| Feature | Manhole | Inspection chamber |
|---|---|---|
| Person entry | Yes | No |
| Depth | Deeper drains | Shallow drains, about 1 m or less |
| Size | Larger | Smaller |
| Access fittings | Step irons or ladder | None |
| Typical use | Main and public drains | Domestic drains |
A soak pit is an underground pit, lined with open-jointed masonry or filled with stones, that allows wastewater to soak slowly into the surrounding soil. It commonly receives the liquid effluent from a septic tank or greywater from kitchens and showers, and works only where the soil is permeable and the water table is well below the pit. Soak pits must be located at safe distances from boreholes, wells and buildings to avoid contamination and damage. Example: a rural health centre with a septic tank is documented with a soak pit 2 m in diameter and 3 m deep, located well away from its water well.
| Component | Typical specification | Purpose |
|---|---|---|
| Pit | Circular or rectangular excavation, about 1.5 to 3 m deep | Hold and release effluent |
| Lining | Honeycomb (open-jointed) brick or block | Support sides while allowing seepage |
| Fill | Hardcore or ballast, where unlined | Support and filter |
| Cover slab | Reinforced concrete with access cover | Close the pit and allow inspection |
| Inlet pipe | From septic tank or greywater line | Bring effluent in |
A septic tank is a watertight underground tank that receives sewage from a building, holds it long enough for solids to settle and partly break down, and discharges the clarified effluent to a soak pit or drainage field. It is used where there is no public sewer, and is normally divided into two chambers, the first about two thirds of the total volume, with baffles or tee pipes to stop scum and sludge leaving. The tank must be sized for the number of users, be accessible for desludging and be located at safe distances from buildings and water sources. Example: a boarding school without sewer connection is documented with a two-chamber septic tank sized for its population, with access covers for desludging and an outlet to soak pits.
| Component | Typical specification | Purpose |
|---|---|---|
| Walls and base | Reinforced concrete or rendered masonry, watertight | Contain the sewage |
| Two chambers | First chamber about two thirds of volume | Settlement and digestion |
| Inlet and outlet tees or baffles | PVC tees or concrete baffles | Retain scum and sludge |
| Cover slab | Reinforced concrete with access covers | Close tank and allow desludging |
| Vent pipe | PVC pipe | Release gases |
A common sizing guide gives the capacity as C = 180P + 2,000 litres, where P is the number of users.
Example: Find the capacity of a septic tank for 20 users.
C = 180 × 20 + 2,000 = 3,600 + 2,000
Answer: 5,600 litres (5.6 m³)
A biodigester is an airtight tank in which organic waste, such as animal dung, toilet waste or food waste, is broken down by bacteria without oxygen to produce biogas and a nutrient-rich slurry. The biogas, mainly methane, is used for cooking, lighting or heating, while the slurry is used as fertiliser, and the system also treats waste that would otherwise pollute the environment. Biodigesters may be fixed-dome masonry, floating-drum or prefabricated plastic units, and they are increasingly used in place of septic tanks at institutions. Example: a dairy farm's biodigester takes cow dung from the zero-grazing unit and supplies biogas to the farmhouse kitchen, with the slurry spread on the fodder fields.
| Component | Purpose |
|---|---|
| Inlet or mixing tank | Mixing waste with water before it enters the digester |
| Digester chamber | Anaerobic breakdown of the waste |
| Gas holder or dome | Collecting and storing biogas |
| Outlet or expansion chamber | Discharging digested slurry |
| Gas pipe and valves | Carrying gas to burners and appliances |
| Slurry pit | Storing slurry for use as fertiliser |
Drainage works comprise further elements beyond the chambers and treatment units above, and these must be documented distinctly.
Drainage measurement involves linear, area, and volume quantities depending on the component.
Drainage documentation must integrate with overall site plans and utility drawings.
Drainage installation faces practical challenges requiring careful management.
Explain the key components of landscaping works and how each should be measured in a construction project. (10 marks)
Describe the measurement techniques used for rendering works on external walls, including how openings are accounted for. (12 marks)
Outline the main elements of a drainage system and discuss the principles for accurately measuring each. (13 marks)
Discuss the challenges faced in documenting external works on a building site and suggest best practices to overcome them. (10 marks)
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covers the essential principles for applying construction external work taking off, beginning with detailed documentation of key external works elements. It explores landscaping works including vehicular parking, kerbs, paving blocks, and cabro, emphasizing their individual specifications and roles. Rendering works are addressed alongside vital drainage components such as manholes, inspection chambers, soak pits, septic tanks, and biodigesters, highlighting their structural and functional importance. The quantification of these external works elements follows, providing methods to accurately measure vehicular parking areas, kerbs, paving blocks, cabro, and various drainage installations. Finally, the chapter explains the systematic process of quantity booking for each element to ensure precise record-keeping and cost estimation. Together, these topics equip learners with a comprehensive understanding of how to document, quantify, and book external construction works effectively.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Computer with Microsoft Excel software | Architectural external works plan |
| Calculator | Specification document for external works |
| Printer | Dimension sheets |
| Abstract sheets | |
| Billing sheets | |
| CESMM/SMM standard measurement codes | |
| Stationery (pens, erasers, rulers) |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Architectural external works plan | 1 Sheet per Candidate |
| 2 | Specification document for external works | 1 Document per Candidate |
| 3 | Dimension sheets | 2 Sheets per Candidate |
| 4 | Abstract sheets | 2 Sheets per Candidate |
| 5 | Billing sheets | 1 Sheet per Candidate |
| 6 | Computer with Microsoft Excel software | 1 Unit per Candidate |
| 7 | Calculator | 1 Unit per Candidate |
| 8 | Printer | 1 Unit per 5 Candidates |
| 9 | Stationery (pens, erasers, rulers) | Set per Candidate |
| 10 | CESMM/SMM standard measurement codes | 1 Copy per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identification and documentation of external works elements | |||
| Identified documents used to prepare Bill of Quantities: Bill paper, CESMM/SMM, Abstract Paper (Award 1 mark each or zero x 3 = 3 Marks) | 3 | ||
| Observed occupational safety and health precautions in the computer lab: Ventilation, Lighting, Sanitation (Award 1 mark each or zero x 3 = 3 Marks) | 3 | ||
| Interpreted the external works plan correctly: Dimensions, Earthworks, Hardcore filling, Paving (Award 1 mark each or zero x 4 = 4 Marks) | 4 | ||
| Transferred the scaled dimensions into the dimension paper accurately: 12000mm, 8500mm, 300mm depth for hardcore (Award 2 marks each or zero x 3 = 6 Marks) | 6 | ||
| Transferred the calculations from dimension paper to abstract paper: Volume earthworks, Area paving, Length kerbs (Award 2 marks each or zero x 3 = 6 Marks) | 6 | ||
| Transferred the calculations from abstract paper to billing paper: Volume, Area, Length appropriately recorded (Award 2 marks each or zero x 2 = 4 Marks) | 4 | ||
| Correctly switched on computer and launched Microsoft Excel software (Award 2 marks or zero) | 2 | ||
| Keyed data from billing sheet into relevant Microsoft Excel columns (Award 3 marks or zero) | 3 | ||
| Used Microsoft Excel formulas to verify quantities: AutoSum, Average, Multiplication (Award 2 marks each or zero x 3 = 6 Marks) | 6 | ||
| Printed the Bill of Quantities document and handed over (Award 2 marks or zero) | 2 | ||
| Switched off the computer correctly (Award 3 marks or zero) | 3 | ||
| Duly printed Bill of Quantities containing: Item column, Description column, Unit column, Rate column, Amount column (Award 1 mark each or zero x 4 = 4 Marks) | 4 | ||
| Sub-Total | 46 | ||
| PRODUCT CHECKLIST | |||
| Final Bill of Quantities document correctly shows external works elements with accurate measurements: 12000mm length, 8500mm width, 300mm hardcore depth (Award 10 marks or zero) | 10 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 56 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring tape 30m | Architectural plan for vehicular parking area |
| Calculator | Dimension sheets |
| Markers and chalk | Abstract sheets |
| Computer with Microsoft Excel software | Billing sheets |
| Printer | CESMM/SMM standard measurement codes |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Architectural plan for vehicular parking area | 1 set per Candidate |
| 2 | Dimension sheets | 2 sheets per Candidate |
| 3 | Abstract sheets | 2 sheets per Candidate |
| 4 | Billing sheets | 1 sheet per Candidate |
| 5 | Calculator | 1 per Candidate |
| 6 | Measuring tape 30m | 1 per Candidate |
| 7 | Markers and chalk | 1 set per Candidate |
| 8 | Computer with Microsoft Excel software | 1 per Candidate |
| 9 | Printer with printing paper | 1 per Candidate |
| 10 | CESMM/SMM standard measurement codes | 1 copy per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Setting out and measurement | |||
| Identified and used correct documents: Architectural plan, CESMM/SMM, Dimension and Abstract sheets (Award 1 mark each) | 3 | ||
| Observed occupational safety and health precautions: Ventilation, lighting, and workspace organization (Award 1 mark each) | 3 | ||
| Interpreted the architectural plan correctly: identified vehicular parking dimensions 12000mm x 9000mm (Award 2 marks each) | 4 | ||
| Transferred scaled dimensions correctly onto dimension sheets: 12000mm length and 9000mm width (Award 2 marks each) | 4 | ||
| Measured and recorded surface area and perimeter accurately on abstract sheets (Award 2 marks each) | 4 | ||
| Transferred calculated quantities to billing sheets with correct units and descriptions (Award 2 marks each) | 4 | ||
| Correctly set up Microsoft Excel workbook with appropriate columns and formulas (Award 3 marks) | 3 | ||
| Entered data accurately into Microsoft Excel columns (Award 3 marks) | 3 | ||
| Used Excel formulas to verify quantities: Auto sum, multiplication, and average (Award 2 marks each) | 6 | ||
| Printed the bill of quantities document correctly and handed over (Award 2 marks or zero) | 2 | ||
| Switched off computer and other equipment correctly (Award 2 marks) | 2 | ||
| Sub-Total | 38 | ||
| PRODUCT CHECKLIST | |||
| Finished vehicular parking area set out with dimensions 12000mm by 9000mm within allowable tolerance ±10mm (Award 3 marks) | 3 | ||
| Correctly calculated surface area (108 m²) and perimeter (42 m) recorded on abstract and billing sheets (Award 3 marks) | 3 | ||
| Bill of Quantities contains item, description, unit, rate, and amount columns correctly filled (Award 4 marks) | 4 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 48 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.