Architecture  ·  Level 6
Building Works Measurement Principles
Chapter 1: Apply substructure works taking off principles
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • accurately document substructure elements following the correct procedures
  • correctly quantify the quantities of substructure elements to the required standard
  • accurately record the quantities of substructure elements following the correct procedures

Mastering these skills ensures your measurements are precise and reliable, which is essential for successful building projects and professional growth in the trade.

Building a durable and stable structure begins with a well-executed substructure. In architectural practice in Kenya, the substructure forms the critical foundation that supports the entire building above ground. Precise measurement and clear documentation of substructure works ensure that construction proceeds according to design specifications, preventing costly errors and ensuring safety. This chapter delves into the principles of applying substructure works taking off, focusing on key elements such as excavation, blinding, damp-proofing, reinforcement, and foundation components.

1.1 Substructure Elements Documentation

Accurate documentation of substructure elements is vital for architects and quantity surveyors to quantify work, estimate costs, and ensure compliance with building regulations. Each element within the substructure has specific measurement principles and construction requirements that impact the overall stability and longevity of the building. In Kenya, adherence to standards stipulated by the National Construction Authority (NCA) and the Building Code is essential when documenting these elements.

1.1.1 Trench Excavation

Trench excavation is the initial step in preparing the ground for foundation works. It involves removing soil to specified dimensions to accommodate foundation footings or strip foundations. This process requires careful consideration of soil type, depth, and safety to prevent collapse or undermining adjacent structures.

Definition and Purpose of Trench Excavation

Trench excavation refers to the removal of earth along a narrow, elongated area to form a trench that will receive foundation elements. Its purpose is to create a stable base free from loose or organic materials, ensuring the foundation rests on firm soil. For example, in a Nairobi County government office construction, trench excavation must reach depths that avoid seasonal water table fluctuations to minimize settlement risks.

Measurement Principles for Trench Excavation

Measurement involves recording the length, width, and depth of the trench in cubic meters. The width includes allowances for formwork and working space, not just the foundation base width. Depth must be measured from the original ground level to the bottom of the trench, considering any benching or battering slopes as required by site conditions. Kenyan quantity surveyors must verify these dimensions on-site to prevent under- or over-measurement.

Safety and Environmental Considerations

Excavation must comply with safety standards to protect workers and prevent collapse. In urban Nairobi, trenches near existing utilities require coordination with service providers to avoid damaging water or electrical lines. Environmental concerns include managing displaced soil and preventing erosion, especially during rainy seasons.

1.1.2 Reducing Level

The reducing level (RL) is a critical vertical datum used in setting out foundations. It indicates the height relative to a fixed reference point, guiding excavation and construction levels.

Meaning and Use of Reducing Level

Reducing level is the vertical height assigned to a specific point on site, often relative to mean sea level or a benchmark established by surveyors. It guides excavation depth and ensures uniformity in foundation levels across the site. For instance, at a county hospital expansion project in Kisumu, accurate RLs prevent uneven foundation depths that could cause structural imbalance.

Determining Reducing Levels on Site

RLs are determined using leveling instruments such as a dumpy level or automatic level. Surveyors establish a reference benchmark, then measure vertical distances to excavation points. These measurements must be precise, as errors in RLs can lead to foundation misalignment.

Recording and Applying Reducing Levels

Once determined, RLs are recorded on site drawings and used to guide excavation and construction teams. Architects and quantity surveyors use RL data to verify that foundation elements are constructed at the correct depth, ensuring compliance with design specifications.

1.1.3 Blinding

Blinding is a thin layer of concrete placed on the excavated surface before the foundation is constructed. It provides a clean, level base and prevents contamination of structural concrete by soil.

Purpose of Blinding in Substructure Works

Blinding protects the foundation concrete from dirt, moisture, and loose soil, which can weaken the foundation. It also provides a level working surface for setting out reinforcement and formwork. In a retail complex foundation in Mombasa, blinding ensures that the base is clean and level, facilitating accurate reinforcement placement.

Materials and Thickness Specifications

Blinding typically uses lean concrete with a low cement content, such as mix 1:4:8 (cement:sand:aggregate), and is usually 50 to 100 mm thick. The choice of materials and thickness depends on site conditions and structural requirements.

Measurement and Documentation of Blinding

Measurement is by area and thickness to calculate volume in cubic meters. Quantity surveyors must ensure that blinding is accounted for separately from foundation concrete in bills of quantities, reflecting its distinct purpose and cost.

1.1.4 Damp-Proof Membrane

A damp-proof membrane (DPM) is a thin impervious layer placed beneath the floor slab or foundation to prevent moisture migration from the ground.

Function and Importance of Damp-Proof Membrane

DPM prevents rising damp that can damage finishes and structural elements. It is crucial in Kenya’s humid coastal regions, where moisture ingress can cause mold growth and corrosion. For example, in coastal hotels in Mombasa, DPMs extend the durability of floor finishes and internal walls.

Types and Materials Used for DPM

Common materials include polyethylene sheets, bitumen-based membranes, or rubberized asphalt. Thickness typically ranges from 0.15 to 0.5 mm depending on the product. Selection depends on site conditions, cost, and compatibility with other materials.

Measurement and Installation Considerations

Measurement is by area in square meters, including overlaps and laps. Installation requires careful sealing at joints and edges to maintain continuity. Quantity surveyors must document the DPM type and area accurately for procurement and quality control.

1.1.5 Reinforcement Bars

Reinforcement bars (rebars) strengthen concrete foundations, providing tensile strength that concrete alone cannot resist.

Role of Reinforcement Bars in Foundations

Rebars resist tensile stresses caused by loads and prevent cracking. In Nairobi’s high-rise residential buildings, proper reinforcement ensures foundation integrity under variable loading conditions.

Types and Specifications of Reinforcement Bars

Common rebars are made of mild steel or high-yield steel, with diameters ranging from 6 mm to 25 mm. Kenyan Standard KS EAS 18 specifies mechanical properties and dimensions to ensure quality.

Measurement and Documentation

Rebar measurement is by weight (kilograms) or length (meters), depending on contract requirements. Accurate cutting schedules and bending details are essential for cost estimation and minimizing wastage.

1.1.6 BRC Mesh

BRC (British Reinforcement Concrete) mesh is a prefabricated steel reinforcement used for slabs and sometimes in foundations to distribute loads evenly.

Characteristics and Uses of BRC Mesh

BRC mesh consists of welded steel bars arranged in a grid pattern, providing uniform reinforcement. In county government office floor slabs, BRC mesh accelerates construction and ensures consistent load distribution.

Specifications and Standards

Mesh sizes vary, commonly 150 mm x 150 mm spacing, with bar diameters from 6 mm to 12 mm. Kenyan projects follow KS EAS 18 and manufacturer guidelines for installation.

Measurement and Handling

Measured by area (square meters), BRC mesh must be handled carefully to avoid bending or damage. Documentation includes mesh type, size, and quantity for accurate billing.

1.1.7 Damp Proof Course

The damp proof course (DPC) is a horizontal barrier in walls near the ground level that prevents moisture rising from the foundation into the walls.

Purpose and Importance of DPC

DPC protects walls and finishes from dampness, which can cause structural deterioration and health hazards. In schools around Nakuru, DPC ensures classrooms remain dry and comfortable.

Materials and Installation Techniques

Materials include bituminous felt, polyethylene sheets, or slate. Installation requires continuous, unbroken layers at least 150 mm above ground level.

Measurement and Documentation

Measured by length and width, DPC is included in walling bills of quantities. Accurate documentation ensures correct quantities and prevents moisture-related defects.

1.1.8 Foundation Strip

Foundation strips are continuous concrete footings supporting walls, distributing structural loads safely to the ground.

Function and Structural Role

Foundation strips spread loads from walls over a wider soil area to prevent settlement. In county hospitals, well-designed foundation strips ensure longevity despite heavy equipment loads.

Design and Dimensioning

Dimensions depend on soil bearing capacity and wall load, often ranging from 450 mm to 900 mm wide and 150 mm to 300 mm thick. Kenyan architects must consider local soil tests when specifying sizes.

Measurement for Quantity Surveying

Measured in cubic meters, foundation strips require length, width, and thickness for volume calculation. Correct measurement avoids cost overruns due to underestimation.

1.1.9 Foundation Walling

Foundation walls transfer loads from the superstructure to the foundation strip or footing.

Role and Types of Foundation Walls

Foundation walls may be concrete, masonry, or stone, depending on design and materials availability. For example, in rural cooperative housing projects, stone foundation walls are common due to local material access.

Construction and Material Specifications

Walls must be constructed with durable materials and proper mortar mix to resist moisture and soil pressure. Kenyan building codes require minimum compressive strength and proper curing.

Measurement and Documentation

Measured by length, height, and thickness to calculate volume or area. Detailed records ensure accurate cost estimation and quality control.

1.1.10 Hard Core Fill

Hard core fill consists of compacted inert materials used to provide a stable base beneath floors or slabs.

Purpose and Benefits of Hard Core Fill

It improves load distribution, prevents settlement, and facilitates drainage beneath floors. For instance, in hotel foundations in Kisii, hard core fill prevents water pooling and supports heavy loads.

Materials and Compaction Requirements

Materials include crushed stone, gravel, or broken concrete. Compaction to specified density is crucial for performance, with Kenyan standards requiring at least 95% Proctor density.

Measurement and Site Considerations

Measured in cubic meters, hard core fill quantities depend on excavation depth and slab thickness. Proper site preparation and compaction records are essential for compliance.

1.1.11 Floor Bed

The floor bed is the layer on which the floor finish is laid, often consisting of sand and cement mix.

Function and Composition of Floor Bed

It provides a smooth, level surface for floor finishes and protects underlying structural elements. In university lecture halls, a well-prepared floor bed ensures even tile installation.

Materials and Thickness Specifications

Typically a 25 to 50 mm thick mix of cement and sharp sand, the floor bed must be durable and well-bonded. Material quality directly affects floor finish durability.

Measurement and Documentation

Measured by area and thickness for volume calculation. Accurate documentation helps in procurement and quality assurance.

Practice Questions

  1. Explain the significance of trench excavation in substructure works and describe how it is measured on site. (10 marks)
  2. Define reducing level and discuss its role in foundation construction with reference to a Kenyan construction project. (10 marks)
  3. Describe the purpose of blinding and how it differs from the foundation concrete in terms of composition and function. (10 marks)
  4. Discuss the functions of damp-proof membrane and damp proof course, highlighting their differences in location and purpose. (10 marks)
  5. Outline the key factors to consider when specifying reinforcement bars for substructure foundations. (10 marks)
  6. Describe the role of hard core fill in substructure works and the importance of compaction standards. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Substructure Elements Quantification

Substructure elements form the foundation upon which the entire architectural structure rests. Accurate quantification of these elements is critical in Kenya’s construction industry to ensure cost control, material procurement, and structural integrity. For in…

🔒1.3 Substructure Elements Booking

In architectural practice within Kenya, accurate booking of substructure elements is essential for cost control, tender preparation, and project management. The substructure forms the foundation of a building, and precise measurement ensures that quantities of…

Chapter Summary

This chapter provided a comprehensive overview of the principles involved in applying substructure works taking off. It began by detailing the documentation required for key substructure elements such as trench excavation, reducing level, blinding, damp-proof membrane, reinforcement bars, BRC mesh, damp proof course, foundation strip, foundation walling, hard core fill, and floor bed. The focus then shifted to the quantification of these elements, explaining how to accurately measure and calculate the volumes and areas necessary for each component to ensure proper resource allocation and cost estimation. Following quantification, the chapter addressed the booking process for the same substructure elements, emphasizing the importance of precise recording and organization of measurements in the building works context. Through this structured approach, students gain the skills to document, quantify, and book substructure works effectively, laying a solid foundation for accurate project planning and execution in construction.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of a damp-proof membrane in substructure works? (2 marks)
  2. Identify three key factors to consider when measuring trench excavation for a foundation. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the role of trench excavation in the substructure works of a residential building at a county government office project in Kenya. (4 marks)
  2. Describe how reducing level is established and its importance in setting out foundations for a commercial building in Nairobi. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Prepare and document substructure elements for a single-storey residential building

Architecture · Level 6
Building Works Measurement Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare and document all substructure elements including strip foundations and hardcore filling for a building substructure measuring 9000mm length x 6000mm width.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Computer with Microsoft Excel softwareArchitectural plan (A3 size)
Scientific calculatorStructural drawings
Stationery: pencils, erasers, rulers, pensBill of Quantities abstract sheets
Dimension sheets
Billing sheets
CESMM/SMM reference booklet
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Architectural plan (A3 size)1 set per Candidate
2Structural drawings1 set per Candidate
3Bill of Quantities abstract sheets2 sheets per Candidate
4Dimension sheets2 sheets per Candidate
5Billing sheets2 sheets per Candidate
6CESMM/SMM reference booklet1 per 3 Candidates
7Computer with Microsoft Excel software1 per Candidate
8Scientific calculator1 per Candidate
9Stationery: pencils, erasers, rulers, pensSet per Candidate
10Printer with printing paperShared among 5 Candidates
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and preparation of documents
Identified all relevant documents used to prepare BOQ: Bill paper, CESMM/SMM, Abstract Paper
(Award 1 mark each or zero x 3 = 3 Marks)
3
Observed occupational safety and health precautions in the computer lab: Ventilation, Lighting, Sanitation
(Award 1 mark each or zero x 3 = 3 Marks)
3
Sub-Total6
TASK 2: Interpretation and transfer of dimensions
Interpreted the architectural and structural plans: Dimensions, substructure elements
(Award 2 marks each or zero x 2 = 4 Marks)
4
Transferred the scaled dimensions into the dimension paper: 9000mm length
(Award 2 marks)
2
Transferred the scaled dimensions into the dimension paper: 6000mm width
(Award 2 marks)
2
Sub-Total8
TASK 3: Calculations and documentation
Transferred calculations from dimension paper to abstract paper: Volume and Area of strip foundations
(Award 2 marks each or zero x 2 = 4 Marks)
4
Transferred calculations from abstract paper to billing paper: Volume (concrete), Area (hardcore filling), Length (formwork)
(Award 2 marks each or zero x 3 = 6 Marks)
6
Sub-Total10
TASK 4: Use of Microsoft Excel software
Correctly set up Microsoft Excel workbook for BOQ preparation
(Award 2 marks)
2
Keyed data from billing sheet into relevant Excel columns
(Award 3 marks)
3
Used Excel formulas to verify quantities: Auto sum, Average, Multiplication
(Award 2 marks each or zero x 3 = 6 Marks)
6
Saved the Excel project file with appropriate project title
(Award 2 marks)
2
Printed the BOQ document and prepared the booklet for handover
(Award 2 marks)
2
Switched off the computer correctly after completion
(Award 2 marks)
2
Sub-Total17
PRODUCT CHECKLIST
Completed Bill of Quantities document containing: Item column, Description column, Unit column, Rate column, Amount column
(Award 2 marks each or zero x 3 = 6 Marks)
6
Accurate transfer and matching of scaled dimensions (9000mm length and 6000mm width) in documentation
(Award 2 marks each or zero x 2 = 4 Marks)
4
Correct calculation and presentation of quantities for all substructure elements
(Award 5 marks)
5
Sub-Total15
GRAND TOTAL56
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Excavate trench for foundation 4500mm x 600mm x 1200mm

Architecture · Level 6
Building Works Measurement Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Mark out and excavate a trench for strip foundation measuring 4500mm length x 600mm width x 1200mm depth.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measure 30mWorking drawing showing trench dimensions
Builder's square
Mason's line and pegs
Spade
Pick axe
Spirit level 600mm
Plumb bob
Safety helmet
Safety boots
Gloves
Marking paint
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Tape measure 30m1 Pc per Candidate
2Builder's square1 Pc per Candidate
3Mason's line and pegs1 Set per Candidate
4Spade1 Pc per Candidate
5Pick axe1 Pc per Candidate
6Spirit level 600mm1 Pc per Candidate
7Plumb bob1 Pc per Candidate
8Safety helmet1 Pc per Candidate
9Safety boots1 Pair per Candidate
10Gloves1 Pair per Candidate
11Working drawing showing trench dimensions1 Pc per Candidate
12Marking paint1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Prepare and mark out trench
Wears appropriate PPE (helmet, boots, gloves)
(Award 2 marks for all PPE worn correctly or zero)
2
Identifies and uses working drawing for trench dimensions
(Award 2 marks for correct use or zero)
2
Measures and marks out trench length 4500mm accurately
(Award 3 marks for length within ±10mm or zero)
3
Measures and marks out trench width 600mm accurately
(Award 3 marks for width within ±10mm or zero)
3
Sets mason’s line and pegs correctly to define trench edges
(Award 2 marks for correct line and pegs or zero)
2
Checks squareness of trench corners using builder’s square
(Award 3 marks for squareness within ±5mm or zero)
3
Sub-Total15
TASK 2: Excavate trench to specified depth
Uses spade and pick axe safely and effectively for excavation
(Award 3 marks for safe and proper use or zero)
3
Excavates trench to 1200mm depth within ±20mm tolerance
(Award 4 marks for correct depth or zero)
4
Maintains trench width and length during excavation
(Award 3 marks for consistent dimensions within ±10mm or zero)
3
Uses spirit level and plumb bob to check trench bottom level and vertical faces
(Award 3 marks for level and plumb within ±10mm or zero)
3
Sub-Total13
PRODUCT CHECKLIST
Trench length is 4500mm ±10mm as per drawing
(Award 3 marks for correct length or zero)
3
Trench width is 600mm ±10mm as per drawing
(Award 3 marks for correct width or zero)
3
Trench depth is 1200mm ±20mm as per drawing
(Award 4 marks for correct depth or zero)
4
Trench corners are square within 5mm tolerance
(Award 3 marks for squareness or zero)
3
Trench faces and bottom are vertical and level within tolerance
(Award 3 marks for plumb and level or zero)
3
Sub-Total16
GRAND TOTAL44
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Determine and record reducing levels for excavation sitePractical 3
🔒Lay blinding concrete layer in foundation trenchPractical 4
🔒Install damp-proof membrane over blinding layer for foundation substructurePractical 5
🔒Cut and fix reinforcement bars for 3000mm x 600mm foundation footingPractical 6
🔒Place and Secure BRC Mesh in Foundation Slab 4500mm x 3000mm x 150mmPractical 7
🔒Install damp proof course in foundation walling 4000mm x 300mm x 600mmPractical 8
🔒Construct foundation strip 600mm wide, 450mm deep, and 3500mm longPractical 9
🔒Construct foundation walling 4500mm long x 600mm high x 230mm thickPractical 10
🔒Prepare and compact 150mm thick hardcore fill in foundation basePractical 11
🔒Prepare and lay floor bed 4500mm x 3000mm x 150mm thickPractical 12
🔒Quantify substructure elements for foundation worksPractical 13
🔒Take off quantities for reinforcement bars and BRC mesh for a strip foundationPractical 14
🔒Prepare booking sheets for substructure footing and foundation wall materialsPractical 15
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • accurately document substructure elements following the correct procedures
  • correctly quantify the quantities of substructure elements to the required standard
  • accurately record the quantities of substructure elements following the correct procedures

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.