By the end of this chapter, you will be able to:
Mastering these skills will help you contribute confidently and safely to successful mining operations!
Mining site preparation is a foundational phase in mine surveying that ensures the site is ready for safe and efficient mining operations. In Kenya, where mining activities range from small-scale artisanal ventures to large commercial enterprises, proper preparation minimizes risks and facilitates accurate setting out of mine works. This chapter focuses on the critical tasks land surveyors undertake to prepare mining sites, aligning surveying precision with operational requirements. Effective site preparation supports compliance with regulatory standards and optimizes resource extraction.
Mining site preparation involves a series of coordinated activities to ready the terrain and environment for mining operations. Surveyors play a pivotal role in this stage by providing accurate spatial data, establishing control points, and ensuring the site conforms to design specifications. In Kenya, mining sites often face challenges such as irregular terrain, environmental sensitivity, and proximity to community settlements, necessitating meticulous preparation.
Initial site assessment involves gathering comprehensive information about the mining location to inform subsequent surveying and mining activities. This step is essential for identifying potential constraints, hazards, and features that influence mine design and setting out.
A robust survey control network is critical for accurate mine layout and ongoing monitoring. This network comprises fixed reference points whose positions are precisely determined to serve as the foundation for all survey measurements.
Before setting out mine works, the physical ground must be cleared and prepared to facilitate safe and precise surveying and construction activities. This process involves removing obstacles and ensuring the site surface is suitable for equipment and personnel.
Mining site preparation must align with Kenyan legal frameworks and environmental standards to avoid penalties and ensure sustainable operations. Surveyors contribute by verifying that site layouts respect these requirements.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter has explored the essential stages involved in setting out mine works, beginning with mining site preparation. It emphasized the importance of clearing and leveling the area to ensure accurate measurements and safe operations. The process of staking was examined next, highlighting how precise marking of boundaries and key points guides excavation and construction activities. Finally, the chapter addressed the critical role of checks and adjustment, which involve verifying measurements and correcting any discrepancies to maintain alignment with design specifications. Together, these steps ensure that mining projects proceed efficiently, safely, and according to plan. Mastery of these procedures is fundamental for surveyors working in the mining industry to support successful project execution.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Safety helmet | Pegs |
| Apron/dust coat | |
| Safety boots | |
| 30 m steel tape | |
| Mallet | |
| Pegs | |
| Handheld GPS Receiver | |
| Scientific calculator | |
| Writing materials |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Safety helmet | 1 Pc per Candidate |
| 2 | Apron/dust coat | 1 Pc per Candidate |
| 3 | Safety boots | 1 Pair per Candidate |
| 4 | 30 m steel tape | 1 Pc per Candidate |
| 5 | Mallet | 1 Pc per 3 Candidates |
| 6 | Pegs | 6 Pcs per Candidate |
| 7 | Handheld GPS Receiver | 1 Pc per 2 Candidates |
| 8 | Writing materials (foolscap sheets, pen) | 2 Sheets and 1 Pen per Candidate |
| 9 | Scientific calculator | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Use of PPE | |||
| Identified and wore safety helmet (Award 1 mark for correctly wearing helmet) | 1 | ||
| Wore apron/dust coat (Award 1 mark for correctly wearing apron/dust coat) | 1 | ||
| Wore safety boots (Award 1 mark for correctly wearing safety boots) | 1 | ||
| Sub-Total | 3 | ||
| TASK 2: Site selection and clearing | |||
| Selected a suitable flat and accessible mining site (Award 1 mark for correct site selection) | 1 | ||
| Cleared vegetation and debris within the 30m x 15m area (Award 2 marks for thorough clearing of the site) | 2 | ||
| Marked and pegged the four corners of the rectangular site accurately (Award 2 marks for correct pegging and marking) | 2 | ||
| Sub-Total | 5 | ||
| TASK 3: Measurement and recording | |||
| Measured and confirmed the length of 30,000mm and width of 15,000mm using a steel tape (Award 2 marks for accurate measurement) | 2 | ||
| Recorded measurements and site coordinates correctly in writing materials (Award 2 marks for accurate recording) | 2 | ||
| Used handheld GPS receiver to record coordinates of the four corner points (Award 2 marks for correct GPS use and recording) | 2 | ||
| Sub-Total | 6 | ||
| TASK 4: Final site preparation | |||
| Checked and ensured pegs are firmly fixed and visible (Award 1 mark for firm pegging) | 1 | ||
| Ensured site is free from obstacles and ready for staking and survey works (Award 1 mark for readiness confirmation) | 1 | ||
| Sub-Total | 2 | ||
| PRODUCT CHECKLIST | |||
| Rectangular site correctly pegged at 30,000mm by 15,000mm with visible and firmly fixed pegs (Award 3 marks for correct dimensions and pegging) | 3 | ||
| Accurate recording of four corner coordinates in writing materials and GPS readings (Award 3 marks for accuracy and completeness) | 3 | ||
| Sub-Total | 6 | ||
| GRAND TOTAL | 22 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Total Station with accessories | Pegs |
| Handheld GPS Receiver | Printing materials (A4 size) |
| 30 m steel tape | |
| Mallet | |
| Scientific Calculator | |
| Writing materials (foolscap paper) |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Total Station with accessories | 1 per 3 Candidates |
| 2 | Handheld GPS Receiver | 1 per 3 Candidates |
| 3 | 30 m steel tape | 1 per Candidate |
| 4 | Pegs | 10 Pcs per Candidate |
| 5 | Mallet | 1 per 5 Candidates |
| 6 | Writing materials (foolscap paper) | 2 Sheets per Candidate |
| 7 | Scientific Calculator | 1 per Candidate |
| 8 | Printing materials (A4 size) | 2 Sheets per Candidate |
| 9 | Printer/Plotter | 1 per 5 Candidates |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Use of PPE | |||
| Identified and wore apron or dust coat (Award 1 mark if worn correctly) | 1 | ||
| Identified and wore boots or closed shoes (Award 1 mark if worn correctly) | 1 | ||
| Sub-Total | 2 | ||
| TASK 2: Site selection and initial point marking | |||
| Selected a suitable flat site for road alignment (Award 1 mark for correct site selection) | 1 | ||
| Marked and pegged two intervisible points 60m apart for road length (Award 2 marks if points are correctly spaced and visible) | 2 | ||
| Sub-Total | 3 | ||
| TASK 3: Measurement and coordinate recording | |||
| Configured handheld GPS receiver correctly (Award 1 mark for correct configuration) | 1 | ||
| Measured and recorded coordinates of the two end points (N, E, Z) (Award 2 marks if coordinates recorded accurately) | 2 | ||
| Sub-Total | 3 | ||
| TASK 4: Total Station setup and orientation | |||
| Mounted tripod stand correctly over first point (Award 1 mark if tripod is stable and centred) | 1 | ||
| Levelled and centred total station over the point (Award 2 marks if instrument is levelled and centred accurately) | 2 | ||
| Oriented total station to the second point (Award 2 marks if orientation is precise) | 2 | ||
| Sub-Total | 5 | ||
| TASK 5: Setting out road width and staking alignment | |||
| Measured and pegged road width of 5m along the length at correct intervals (Award 3 marks if width is consistent and stakes are well aligned) | 3 | ||
| Labelled pegs correctly according to layout plan (Award 1 mark for correct labelling) | 1 | ||
| Sub-Total | 4 | ||
| TASK 6: Recording and plotting | |||
| Recorded all peg coordinates accurately in field notes (Award 2 marks if records are complete and accurate) | 2 | ||
| Plotted alignment on graph paper or software as per layout (Award 3 marks for neatness and accuracy) | 3 | ||
| Sub-Total | 5 | ||
| PRODUCT CHECKLIST | |||
| Road alignment set out correctly with length 60,000 mm and width 5,000 mm with correct peg positions and labels (Award up to 10 marks for accuracy within ±0.1m, correct peg spacing, and alignment per drawing) | 10 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 32 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.