Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Digital multimeter | Resistors assorted pack |
| Breadboard | Capacitors assorted pack |
| Connecting wires | Diodes 1N4007 |
| Battery clip connector | 9V battery |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Resistors assorted pack (10 ohm, 100 ohm, 1k ohm, 10k ohm) | 5 Pcs per Candidate |
| 2 | Capacitors assorted pack (10 µF, 100 µF, 470 µF electrolytic) | 3 Pcs per Candidate |
| 3 | Diodes 1N4007 | 3 Pcs per Candidate |
| 4 | Breadboard | 1 Pc per Candidate |
| 5 | Multimeter digital | 1 Pc per Candidate |
| 6 | Connecting wires (solid core, 20 cm length) | 10 Pcs per Candidate |
| 7 | 9V battery | 1 Pc per Candidate |
| 8 | Battery clip connector for 9V battery | 1 Pc per Candidate |
| 9 | Safety goggles | 1 Pair per Candidate |
| 10 | Lab coat | 1 Pc per Candidate |
| 11 | Latex gloves | 1 Pair per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and Safety | |||
| Wore safety goggles, lab coat, and latex gloves before starting work (Award 1 mark for each PPE worn, 0 if incomplete) | 3 | ||
| Checked and identified each component correctly using color codes and markings (Award 1 mark for each correct component identification: 2 resistors, 2 capacitors, 2 diodes) | 4 | ||
| Tested each component using the digital multimeter to confirm functionality (Award 2 marks each for correctly testing resistor, capacitor, and diode respectively) | 6 | ||
| Sub-Total | 13 | ||
| TASK 2: Circuit Assembly | |||
| Connected components on the breadboard correctly according to the series circuit layout (Award 2 marks each for correct placement of resistors, capacitors, and diodes) | 6 | ||
| Used appropriate connecting wires ensuring secure and neat connections (Award 1 mark for wire choice, 1 mark for secure connections, 1 mark for neatness) | 3 | ||
| Connected the 9V battery correctly with polarity observed (Award 2 marks for correct polarity and secure connection) | 2 | ||
| Sub-Total | 11 | ||
| TASK 3: Testing and Verification | |||
| Powered the circuit and verified voltage across components using multimeter (Award 2 marks for powering circuit safely, 2 marks for correct voltage readings) | 4 | ||
| Demonstrated correct operation of the circuit by explaining component function (Award 4 marks for clear, accurate explanation) | 4 | ||
| Sub-Total | 8 | ||
| PRODUCT CHECKLIST | |||
| Completed series circuit with resistors (10Ω, 100Ω), capacitors (10µF, 100µF), and diodes (1N4007) connected correctly on the breadboard (Award 2 marks each for correct connection of resistors, capacitors, and diodes) | 6 | ||
| Circuit connections are neat, secure and components are correctly oriented (Award 4 marks for neatness, security, and correct polarity of diodes) | 4 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 42 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Multimeter (Digital) | Resistors (220 Ω) |
| Wire stripper | LEDs (Red) |
| Connecting wires | 9V Battery |
| Battery clip for 9V battery | Breadboard |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Resistors (220 Ω) | 4 Pcs per Candidate |
| 2 | LEDs (Red) | 2 Pcs per Candidate |
| 3 | 9V Battery | 1 Pc per Candidate |
| 4 | Battery clip for 9V battery | 1 Pc per Candidate |
| 5 | Breadboard | 1 Pc per Candidate |
| 6 | Connecting wires (assorted) | 10 Pcs per Candidate |
| 7 | Multimeter (Digital) | 1 Pc per Candidate |
| 8 | Wire stripper | 1 Pc per 5 Candidates |
| 9 | Mask | 1 Pair per Candidate |
| 10 | Latex gloves | 1 Pair per Candidate |
| 11 | Safety shoes | 1 Pair per Candidate |
| 12 | Dustcoat/Overall | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Assembly and Testing of Series Circuit | |||
| Wore appropriate PPE: Mask, Latex gloves, Safety shoes, Dustcoat/Overall (Award 1 mark for each PPE worn, 0 if incomplete, max 4 marks) | 4 | ||
| Connected 2 resistors and 1 LED in series on the breadboard correctly (Award 2 marks for correct resistor connections, 2 marks for correct LED polarity) | 4 | ||
| Connected the 9V battery correctly to the circuit with battery clip (Award 2 marks for correct polarity and secure connection) | 2 | ||
| Measured and recorded voltage across the LED using the multimeter (Award 2 marks for correct measurement and recording) | 2 | ||
| Measured and recorded current flowing through the circuit (Award 2 marks for correct measurement and recording) | 2 | ||
| Switched off and disconnected the battery safely after testing (Award 1 mark for safe disconnection) | 1 | ||
| Sub-Total | 15 | ||
| TASK 2: Assembly and Testing of Parallel Circuit | |||
| Assembled 2 resistors and 2 LEDs in parallel correctly on the breadboard (Award 2 marks for correct resistor placement, 3 marks for correct LED polarity and parallel layout) | 5 | ||
| Connected the 9V battery correctly to the parallel circuit (Award 2 marks for correct polarity and secure connection) | 2 | ||
| Measured and recorded voltage across each LED (Award 1.5 marks per LED for correct measurement and recording) | 3 | ||
| Measured and recorded current in each branch of the parallel circuit (Award 2 marks per branch for correct measurement and recording) | 4 | ||
| Switched off and disconnected the battery safely after testing (Award 1 mark for safe disconnection) | 1 | ||
| Sub-Total | 15 | ||
| PRODUCT CHECKLIST | |||
| Series circuit assembled with correct component placement and neat wiring (Award 2 marks for correct series connection, 2 marks for neat and secure wiring) | 4 | ||
| Parallel circuit assembled with correct component placement and neat wiring (Award 2 marks for correct parallel connection, 2 marks for neat and secure wiring) | 4 | ||
| Voltage and current readings recorded correctly for both circuits (Award up to 3 marks for accurate voltage readings, up to 3 marks for accurate current readings) | 6 | ||
| Circuit functionality verified: LEDs light up appropriately in series and parallel (Award 3 marks for correct LED operation in series, 3 marks for correct LED operation in parallel) | 6 | ||
| Sub-Total | 20 | ||
| GRAND TOTAL | 50 | ||