By the end of this chapter, you will be able to:
Mastering these skills ensures your signage installations are safe, professional, and meet real-world trade requirements, helping you build a strong reputation in the industry.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Electric Drill | Wall Plug (Plastic) 8mm |
| Screwdriver Set | Wood Screws 5 x 50 mm |
| Spirit Level | Signage Panel 800mm x 400mm x 5mm Acrylic |
| Tape Measure 5m | Cleaning Cloth |
| Hammer |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Electric Drill | 1 Pc per Candidate |
| 2 | Screwdriver Set | 1 Set per Candidate |
| 3 | Spirit Level | 1 Pc per Candidate |
| 4 | Tape Measure 5m | 1 Pc per Candidate |
| 5 | Hammer | 1 Pc per Candidate |
| 6 | Wall Plug (Plastic) 8mm | 4 Pcs per Candidate |
| 7 | Wood Screws 5 x 50 mm | 4 Pcs per Candidate |
| 8 | Safety Goggles | 1 Pair per Candidate |
| 9 | Dust Mask | 1 Pc per Candidate |
| 10 | Signage Panel 800mm x 400mm x 5mm Acrylic | 1 Pc per Candidate |
| 11 | Cleaning Cloth | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and Safety | |||
| Wears safety goggles and dust mask before commencing work (Award 2 marks or 0) | 2 | ||
| Clears and prepares the working area around the wall (Award 2 marks or 0) | 2 | ||
| Sub-Total | 4 | ||
| TASK 2: Layout and Setting Out | |||
| Measures and marks mounting points on the wall accurately at 800mm width and 400mm height (Award 3 marks or 0) | 3 | ||
| Checks and ensures marks are level and plumb using spirit level (Award 2 marks or 0) | 2 | ||
| Sub-Total | 5 | ||
| TASK 3: Fixing and Installation | |||
| Drills holes at marked points with correct drill bit for wall plugs (Award 3 marks or 0) | 3 | ||
| Inserts wall plugs correctly and flush with wall surface (Award 2 marks or 0) | 2 | ||
| Aligns signage panel and fastens it securely with screws (Award 3 marks or 0) | 3 | ||
| Ensures no damage to signage panel during fixing (Award 1 mark or 0) | 1 | ||
| Sub-Total | 9 | ||
| TASK 4: Finishing and Clean-up | |||
| Cleans signage panel surface and surrounding area after installation (Award 2 marks or 0) | 2 | ||
| Disposes of debris and tools are tidied away (Award 1 mark or 0) | 1 | ||
| Sub-Total | 3 | ||
| PRODUCT CHECKLIST | |||
| Signage panel mounted level within ±2mm tolerance on 800mm width and 400mm height (Award 3 marks or 0) | 3 | ||
| Signage panel is securely fixed with no movement or loose screws (Award 3 marks or 0) | 3 | ||
| No visible damage or scratches on signage panel surface (Award 2 marks or 0) | 2 | ||
| Fixings are flush and neat with no protruding screws (Award 2 marks or 0) | 2 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 31 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Shovel | Concrete Mix (Cement, Sand, Gravel) |
| Spirit Level | Freestanding Signpost (100 mm x 100 mm x 2400 mm) |
| Measuring Tape | Water |
| Wheelbarrow | Protective Gloves |
| Water Bucket | Safety Helmet |
| Steel Trowel | |
| String Line | |
| Wooden Stakes | |
| Hammer |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Shovel | 1 Pc per Candidate |
| 2 | Spirit Level | 1 Pc per Candidate |
| 3 | Measuring Tape | 1 Pc per Candidate |
| 4 | Wheelbarrow | 1 Pc per 3 Candidates |
| 5 | Concrete Mix (Cement, Sand, Gravel) | 20 kg per Candidate |
| 6 | Water Bucket | 1 Pc per Candidate |
| 7 | Freestanding Signpost (100 mm x 100 mm x 2400 mm) | 1 Pc per Candidate |
| 8 | Protective Gloves | 1 Pair per Candidate |
| 9 | Safety Helmet | 1 Pc per Candidate |
| 10 | Steel Trowel | 1 Pc per Candidate |
| 11 | String Line | 1 Pc per Candidate |
| 12 | Wooden Stakes | 2 Pcs per Candidate |
| 13 | Hammer | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Installation Process | |||
| Used appropriate PPE before commencement (Award 2 marks or 0) | 2 | ||
| Measured and marked the foundation location accurately (Award 2 marks or 0) | 2 | ||
| Dug a foundation hole to correct dimensions (600 mm deep, 300 mm diameter) (Award 3 marks or 0) | 3 | ||
| Mixed concrete to correct consistency (Award 3 marks or 0) | 3 | ||
| Positioned the signpost vertically using string line and spirit level (Award 3 marks or 0) | 3 | ||
| Fixed the post upright in foundation with concrete and compacted properly (Award 3 marks or 0) | 3 | ||
| Cleaned work area after installation (Award 2 marks or 0) | 2 | ||
| Sub-Total | 18 | ||
| PRODUCT CHECKLIST | |||
| Foundation hole dimensions correct (600 mm deep x 300 mm diameter) (Award 3 marks or 0) | 3 | ||
| Post is vertical and plumb within 2 degrees as checked by spirit level (Award 4 marks or 0) | 4 | ||
| Concrete fully set and properly compacted around post (Award 3 marks or 0) | 3 | ||
| Post height is 2400 mm above ground level as per specification (Award 2 marks or 0) | 2 | ||
| No visible damage or defects on the installed signpost (Award 2 marks or 0) | 2 | ||
| Sub-Total | 14 | ||
| GRAND TOTAL | 32 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.