Refrigeration And Air Conditioning  ·  Level 5
Hydrocarbon Rac Units Installation And Maintenance
Chapter 3: Install hydrocarbon RAC system
📚 10 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Identify the correct hydrocarbon RAC unit to install by following workplace procedures.
  • Follow health, safety, and environmental rules, including EPA, EMCA 2020, ASHRAE, ISO, and EN standards, to keep yourself and others safe.
  • Choose the right tools, equipment, and materials needed for installing hydrocarbon RAC units.
  • Install the hydrocarbon RAC unit accurately by carefully following the manufacturer’s instructions.
  • Perform lubrication and charging of the unit safely and correctly according to workplace procedures.
  • Select the appropriate insulation materials based on the specific task requirements.
  • Apply pipe insulation properly to ensure efficient system performance.
  • Maintain a clean and safe work area by doing proper housekeeping in line with environmental laws and workplace rules.
  • Prepare clear and accurate installation reports that document your work professionally.

Mastering these skills will help you install hydrocarbon RAC systems safely and efficiently, making you a valuable professional in the refrigeration and air conditioning trade.

Installation of hydrocarbon refrigeration and air conditioning (RAC) systems requires a detailed understanding of technical drawings and strict adherence to safety and environmental standards. In Kenya, where hydrocarbon refrigerants such as propane (R290) and isobutane (R600a) are increasingly adopted for their low global warming potential and energy efficiency, professionals must master interpretation of installation drawings and installation requirements. This knowledge ensures systems are installed correctly, safely, and in compliance with regulatory frameworks such as the Energy Act and environmental guidelines from NEMA. The chapter focuses on equipping technicians with practical skills and theoretical knowledge to handle hydrocarbon RAC systems from design interpretation through to installation.

3.1 Interpretation of Installation Drawings

Installation drawings are the blueprint for correctly assembling and installing hydrocarbon RAC systems. They provide the detailed layout, component specifications, and interconnections necessary for safe and efficient system operation. In Kenya’s diverse climate and infrastructure settings, accurate interpretation prevents costly errors and promotes compliance with industry standards.

3.1.1 Understanding Types of Installation Drawings

Installation drawings for hydrocarbon RAC systems come in several types, each serving specific functions in the installation process:

  • Schematic Diagrams: Show the functional relationships between components such as compressors, condensers, evaporators, and expansion devices. They do not depict physical placement but clarify refrigerant flow and control wiring.
  • Layout Drawings: Provide a scaled physical representation of the system placement within a building or plant. They include dimensions, spatial orientation, and mounting points, essential for site preparation.
  • Wiring Diagrams: Detail the electrical connections, including power supply, control circuits, and safety devices. Accurate wiring ensures electrical safety and proper operation of components like thermostats and sensors.
  • Piping and Instrumentation Diagrams (P&IDs): Illustrate the piping routes, valves, fittings, and instrumentation for monitoring and control. They are critical for ensuring proper refrigerant flow and pressure regulation.
  • Assembly Drawings: Show exploded views or detailed component assembly instructions. These are useful for technicians to understand complex subassemblies or special fittings unique to hydrocarbon systems.

Each type of drawing provides complementary information; successful installation depends on integrating all drawings into a coherent understanding of the system.

3.1.2 Key Symbols and Notations Used in Hydrocarbon RAC Drawings

Hydrocarbon RAC installation drawings use standardized symbols and notations to represent components and connections. Mastery of these symbols enables technicians to quickly interpret the drawings and avoid installation errors:

  • Refrigerant Lines: Solid lines usually represent liquid lines, while dashed lines indicate suction lines. Arrows show flow direction.
  • Valves: Symbols differ for manual, solenoid, check, and expansion valves. For example, a solenoid valve is typically a box with an internal coil symbol.
  • Compressors: Represented by a circle with internal markings indicating single or multiple stages.
  • Heat Exchangers: Condensers and evaporators are depicted as rectangles with different internal patterns to distinguish them.
  • Electrical Components: Switches, relays, and sensors have unique schematic symbols, often annotated with voltage and current ratings.
  • Safety Devices: Pressure relief valves and fusible plugs have distinct symbols indicating their protective function.

Understanding these symbols is vital because hydrocarbon refrigerants are flammable; precise identification of components ensures compliance with safety protocols and correct system operation.

3.1.3 Reading Installation Drawings for Site Adaptation

Kenyan installations often face site-specific challenges such as limited space, varying power supply quality, and climatic conditions. Installation drawings must be interpreted with these realities in mind:

  • Spatial Constraints: Layout drawings indicate space requirements; technicians must assess if existing site conditions allow for proper placement, especially ensuring adequate ventilation for hydrocarbon refrigerants.
  • Power Supply Considerations: Wiring diagrams must be reviewed for compatibility with local power standards, including voltage fluctuations common in rural areas.
  • Environmental Factors: Placement of condensers and evaporators must consider local temperature and humidity levels to optimize system performance.
  • Accessibility: Drawings should be checked for maintenance access points, ensuring components like filters and valves can be serviced without dismantling large sections.
  • Compliance with Regulations: Drawings must be cross-checked with Kenyan regulations on refrigerant handling and installation, including building codes and safety clearances.

Technicians must adapt the installation drawings pragmatically while maintaining system integrity and safety.

3.1.4 Common Challenges in Interpreting Hydrocarbon RAC Drawings

Interpreting hydrocarbon RAC installation drawings can be complex due to the specialized nature of these systems. Common challenges include:

  • Inconsistent Symbol Usage: Drawings from different manufacturers or consultants may use varying symbols, requiring technicians to cross-reference symbol legends carefully.
  • Complex Piping Routes: Multi-branch refrigeration circuits can be difficult to trace, increasing the risk of incorrect connections.
  • Electrical Circuit Complexity: Integration of safety interlocks and sensors for flammable refrigerants adds layers to wiring diagrams that can confuse less experienced technicians.
  • Language and Annotation Barriers: Drawings may contain technical terms or notes in English or other languages that require clarification.
  • Updating and Revision Tracking: Site drawings may have revisions; failure to use the latest version can lead to installation errors or safety risks.

To overcome these, Kenyan RAC technicians benefit from continuous training and collaboration with design engineers to clarify ambiguities before installation.

Practice Questions

  1. Explain the differences between schematic diagrams and layout drawings in hydrocarbon RAC system installation. (5 marks)
  2. List and describe five key symbols commonly found in hydrocarbon RAC installation drawings. (10 marks)
  3. Describe three site adaptation considerations a technician must keep in mind when interpreting installation drawings for a hydrocarbon RAC system in a Kenyan hospital. (6 marks)
  4. Identify and explain four common challenges technicians face when interpreting hydrocarbon RAC installation drawings. (8 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Hydrocarbon RAC System Installation Requirements

Installing hydrocarbon refrigeration and air conditioning systems requires adherence to specific requirements that prioritize safety, environmental protection, and system efficiency. Given the flammable nature of hydrocarbons, Kenyan technicians must observe s…

🔒3.3 Air Circulation/Ventilation Requirements

In the context of hydrocarbon RAC systems installation in Kenya, ensuring proper air circulation and ventilation is a critical safety and performance factor. Hydrocarbon refrigerants such as propane (R290) and isobutane (R600a) are highly flammable, hence the…

🔒3.4 Drain Disposal Requirements

Drain disposal in hydrocarbon refrigeration and air conditioning systems is a vital aspect that affects system hygiene, safety, and environmental compliance. Proper handling of condensate and any waste liquids ensures that refrigerant leaks do not contaminate…

🔒3.5 Power Supply Requirements

In the installation of hydrocarbon refrigeration and air conditioning (RAC) units, ensuring the correct power supply is critical for safe and efficient operation. In Kenya, where power quality and availability can vary, RAC professionals must design systems th…

🔒3.6 Wall and Floor Finishing

The finishing of walls and floors where hydrocarbon RAC units are installed plays a vital role in ensuring safety, durability, and compliance with installation standards. In Kenyan commercial and institutional settings, such as universities and retail business…

🔒3.7 Provision for serviceability

Provision for serviceability is a fundamental consideration when installing hydrocarbon refrigeration and air conditioning (RAC) systems. In Kenya’s growing commercial and industrial sectors, ensuring that RAC units can be efficiently serviced safeguards syste…

🔒3.8 User access to the unit

User access to hydrocarbon RAC units is a critical aspect that influences operational safety, system performance, and user convenience. In Kenya’s diverse commercial environments, from hotels to hospitals, ensuring that users can safely interact with their RAC…

🔒3.9 Tools, Equipment and Materials

In the installation and maintenance of hydrocarbon refrigeration and air conditioning (RAC) systems, the choice and use of appropriate tools, equipment, and materials are critical. Hydrocarbon refrigerants such as propane (R290) and isobutane (R600a) are highl…

🔒3.10 Specific Health, Safety and Environmental Requirements and Standards

In the Kenyan refrigeration and air conditioning sector, especially when working with hydrocarbon refrigerants, adherence to health, safety, and environmental standards is critical. These standards protect technicians, users, and the environment from potential…

Chapter Summary

This chapter provides a comprehensive guide to installing hydrocarbon refrigeration and air conditioning systems, starting with the critical skill of interpreting installation drawings to ensure accurate implementation. It outlines the specific installation requirements necessary for system efficiency and safety, including appropriate air circulation and ventilation to maintain optimal operating conditions. Proper drain disposal is emphasized to prevent environmental contamination, while power supply requirements are detailed to guarantee reliable and safe operation. The chapter also covers the importance of suitable wall and floor finishes to support system durability and hygiene. Provision for serviceability is addressed to facilitate maintenance and repairs, alongside ensuring user access to the unit for operational ease. Essential tools, equipment, and materials required for installation are identified, and the chapter concludes with a thorough review of health, safety, and environmental standards, referencing key regulations and codes such as those from the EPA, EMCA 2020, ASHRAE, ISO, and EN standards that govern hydrocarbon RAC systems.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of interpreting installation drawings in hydrocarbon RAC systems? (2 marks)
  2. List four key installation requirements specific to hydrocarbon refrigeration and air conditioning systems. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the importance of accurately interpreting installation drawings when installing hydrocarbon RAC systems in a commercial building such as a Nairobi hotel. (4 marks)
  2. Describe five key installation requirements specific to hydrocarbon refrigeration and air conditioning systems. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Interpret Hydrocarbon RAC System Installation Drawings

Refrigeration And Air Conditioning · Level 5
Hydrocarbon Rac Units Installation And Maintenance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Interpret the hydrocarbon RAC system installation drawing to identify and list all key components and their specifications as per the provided drawing with dimensions 1200mm x 900mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Scale ruler (metric)Hydrocarbon RAC system installation drawing
Drawing pencils (HB, 2H)Technical specification sheets for hydrocarbon RAC components
Tracing paper A3 sizeNote book
Calculator
Clipboard or drawing board
Pen and eraser
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Hydrocarbon RAC system installation drawing1 Set per Candidate
2Scale ruler (metric)1 Pc per Candidate
3Drawing pencils (HB, 2H)1 Set per Candidate
4Tracing paper A3 size5 Sheets per Candidate
5Calculator1 Pc per Candidate
6Clipboard or drawing board1 Pc per Candidate
7Note book1 Pc per Candidate
8Technical specification sheets for hydrocarbon RAC components1 Set per Candidate
9Pen and eraser1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Interpretation of Installation Drawing
Wore appropriate PPE: dust coat/overall, safety boots, gloves, safety goggles
(Award 1 mark for correct PPE or zero)
1
Handled tools and drawing materials correctly and safely
(Award 1 mark for correct use of tools and 1 mark for safe handling)
2
Identified all key hydrocarbon RAC components on the drawing (compressor, condenser, evaporator, expansion device, piping, valves)
(Award 1 mark per correctly identified component x 4)
4
Noted all specified dimensions and pipe sizes accurately from the drawing
(Award 1 mark each for length, width, and pipe size accuracy)
3
Recorded specifications such as refrigerant type, operating pressure, and safety requirements as per drawing notes
(Award 1 mark each for refrigerant, pressure, safety notes)
3
Produced a clear and concise list of components and specifications in the notebook
(Award 2 marks for completeness and clarity or zero)
2
Sub-Total15
PRODUCT CHECKLIST
Accurate and complete list of hydrocarbon RAC components matching the drawing
(Award up to 5 marks for accuracy and completeness)
5
Correct recording of all relevant dimensions (1200mm x 900mm and pipe sizes) as per drawing
(Award up to 5 marks for dimension accuracy)
5
Correct identification and notation of refrigerant type and operating pressures
(Award up to 3 marks for correct identification)
3
Neatness and professionalism of the recorded information
(Award 2 marks for neat and professional presentation)
2
Sub-Total15
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Prepare Installation Site for Hydrocarbon RAC System

Refrigeration And Air Conditioning · Level 5
Hydrocarbon Rac Units Installation And Maintenance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare and finish a 3 m x 2.5 m wall section and adjacent 2.5 m x 2 m floor area for hydrocarbon RAC installation as per installation requirements.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring tapeMasonry filler compound
Spirit levelWall finishing paint
Hand brushFloor sealant
Putty knifeCleaning detergent
Cleaning cloths
Sandpaper
Masking tape
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring tape1 Pc per Candidate
2Spirit level1 Pc per Candidate
3Hand brush1 Pc per Candidate
4Putty knife1 Pc per Candidate
5Cleaning cloths3 Pcs per Candidate
6Sandpaper (medium grit)5 Sheets per Candidate
7Masonry filler compound1 Kg per Candidate
8Protective gloves1 Pair per Candidate
9Dust coat/overall1 Pc per Candidate
10Safety boots1 Pair per Candidate
11Safety goggles1 Pc per Candidate
12Wall finishing paint (white, water-based)1 Litre per Candidate
13Floor sealant (clear acrylic)1 Litre per Candidate
14Masking tape1 Roll per Candidate
15Bucket with clean water1 Pc per Candidate
16Cleaning detergent500 ml per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Safety and PPE Compliance
Wore dust coat/overall, safety boots, gloves, and safety goggles prior to work
(Award 1 mark for correct PPE use or zero)
1
Handled tools and materials safely according to standard procedures
(Award 1 mark for safe handling or zero)
1
Sub-Total2
TASK 2: Site Preparation
Measured and marked the 3 m x 2.5 m wall section and 2.5 m x 2 m floor area accurately
(Award 1 mark for each accurate measurement or zero)
2
Cleaned the wall and floor surfaces thoroughly using detergent and water
(Award 1 mark for thorough cleaning or zero)
1
Removed dust, loose particles, and debris from the surfaces
(Award 1 mark for effective removal or zero)
1
Sub-Total4
TASK 3: Wall and Floor Finishing
Applied masonry filler compound to wall cracks and imperfections using putty knife
(Award 1 mark for correct application and 1 mark for smooth finish or zero)
2
Sanded the filled areas after drying to a smooth finish
(Award 1 mark for smooth sanding or zero)
1
Applied masking tape neatly to protect adjacent surfaces
(Award 1 mark for neat masking or zero)
1
Painted the wall section evenly with water-based finishing paint
(Award 2 marks for even coverage and no drips or zero)
2
Applied floor sealant evenly on the designated floor area
(Award 2 marks for uniform sealant application and no pooling or zero)
2
Sub-Total8
TASK 4: Provision for Serviceability
Ensured wall finishing allows for easy access to service valves and piping
(Award 1 mark for correct provision or zero)
1
Ensured floor sealant application allows for easy cleaning and maintenance
(Award 1 mark for correct provision or zero)
1
Sub-Total2
TASK 5: Housekeeping
Cleaned and stored tools and materials appropriately after completion
(Award 1 mark for proper housekeeping or zero)
1
Disposed of waste materials as per workplace health and safety standards
(Award 1 mark for proper waste disposal or zero)
1
Sub-Total2
PRODUCT CHECKLIST
Wall section prepared is 3000 mm length x 2500 mm height, smooth and evenly finished with no visible cracks or defects
(Award 3 marks for compliance with dimensions and finish or zero)
3
Floor area prepared is 2500 mm length x 2000 mm width with uniformly applied sealant and no pooling
(Award 3 marks for compliance with dimensions and finish or zero)
3
Provision for future serviceability is evident with accessible areas and durable finishes
(Award 2 marks for clear provision or zero)
2
Sub-Total8
GRAND TOTAL26
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Installation of Air Circulation and Ventilation System for Hydrocarbon RAC UnitPractical 3
🔒Set up drain disposal system for hydrocarbon RAC unitPractical 4
🔒Establish Electrical Power Supply Connections for Hydrocarbon RAC UnitPractical 5
🔒Installation and Configuration of User Access Features for Hydrocarbon RAC UnitPractical 6
🔒Apply Health, Safety and Environmental Standards during Hydrocarbon RAC System InstallationPractical 7
🔒Install Hydrocarbon RAC System Ensuring EPA CompliancePractical 8
🔒Apply EMCA 2020 Environmental Regulations During Hydrocarbon RAC System InstallationPractical 9
🔒Installation of Hydrocarbon RAC System Complying with ASHRAE StandardsPractical 10
🔒Installation of a Hydrocarbon RAC System Compliant with ISO 22172 StandardsPractical 11
🔒Installation of Hydrocarbon RAC System Components in Compliance with EN 378 StandardsPractical 12
🔒Installation of Hydrocarbon RAC System Complying with ISO 5149 StandardsPractical 13
🔒Installation of Hydrocarbon RAC Unit Following EN 13313 GuidelinesPractical 14
🔒Gather and Prepare Tools, Equipment and Materials for Hydrocarbon RAC System InstallationPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Identify the correct hydrocarbon RAC unit to install by following workplace procedures.
  • Follow health, safety, and environmental rules, including EPA, EMCA 2020, ASHRAE, ISO, and EN standards, to keep yourself and others safe.
  • Choose the right tools, equipment, and materials needed for installing hydrocarbon RAC units.
  • Install the hydrocarbon RAC unit accurately by carefully following the manufacturer’s instructions.
  • Perform lubrication and charging of the unit safely and correctly according to workplace procedures.
  • Select the appropriate insulation materials based on the specific task requirements.
  • Apply pipe insulation properly to ensure efficient system performance.
  • Maintain a clean and safe work area by doing proper housekeeping in line with environmental laws and workplace rules.
  • Prepare clear and accurate installation reports that document your work professionally.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.