By the end of this chapter, you will be able to:
Mastering these skills will help you produce reliable and professional bills of quantities, which are essential for successful civil works projects in the real world.
Billing paper or billing sheet is a crucial document in the measurement and valuation process of civil works. It serves as the working sheet where quantities extracted from the drawings and site measurements are recorded before being transferred to the final bill of quantities. Accurate preparation and transfer of quantities ensure correctness in valuation and billing, which is essential for fair payment and contract management in Kenyan construction projects. The price bill of quantities consolidates these measurements with rates and prices to produce the final cost estimate for payment.
The preparation of billing sheets involves setting out a clear format that captures all relevant measurement information systematically. The billing sheet must be designed to avoid errors, facilitate easy transfer, and maintain traceability of quantities.
A billing sheet for excavation might list the trench length, width, and depth measured on site, then calculate volume by multiplying these to give cubic meters. This quantity is then transferred to the bill of quantities for valuation.
Example 1: Linear Measurement Sheet (Kenya Power cable installation)
$$ \text{Quantity} = 120\, \text{m} $$
Answer: 120 m
Example 2: Area Measurement Sheet (Plastering wall at Kenyatta National Hospital)
$$ \text{Quantity} = 15\, \text{m} \times 3\, \text{m} = 45\, \text{m}^2 $$
Answer: 45 m²
Example 3: Volume Measurement Sheet (Concrete for foundation at Nairobi Expressway)
$$ \text{Quantity} = 10\, \text{m} \times 2.5\, \text{m} \times 0.2\, \text{m} = 5\, \text{m}^3 $$
Answer: 5 m³
The transfer of booked quantities from billing sheets to the formal bill of quantities is a critical step in the measurement process. Accuracy and consistency during this transfer determine the reliability of the final valuation.
The price bill of quantities combines the measured quantities with unit rates and prices to determine the value of work done. This document forms the basis for valuation, payment certification, and cost control.
The amount for each item is calculated using the formula:
Amount = Quantity × Rate
This calculation must be done accurately to ensure correct valuation.
Price bills are submitted with payment applications to clients, contractors, and project managers. They provide a transparent basis for interim payments, variations, and final accounts. Proper preparation ensures timely payments and minimizes disputes.
Example: Concrete slab for Moi University lecture hall
Formula:$$ \text{Amount} = \text{Quantity} \times \text{Rate} $$
Substitution:$$ \text{Amount} = 25 \times 8,700 = 217,500\, \text{Ksh} $$
Answer: Ksh 217,500
Prepare a billing sheet for a concrete slab measuring 5 m by 4 m with thickness 0.15 m. Calculate the volume in cubic meters. (5 marks)
Transfer the following booked quantities to a bill of quantities: excavation 12 m³, wall plastering 20 m², and painting 30 m². Ensure units and item descriptions are consistent. (5 marks)
Given a quantity of 50 m² for floor tiling at a rate of Ksh 1200 per m², calculate the total amount for the price bill. (5 marks)
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the process of preparing and managing bill measured quantities in civil works. It began with the preparation of the billing sheet or paper, detailing how quantities are accurately recorded and organized for billing purposes. The transfer of these booked quantities was then discussed, emphasizing the importance of precise data movement to maintain consistency. Next, the chapter covered the price bill of quantities, explaining how costs are assigned to measured works for financial assessment. Advancements in technology were highlighted, starting with Building Information Modeling, which enhances project visualization and quantity extraction. Cloud-based collaboration platforms were described as tools for real-time communication and data sharing among project stakeholders. The role of Artificial Intelligence and Machine Learning in automating measurements and improving accuracy was examined, followed by the impact of mobile technology in enabling on-site data capture and immediate updates. Together, these topics provide a comprehensive understanding of modern practices in measuring and billing civil engineering works.
A billing sheet records 120 m³ of concrete poured for a foundation. If the unit rate for concrete is Ksh 8,500 per m³, calculate the total cost for this item. (2 marks)
A quantity surveyor transfers 250 m² of wall plastering from the booked quantities to the billing sheet. If the plastering rate is Ksh 450 per m², find the total value of plastering work to be billed. (2 marks)
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Billing Sheet Paper (A4 size) |
| Calculator | Project Data Sheet with Item Descriptions and Quantities |
| Pens |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Calculator | 1 Pc per Candidate |
| 3 | Billing Sheet Paper (A4 size) | 2 Sheets per Candidate |
| 4 | Pens | 1 Pc per Candidate |
| 5 | Project Data Sheet with Item Descriptions and Quantities | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: PREPARATION OF BILLING SHEET | |||
| Identified and used appropriate PPE according to site safety regulations (Award 1 mark for each correctly used PPE item: helmet, boots, reflective vest) | 3 | ||
| Assembled all necessary tools and materials before starting work (Award 2 marks for assembling all required tools and materials) | 2 | ||
| Accurately read and interpreted project data including item descriptions and quantities (Award 1 mark for each correctly interpreted item, total 5 items) | 5 | ||
| Measured and verified dimensions on the project data using measuring tape (Award 1 mark for each correctly verified dimension: footing length, width, thickness; slab length, width, thickness) | 4 | ||
| Calculated quantities correctly for each item (volume, area as appropriate) (Award 2 marks for each correctly calculated quantity: footing concrete volume, footing excavation volume, slab concrete volume) | 6 | ||
| Entered all quantities and descriptions accurately into the billing sheet (Award 1 mark for each correctly entered item, total 5 items) | 5 | ||
| Checked the billing sheet for arithmetic and transcription errors (Award 3 marks for thorough checking and correction of errors) | 3 | ||
| Sub-Total | 28 | ||
| PRODUCT CHECKLIST | |||
| Billing sheet shows accurate and complete item descriptions matching project data (Award 1 mark for each correct item description, total 5) | 5 | ||
| Measured quantities match calculated values within ±2% tolerance (Award 7 marks for all quantities within tolerance) | 7 | ||
| Billing sheet is neatly presented, legible, and professionally formatted (Award 5 marks for neatness and clear presentation) | 5 | ||
| Sub-Total | 17 | ||
| GRAND TOTAL | 45 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Billing Sheet (printed form) |
| Field Book/Measurement Book | |
| Calculator | |
| Ruler (30cm) | |
| Pens (black and red ink) | |
| Clipboard or Writing Board |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Field Book/Measurement Book | 1 Pc per Candidate |
| 3 | Billing Sheet (printed form) | 1 Pc per Candidate |
| 4 | Pens (black and red ink) | 2 Pcs per Candidate |
| 5 | Calculator | 1 Pc per Candidate |
| 6 | Clipboard or Writing Board | 1 Pc per Candidate |
| 7 | Ruler (30cm) | 1 Pc per Candidate |
| 8 | PPE: Helmet, Safety Boots, Reflective Vest | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: PREPARATION AND SAFETY | |||
| Identified and used appropriate PPEs including helmet, safety boots and reflective vest (Award 1 mark for each PPE donned as per workplace safety regulations) | 3 | ||
| Assembled all required tools and materials before starting the transfer (Award 1/2 mark for each correctly assembled tool/material, max 2 marks) | 2 | ||
| Sub-Total | 5 | ||
| TASK 2: TRANSFER OF QUANTITIES | |||
| Carefully read and interpreted measured quantities from the field book (Award 1 mark for each correctly interpreted item, max 3 marks) | 3 | ||
| Entered quantities into the correct sections of the billing sheet without omissions (Award 1 mark for each correct section filled, max 4 marks) | 4 | ||
| Performed accurate calculations for totals and subtotals using the calculator (Award 1 mark for each correct calculation, max 3 marks) | 3 | ||
| Used correct units and decimal points consistently (Award 1 mark for consistent units and 1 mark for correct decimals) | 2 | ||
| Sub-Total | 12 | ||
| TASK 3: REVIEW AND PRESENTATION | |||
| Cross-checked transferred quantities against the field book for accuracy (Award 1 mark for each cross-check step performed, max 3 marks) | 3 | ||
| Presented the billing sheet neatly with clear handwriting and no erasures (Award 2 marks for neat, legible and error-free presentation) | 2 | ||
| Properly stored all tools and materials after completion (Award 1 mark each for cleaning and proper storage) | 2 | ||
| Sub-Total | 7 | ||
| PRODUCT CHECKLIST | |||
| Quantities accurately transferred matching the field book data (within ±0.5% tolerance) (Award full marks for 100% accuracy, 4 marks for 75%, 2 marks for 50%) | 8 | ||
| Billing sheet correctly formatted with all required items completed (Award 2 marks for completeness, 2 marks for correct formatting) | 4 | ||
| Final billing sheet free from calculation errors and legible (Award 2 marks for no errors, 2 marks for legibility and neatness) | 4 | ||
| Sub-Total | 16 | ||
| GRAND TOTAL | 40 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.