Quantity Survey  ·  Level 6
Measurement Of Civil Works
Chapter 5: Bill measured Quantities
📚 2 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • prepare billing paper correctly using the standard format
  • transfer abstracted quantities and their descriptions accurately according to standard operating procedures
  • carry out casting up correctly following standard operating procedures
  • price the bill of quantities accurately as per standard operating procedures

Mastering these skills will help you produce reliable and professional bills of quantities, which are essential for successful civil works projects in the real world.

Billing paper or billing sheet is a crucial document in the measurement and valuation process of civil works. It serves as the working sheet where quantities extracted from the drawings and site measurements are recorded before being transferred to the final bill of quantities. Accurate preparation and transfer of quantities ensure correctness in valuation and billing, which is essential for fair payment and contract management in Kenyan construction projects. The price bill of quantities consolidates these measurements with rates and prices to produce the final cost estimate for payment.

5.1 Billing paper/sheet

5.1.1 Preparation of billing sheet/paper

The preparation of billing sheets involves setting out a clear format that captures all relevant measurement information systematically. The billing sheet must be designed to avoid errors, facilitate easy transfer, and maintain traceability of quantities.

Key elements of billing sheet format

  • Description column: Records the item descriptions exactly as given in the bill of quantities or specifications to avoid ambiguity.
  • Measurement column: Records the measured dimensions or counts from site or drawings, ensuring units are consistent.
  • Calculation column: Shows the calculation process from raw measurements to quantities (e.g., length × breadth × depth).
  • Quantity column: The final computed quantity for each item.
  • Remarks column: Notes any observations, variations, or assumptions made during measurement.

Steps in preparing a billing sheet

  1. Identify the item: Start by clearly stating the work item or element to be measured as per the bill of quantities.
  2. Record measurements: Enter the measured dimensions or counts obtained from site measurement or drawings.
  3. Calculate quantities: Perform the necessary calculations to convert measurements into quantities.
  4. Check units: Ensure all measurements and quantities use consistent units (e.g., meters, square meters).
  5. Enter quantities: Record the final quantities in the quantity column.
  6. Note remarks: Add any relevant comments, such as deviations or provisional quantities.

Common formats used in Kenya

  • Linear measurement sheets: For items measured by length (e.g., pipes, cables).
  • Area measurement sheets: For surface items like plastering or flooring.
  • Volume measurement sheets: For concrete or excavation.

Example:

A billing sheet for excavation might list the trench length, width, and depth measured on site, then calculate volume by multiplying these to give cubic meters. This quantity is then transferred to the bill of quantities for valuation.

Worked Examples for Billing Sheet Preparation

Example 1: Linear Measurement Sheet (Kenya Power cable installation)

  • Description: Installation of underground cable for Kenya Power Ltd.
  • Measured length: 120 m
  • Calculation: Quantity = Length

$$ \text{Quantity} = 120\, \text{m} $$

Answer: 120 m


Example 2: Area Measurement Sheet (Plastering wall at Kenyatta National Hospital)

  • Description: Wall plastering at Kenyatta National Hospital
  • Measured length: 15 m
  • Measured height: 3 m
  • Calculation: Quantity = Length × Height

$$ \text{Quantity} = 15\, \text{m} \times 3\, \text{m} = 45\, \text{m}^2 $$

Answer: 45 m²


Example 3: Volume Measurement Sheet (Concrete for foundation at Nairobi Expressway)

  • Description: Concrete foundation for Nairobi Expressway
  • Measured length: 10 m
  • Measured width: 2.5 m
  • Measured depth: 0.2 m
  • Calculation: Quantity = Length × Width × Depth

$$ \text{Quantity} = 10\, \text{m} \times 2.5\, \text{m} \times 0.2\, \text{m} = 5\, \text{m}^3 $$

Answer: 5 m³

5.1.2 Transfer of booked quantities

The transfer of booked quantities from billing sheets to the formal bill of quantities is a critical step in the measurement process. Accuracy and consistency during this transfer determine the reliability of the final valuation.

Principles of transferring booked quantities

  • Verification: Cross-check quantities on billing sheets against original measurements and drawings.
  • Consistency: Ensure descriptions and units match those in the bill of quantities.
  • Accuracy: Transfer quantities without rounding errors or omissions.
  • Traceability: Maintain references to the source billing sheet for audit purposes.
  • Documentation: Use clear handwriting or digital entries to avoid misinterpretation.

Procedure for transferring quantities

  1. Review billing sheets: Confirm all quantities are correctly calculated and recorded.
  2. Match items: Identify corresponding items in the bill of quantities.
  3. Transfer quantities: Enter the quantities from the billing sheet into the bill of quantities.
  4. Check units: Confirm that units in the bill of quantities align with those on the billing sheet.
  5. Verify totals: Add up quantities where necessary to ensure totals are correct.
  6. File records: Keep copies of billing sheets linked to the bill of quantities for future reference.

Challenges in quantity transfer

  • Misreading handwriting or unclear entries.
  • Unit mismatches between billing sheets and bill of quantities.
  • Omissions or duplication of quantities.
  • Lack of proper referencing leading to audit difficulties.

5.1.3 Price bill of quantities

The price bill of quantities combines the measured quantities with unit rates and prices to determine the value of work done. This document forms the basis for valuation, payment certification, and cost control.

Components of price bill of quantities

  • Description: The item description as per the bill of quantities.
  • Quantity: The measured quantity transferred from billing sheets.
  • Unit: The measurement unit (e.g., m, m², m³).
  • Rate: The agreed unit rate or price for the item.
  • Amount: The total amount calculated by multiplying quantity by rate.

Calculating the amount

The amount for each item is calculated using the formula:

Amount = Quantity × Rate

This calculation must be done accurately to ensure correct valuation.

Steps in preparing a price bill of quantities

  1. List items: Arrange all items for valuation in the order of the bill of quantities.
  2. Enter quantities: Transfer measured quantities from billing sheets.
  3. Insert rates: Apply unit rates agreed in the contract or tender.
  4. Calculate amounts: Multiply quantities by rates to get item amounts.
  5. Sum totals: Add all item amounts to get the total value of work done.
  6. Review: Check for arithmetic accuracy and consistency.

Use of price bills in Kenyan construction

Price bills are submitted with payment applications to clients, contractors, and project managers. They provide a transparent basis for interim payments, variations, and final accounts. Proper preparation ensures timely payments and minimizes disputes.

Worked Example: Calculating Amount in Price Bill of Quantities

Example: Concrete slab for Moi University lecture hall

  • Description: Concrete slab
  • Quantity: 25 m³ (from billing sheet)
  • Unit: m³
  • Rate: Ksh 8,700 per m³ (contract rate)

Formula:$$ \text{Amount} = \text{Quantity} \times \text{Rate} $$

Substitution:$$ \text{Amount} = 25 \times 8,700 = 217,500\, \text{Ksh} $$

Answer: Ksh 217,500

Practice Questions

  1. Prepare a billing sheet for a concrete slab measuring 5 m by 4 m with thickness 0.15 m. Calculate the volume in cubic meters. (5 marks)

  2. Transfer the following booked quantities to a bill of quantities: excavation 12 m³, wall plastering 20 m², and painting 30 m². Ensure units and item descriptions are consistent. (5 marks)

  3. Given a quantity of 50 m² for floor tiling at a rate of Ksh 1200 per m², calculate the total amount for the price bill. (5 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒5.2 Emerging technologies

Emerging technologies are transforming the practice of quantity surveying in Kenya by improving accuracy, efficiency, and collaboration in measuring civil works. These innovations help quantity surveyors manage complex projects, reduce errors, and deliver prec…

Chapter Summary

This chapter explored the process of preparing and managing bill measured quantities in civil works. It began with the preparation of the billing sheet or paper, detailing how quantities are accurately recorded and organized for billing purposes. The transfer of these booked quantities was then discussed, emphasizing the importance of precise data movement to maintain consistency. Next, the chapter covered the price bill of quantities, explaining how costs are assigned to measured works for financial assessment. Advancements in technology were highlighted, starting with Building Information Modeling, which enhances project visualization and quantity extraction. Cloud-based collaboration platforms were described as tools for real-time communication and data sharing among project stakeholders. The role of Artificial Intelligence and Machine Learning in automating measurements and improving accuracy was examined, followed by the impact of mobile technology in enabling on-site data capture and immediate updates. Together, these topics provide a comprehensive understanding of modern practices in measuring and billing civil engineering works.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A billing sheet records 120 m³ of concrete poured for a foundation. If the unit rate for concrete is Ksh 8,500 per m³, calculate the total cost for this item. (2 marks)

  2. A quantity surveyor transfers 250 m² of wall plastering from the booked quantities to the billing sheet. If the plastering rate is Ksh 450 per m², find the total value of plastering work to be billed. (2 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe the main purpose of a billing sheet in the preparation of a bill of quantities for a road construction project in Kisumu County. (4 marks)
  2. Explain the process of transferring booked quantities from field measurement sheets to the billing paper during a building construction project. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Preparation of Billing Sheet for Civil Works Quantities

Quantity Survey · Level 6
Measurement Of Civil Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a billing sheet detailing measured quantities of concrete footing 1500mm x 1500mm x 300mm thick and reinforced concrete slab 4000mm x 3000mm x 150mm thick as per given project data.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing Sheet Paper (A4 size)
CalculatorProject Data Sheet with Item Descriptions and Quantities
Pens
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Calculator1 Pc per Candidate
3Billing Sheet Paper (A4 size)2 Sheets per Candidate
4Pens1 Pc per Candidate
5Project Data Sheet with Item Descriptions and Quantities1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION OF BILLING SHEET
Identified and used appropriate PPE according to site safety regulations
(Award 1 mark for each correctly used PPE item: helmet, boots, reflective vest)
3
Assembled all necessary tools and materials before starting work
(Award 2 marks for assembling all required tools and materials)
2
Accurately read and interpreted project data including item descriptions and quantities
(Award 1 mark for each correctly interpreted item, total 5 items)
5
Measured and verified dimensions on the project data using measuring tape
(Award 1 mark for each correctly verified dimension: footing length, width, thickness; slab length, width, thickness)
4
Calculated quantities correctly for each item (volume, area as appropriate)
(Award 2 marks for each correctly calculated quantity: footing concrete volume, footing excavation volume, slab concrete volume)
6
Entered all quantities and descriptions accurately into the billing sheet
(Award 1 mark for each correctly entered item, total 5 items)
5
Checked the billing sheet for arithmetic and transcription errors
(Award 3 marks for thorough checking and correction of errors)
3
Sub-Total28
PRODUCT CHECKLIST
Billing sheet shows accurate and complete item descriptions matching project data
(Award 1 mark for each correct item description, total 5)
5
Measured quantities match calculated values within ±2% tolerance
(Award 7 marks for all quantities within tolerance)
7
Billing sheet is neatly presented, legible, and professionally formatted
(Award 5 marks for neatness and clear presentation)
5
Sub-Total17
GRAND TOTAL45
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Transfer of Measured Quantities to Billing Sheet

Quantity Survey · Level 6
Measurement Of Civil Works
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Transfer the measured quantities of earthworks and concrete works from the field book to the billing sheet accurately as per the provided field data.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing Sheet (printed form)
Field Book/Measurement Book
Calculator
Ruler (30cm)
Pens (black and red ink)
Clipboard or Writing Board
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Field Book/Measurement Book1 Pc per Candidate
3Billing Sheet (printed form)1 Pc per Candidate
4Pens (black and red ink)2 Pcs per Candidate
5Calculator1 Pc per Candidate
6Clipboard or Writing Board1 Pc per Candidate
7Ruler (30cm)1 Pc per Candidate
8PPE: Helmet, Safety Boots, Reflective Vest1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION AND SAFETY
Identified and used appropriate PPEs including helmet, safety boots and reflective vest
(Award 1 mark for each PPE donned as per workplace safety regulations)
3
Assembled all required tools and materials before starting the transfer
(Award 1/2 mark for each correctly assembled tool/material, max 2 marks)
2
Sub-Total5
TASK 2: TRANSFER OF QUANTITIES
Carefully read and interpreted measured quantities from the field book
(Award 1 mark for each correctly interpreted item, max 3 marks)
3
Entered quantities into the correct sections of the billing sheet without omissions
(Award 1 mark for each correct section filled, max 4 marks)
4
Performed accurate calculations for totals and subtotals using the calculator
(Award 1 mark for each correct calculation, max 3 marks)
3
Used correct units and decimal points consistently
(Award 1 mark for consistent units and 1 mark for correct decimals)
2
Sub-Total12
TASK 3: REVIEW AND PRESENTATION
Cross-checked transferred quantities against the field book for accuracy
(Award 1 mark for each cross-check step performed, max 3 marks)
3
Presented the billing sheet neatly with clear handwriting and no erasures
(Award 2 marks for neat, legible and error-free presentation)
2
Properly stored all tools and materials after completion
(Award 1 mark each for cleaning and proper storage)
2
Sub-Total7
PRODUCT CHECKLIST
Quantities accurately transferred matching the field book data (within ±0.5% tolerance)
(Award full marks for 100% accuracy, 4 marks for 75%, 2 marks for 50%)
8
Billing sheet correctly formatted with all required items completed
(Award 2 marks for completeness, 2 marks for correct formatting)
4
Final billing sheet free from calculation errors and legible
(Award 2 marks for no errors, 2 marks for legibility and neatness)
4
Sub-Total16
GRAND TOTAL40
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Pricing Bill of Quantities for a Reinforced Concrete BeamPractical 3
🔒Quantity Takeoff Using BIM for a 4m x 3m x 3m Reinforced Concrete BeamPractical 4
🔒Collaborative Billing Document Management Using Cloud PlatformPractical 5
🔒Automation of Quantity Extraction Using AI-Enabled SoftwarePractical 6
🔒Onsite Quantity Measurement and Real-Time Billing Update Using Mobile TechnologyPractical 7
🔒Consolidate and Price Bill of Quantities for a Small Building ProjectPractical 8
🔒Manual Calculation and Verification of Bill of Quantities for a Concrete BeamPractical 9
🔒Integration of BIM, AI, Cloud, and Mobile Tech in Bill Measurement for Civil WorksPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 17 questions Start quiz ▾
0%
0 / 2
🔒

15 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • prepare billing paper correctly using the standard format
  • transfer abstracted quantities and their descriptions accurately according to standard operating procedures
  • carry out casting up correctly following standard operating procedures
  • price the bill of quantities accurately as per standard operating procedures

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.