Quantity Survey  ·  Level 6
Estimation And Costing Works
Chapter 1: Carry out Approximate Estimating
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • accurately analyze project information to meet client requirements.
  • choose the right approximate estimating method based on the project type and available data.
  • calculate preliminary estimates using measured quantities and correct rates.
  • apply the Storey Enclosure method correctly to estimate project costs.
  • use the Approximate Quantitative Method effectively for estimation.

Mastering these skills will help you provide reliable cost estimates that keep projects on track and clients satisfied.

Approximate estimating is a crucial preliminary step for quantity surveyors in Kenya when preparing early project cost indications before detailed designs are available. It enables timely budget decisions and feasibility assessments for clients such as county government offices, hospitals, or retail businesses. This chapter focuses on interpreting client data and applying various approximate estimating methods to produce reliable early cost estimates, balancing accuracy with speed.

1.1 Analyzing client data

Analyzing data provided by the client is the first essential step in approximate estimating. Quantity surveyors must interpret all relevant information to understand project scope and constraints, enabling appropriate selection of estimating methods. Kenyan clients often provide varied data quality, so careful assessment is vital to avoid costly errors.

1.1.1 Understanding project scope from client data

Project scope defines the work boundaries and deliverables.

  • Review project description: Identify building type, size, and intended use from client briefs or proposals.
  • Identify key requirements: Note special features such as accessibility, sustainability goals, or security needs impacting costs.
  • Clarify exclusions: Determine which items or works are not included to avoid scope creep during estimating.
  • Assess client’s budget expectations: Early cost indications help tailor estimates to client affordability limits.
  • Verify data completeness: Incomplete or ambiguous data require follow-up to prevent guesswork.

1.1.2 Extracting dimensional data

  • Collect architectural drawings: Floor plans, elevations, and sections provide length, width, height data.
  • Use site survey reports: Confirm existing site conditions and topography affecting building volume or footprint.
  • Identify number of storeys: Essential for methods like storey enclosure or cubic methods.
  • Check for standard unit sizes: For example, typical classroom sizes in schools or hospital wards.
  • Convert units as needed: Ensure all data are in consistent units, usually metric (metres).

1.1.3 Identifying client priorities and constraints

Client priorities influence estimating focus and accuracy levels.

  • Budget constraints: Tight budgets require more approximate, less detailed estimates.
  • Time constraints: Fast estimates are prioritized for early decision-making phases.
  • Quality expectations: Higher quality or standards may increase cost allowances.
  • Phasing requirements: Multi-phase projects may require separate estimates per phase.
  • Regulatory compliance: Ensure estimates consider Kenyan building codes or NEMA guidelines.

1.1.4 Data validation and risk assessment

Validating data quality reduces estimation risks.

  • Cross-check data sources: Compare client data against similar past projects or industry benchmarks.
  • Assess data reliability: Recognize assumptions or estimates provided by clients themselves.
  • Identify missing data: Highlight gaps needing estimation or client clarification.
  • Consider site constraints: Access, soil conditions, or environmental factors may affect costs.
  • Estimate contingencies: Include allowances for uncertainties in early estimates.

Practice Questions

  1. A client provides floor plans showing a building footprint of 600 m² and 3 storeys. Identify the key dimensional data needed for approximate estimating. (5 marks)
  2. Given incomplete client data, list the steps you would take to validate and supplement the information before starting an estimate. (6 marks)
  3. A hospital client prioritizes a tight budget but requires phased construction. How would these constraints affect your approach to approximate estimating? (5 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Methods of Approximate Estimating advantages and limitations

Approximate estimating methods vary in complexity, accuracy, and data requirements. Kenyan quantity surveyors must select methods suited to the project phase and available data. Understanding each method’s strengths and weaknesses ensures better cost control i…

🔒1.3 Calculating Preliminary Estimate

Preliminary estimating is a critical phase in quantity surveying, especially in the Kenyan construction industry where early project decisions hinge on reliable cost approximations. This type of estimate provides a broad financial scope before detailed designs…

Chapter Summary

This chapter focused on the process of carrying out approximate estimating in construction projects. It began with analyzing client data to understand project requirements and constraints, which is crucial for accurate preliminary estimation. Various methods of approximate estimating were then explored, including the superficial floor area method, functional unit method, cubic method, storey enclosure method, and approximate quantitative method, each with its own advantages and limitations depending on the project context. The superficial floor area method estimates costs based on the floor area, while the functional unit method relates costs to specific building functions. The cubic method involves calculating the volume of the building, and the storey enclosure method focuses on the external envelope of each floor. The approximate quantitative method uses rough quantities of materials and labour for estimation. Finally, the chapter demonstrated how to calculate a preliminary estimate by applying these methods effectively to provide a reliable cost projection early in the project planning stage.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A client provides the floor plan data for a single-storey office building with a total floor area of 500 m². Using the superficial floor area method, estimate the approximate cost if the average rate per m² is Ksh 45,000. (3 marks)

  2. A residential block has 3 functional units, each estimated at Ksh 3,200,000. Using the functional unit method, calculate the total approximate cost for the block. (3 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. A client provides data for a proposed residential building with a total floor area of 400 m². Using the superficial floor area method, estimate the approximate cost if the average rate is Ksh 25,000 per m². (4 marks)
  2. Explain two advantages and two limitations of the functional unit method in approximate estimating. (4 marks)
🔒18 more in this section.
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 16 questions Start quiz ▾
0%
0 / 2
🔒

14 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • accurately analyze project information to meet client requirements.
  • choose the right approximate estimating method based on the project type and available data.
  • calculate preliminary estimates using measured quantities and correct rates.
  • apply the Storey Enclosure method correctly to estimate project costs.
  • use the Approximate Quantitative Method effectively for estimation.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.