Quantity Survey  ·  Level 6
Measurement Of Building Works III
Chapter 5: Bill measured Quantities
📚 2 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Prepare billing paper correctly using the standard format.
  • Transfer abstracted quantities and their descriptions accurately following standard procedures.
  • Carry out casting up correctly according to standard operating procedures.
  • Price the bill of quantities accurately following the correct methods.

Mastering these skills ensures you can manage building project costs effectively, which is essential for successful construction work and career growth in the trade.

Measurement of building works requires precise recording and verification of quantities to ensure accurate billing and cost control. In Quantity Surveying practice in Kenya, the bill measured quantities form the foundation for preparing valuation documents and assessing work progress. This chapter focuses on the preparation of billing sheets or papers, the transfer of booked quantities, and the compilation of price bills of quantities. Mastery of these processes enables Quantity Surveyors to produce reliable interim payment certificates and final accounts compliant with contract requirements.

5.1 Billing paper/sheet

In Kenyan Quantity Surveying practice, the billing paper or sheet is the fundamental document used to record measured quantities for valuation of work done. It serves as the intermediary between the site measurements and the formal bill of quantities or valuation summary. Proper preparation and management of billing sheets ensure transparency, accuracy, and traceability in the measurement and payment process.

5.1.1 Preparation of billing sheet/paper quantities

The preparation of billing sheets involves systematic recording of quantities measured on site, organized by work sections or items. This ensures clarity and ease of reference during valuation and payment stages.

The governing principle is to maintain consistency and accuracy between the billing sheets and the original bill of quantities.

Worked Examples

Example 1: A Quantity Surveyor measures 50 m² of plastering on walls for a hospital project. Prepare the billing sheet entry for this item.

Given: Measured plastering area = 50 m²

Step 1: Identify the item description: Wall plastering

Step 2: Record the quantity measured: 50 m²

Step 3: Confirm unit matches bill of quantities: m²

Answer: Billing sheet entry: Wall plastering, Quantity: 50 m²


Example 2: On a school renovation project, 120 linear meters of timber skirting has been installed. Prepare the billing sheet entry.

Given: Measured timber skirting length = 120 m

Step 1: Item description: Timber skirting

Step 2: Quantity measured: 120 m

Step 3: Unit check: linear meters (m)

Answer: Billing sheet entry: Timber skirting, Quantity: 120 m


Example 3: A hotel construction has completed 30 cubic meters of concrete foundation. Prepare the billing sheet quantity.

Given: Concrete foundation volume = 30 m³

Step 1: Item: Concrete foundation

Step 2: Quantity: 30 m³

Step 3: Unit: cubic meters (m³)

Answer: Billing sheet entry: Concrete foundation, Quantity: 30 m³


Example 4: For a bank building, 200 m² of floor tiles have been laid. Prepare the billing sheet.

Given: Floor tiles area = 200 m²

Step 1: Item: Floor tiles

Step 2: Quantity: 200 m²

Step 3: Unit: square meters (m²)

Answer: Billing sheet entry: Floor tiles, Quantity: 200 m²


Example 5: A SACCO office has installed 15 metal doors. Prepare the billing sheet entry.

Given: Number of metal doors = 15 units

Step 1: Item: Metal doors

Step 2: Quantity: 15 units

Step 3: Unit: number of units

Answer: Billing sheet entry: Metal doors, Quantity: 15 units

5.1.2 Transfer of booked quantities

Transferring booked quantities from measurement records to the billing sheet requires careful verification to avoid duplication or omission. The process involves summarizing measured quantities, cross-checking with measurement books, and preparing the billing sheet for valuation.

The key formula for total billed quantity for each item is:

$$ Q_{billed} = \sum_{i=1}^n Q_{measured,i} $$

where \(Q_{billed}\) is the total billed quantity for the item, and \(Q_{measured,i}\) are individual measured quantities from site records.

Worked Examples

Example 1: A Quantity Surveyor has three measurement records for plastering: 20 m², 35 m², and 25 m². Calculate the total billed quantity.

Given: \(Q_{measured,1} = 20\) m², \(Q_{measured,2} = 35\) m², \(Q_{measured,3} = 25\) m²

$$ Q_{billed} = 20 + 35 + 25 $$$$ Q_{billed} = 80 \text{ m}^2 $$

Answer: Total billed quantity for plastering is 80 m²


Example 2: For timber door frames, three booked quantities are 10 units, 5 units, and 8 units. Calculate total billed quantity.

Given: \(Q_{measured,1} = 10\) units, \(Q_{measured,2} = 5\) units, \(Q_{measured,3} = 8\) units

$$ Q_{billed} = 10 + 5 + 8 $$$$ Q_{billed} = 23 \text{ units} $$

Answer: Total billed quantity for timber door frames is 23 units


Example 3: Measurement records for concrete footing volumes are 5 m³, 7.5 m³, 6 m³, and 8 m³. Calculate total billed quantity.

Given: \(Q_{measured,1} = 5\) m³, \(Q_{measured,2} = 7.5\) m³, \(Q_{measured,3} = 6\) m³, \(Q_{measured,4} = 8\) m³

$$ Q_{billed} = 5 + 7.5 + 6 + 8 $$$$ Q_{billed} = 26.5 \text{ m}^3 $$

Answer: Total billed quantity for concrete footings is 26.5 m³


Example 4: For ceramic wall tiles, booked quantities are 15 m², 20 m², 18 m², and 22 m². Calculate total billed quantity.

Given: \(Q_{measured,1} = 15\) m², \(Q_{measured,2} = 20\) m², \(Q_{measured,3} = 18\) m², \(Q_{measured,4} = 22\) m²

$$ Q_{billed} = 15 + 20 + 18 + 22 $$$$ Q_{billed} = 75 \text{ m}^2 $$

Answer: Total billed quantity for ceramic wall tiles is 75 m²


Example 5: On a university building, four measurement records for electrical conduit length are 100 m, 150 m, 120 m, and 130 m. Calculate total billed quantity.

Given: \(Q_{measured,1} = 100\) m, \(Q_{measured,2} = 150\) m, \(Q_{measured,3} = 120\) m, \(Q_{measured,4} = 130\) m

$$ Q_{billed} = 100 + 150 + 120 + 130 $$$$ Q_{billed} = 500 \text{ m} $$

Answer: Total billed quantity for electrical conduit is 500 m

5.1.3 Price bill of quantities

The price bill of quantities involves applying the contract rates or prices to the billed quantities to determine the value of work done. This is essential for preparing interim payment certificates and final accounts.

The basic formula for value of work done is:

$$ V = Q \times R $$

where \(V\) is the value, \(Q\) is the billed quantity, and \(R\) is the rate or price per unit.

Worked Examples

Example 1: A school project has billed 100 m² of wall plastering priced at Ksh 450 per m². Calculate the value of work done.

Given: \(Q = 100\) m², \(R = 450\) Ksh/m²

$$ V = 100 \times 450 $$$$ V = 45000 \text{ Ksh} $$

Answer: Value of plastering work is Ksh 45,000


Example 2: Timber door frames measured 23 units at Ksh 2,500 per unit. Calculate the value.

Given: \(Q = 23\) units, \(R = 2,500\) Ksh/unit

$$ V = 23 \times 2500 $$$$ V = 57500 \text{ Ksh} $$

Answer: Value of timber door frames is Ksh 57,500


Example 3: Concrete footing volume of 26.5 m³ priced at Ksh 8,000 per m³. Calculate value.

Given: \(Q = 26.5\) m³, \(R = 8,000\) Ksh/m³

$$ V = 26.5 \times 8000 $$$$ V = 212000 \text{ Ksh} $$

Answer: Value of concrete footing is Ksh 212,000


Example 4: Ceramic wall tiles billed quantity 75 m² priced at Ksh 1,200 per m². Calculate value.

Given: \(Q = 75\) m², \(R = 1,200\) Ksh/m²

$$ V = 75 \times 1200 $$$$ V = 90000 \text{ Ksh} $$

Answer: Value of ceramic wall tiles is Ksh 90,000


Example 5: Electrical conduit length 500 m priced at Ksh 350 per meter. Calculate value.

Given: \(Q = 500\) m, \(R = 350\) Ksh/m

$$ V = 500 \times 350 $$$$ V = 175000 \text{ Ksh} $$

Answer: Value of electrical conduit work is Ksh 175,000

Practice Questions

  1. A retail shop has measured 75 m² of ceiling board installation priced at Ksh 600 per m². Calculate the value of work done. (5 marks)

  2. For a county government office, 45 m³ of reinforced concrete slab has been billed at Ksh 9,000 per m³. Determine the value. (5 marks)

  3. A cooperative society construction project has booked 150 linear meters of plumbing pipes at Ksh 1,100 per meter. Find the total value. (5 marks)

  4. On a hospital project, 35 units of aluminum windows have been measured. Each unit is priced at Ksh 8,500. Calculate the work value. (5 marks)

  5. For a bank building, 60 m² of floor tiles have been billed at Ksh 1,300 per m². Find the total value. (5 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒5.2 Emerging technologies

Emerging technologies are transforming the practice of measurement and quantification in quantity surveying across Kenya. These innovations optimize accuracy, efficiency, and collaboration in preparing bill measured quantities, enabling quantity surveyors to d…

🔒5.2.1 Building Information Modeling (BIM)

Building Information Modeling (BIM) integrates multi-dimensional digital representations of physical and functional characteristics of a construction project. Kenyan quantity surveyors increasingly adopt BIM to extract accurate quantities directly from coordin…

🔒5.2.2 Cloud-Based Collaboration Platforms

Cloud-based collaboration platforms enable quantity surveyors to work on bill measurement and project documentation in real time, regardless of location. In Kenya’s fast-growing construction sector, these platforms enhance communication and reduce delays cause…

🔒5.2.3 Artificial Intelligence (AI) and Machine Learning (ML)

AI and ML are increasingly applied in quantity surveying for automating measurements, predicting costs, and improving accuracy. Kenyan quantity surveyors benefit from these technologies by reducing repetitive tasks and enhancing decision support. AI involves m…

🔒5.2.4 Mobile Technology

Mobile technology enables quantity surveyors to perform measurements, capture data, and communicate from construction sites across Kenya. Smartphones and tablets equipped with specialized apps increase efficiency and accuracy in bill measurement. Mobile device…

Chapter Summary

This chapter focused on the detailed processes involved in the preparation and management of bill measured quantities for building works. It began with the billing paper or sheet, explaining how quantities are accurately prepared and booked, then transferred to ensure consistency and accuracy. The chapter also covered the creation of price bills of quantities, which incorporate unit costs for use in cost estimation and tendering. Attention was given to emerging technologies that are transforming quantity measurement and billing practices. Building Information Modeling was introduced as a powerful tool for integrating design and quantity data. Cloud-based collaboration platforms were shown to enhance communication and data sharing among project stakeholders. The use of artificial intelligence and machine learning was highlighted for automating measurement tasks and improving accuracy. Finally, mobile technology was discussed as a means to facilitate on-site data collection and real-time updates, streamlining the entire billing process.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A billing sheet shows 150 m² of wall plastering measured. If the rate per square metre is Ksh 350, calculate the total cost for plastering. (2 marks)

  2. During a measurement transfer, 250 m³ of concrete was booked on site. If the unit rate is Ksh 8,500 per m³, what is the total price to be entered on the price bill? (2 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the purpose of a billing sheet in the preparation of a bill of quantities for a commercial building project in Nairobi. (4 marks)
  2. Describe the process of transferring booked quantities from field measurements to the final billing paper. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Preparation of Billing Sheet Quantities for a Single-Storey Wall

Quantity Survey · Level 6
Measurement Of Building Works III
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a detailed billing sheet with measured quantities for a 5m long, 3m high, 230mm thick masonry wall.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing Sheet Paper (A4)
Scale RulerBuilding Works Drawing
Calculator
Set Square
Pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Scale Ruler1 Pc per Candidate
3Calculator1 Pc per Candidate
4Billing Sheet Paper (A4)3 Sheets per Candidate
5Pen1 Pc per Candidate
6Set Square1 Pc per Candidate
7Building Works Drawing1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION AND MEASUREMENT
Identified and used appropriate PPE in line with occupational safety and health regulations
(Award 1 mark for each correctly worn PPE: helmet, safety boots, reflective jacket, gloves, dust mask)
5
Assembled all required tools and materials before starting the measurement
(Award 0.5 marks for each correctly assembled item up to 3 marks)
3
Measured the wall length accurately within ±50 mm tolerance
(Award 4 marks for correct measurement within tolerance, 2 marks if attempted)
4
Measured the wall height accurately within ±50 mm tolerance
(Award 4 marks for correct measurement within tolerance, 2 marks if attempted)
4
Measured the wall thickness accurately within ±10 mm tolerance
(Award 4 marks for correct measurement within tolerance, 2 marks if attempted)
4
Recorded all measurements neatly and clearly on the billing sheet
(Award 1 mark for each correct and legible recording up to 3 marks)
3
Sub-Total23
TASK 2: QUANTITY CALCULATION AND BILLING SHEET PREPARATION
Calculated the wall volume correctly using length x height x thickness
(Award 5 marks for correct calculation, 3 marks if partially correct)
5
Prepared billing sheet showing detailed quantities for materials (bricks, mortar, cement, sand)
(Award 1 mark for each correctly calculated quantity up to 7 marks)
7
Used correct units and standard billing sheet format
(Award 3 marks for correct units and format, 1 mark if partially correct)
3
Cross-checked all quantities and calculations for accuracy
(Award 2 marks for evidence of cross-checking, 1 mark if attempted)
2
Sub-Total17
PRODUCT CHECKLIST
Billing sheet quantities match wall dimensions: length 5000 mm, height 3000 mm, thickness 230 mm within tolerance
(Award 8 marks for full accuracy, 4 marks if within tolerance, 0 if incorrect)
8
Billing sheet is neat, legible, and correctly formatted
(Award 4 marks for neatness and correct format, 2 marks if partially neat)
4
Sub-Total12
GRAND TOTAL52
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Transfer of Booked Quantities to Billing Sheet for Masonry Wall

Quantity Survey · Level 6
Measurement Of Building Works III
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Transfer measured quantities of a 100mm thick masonry wall, 20m long and 3m high, from field notes to the billing sheet accurately.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing Sheet (printed format)
CalculatorField Measurement Notes
Ruler (30 cm)
Pens
Clipboard
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Calculator1 Pc per Candidate
3Billing Sheet (printed format)1 Sheet per Candidate
4Field Measurement Notes1 Set per Candidate
5Pens1 Pc per Candidate
6Ruler (30 cm)1 Pc per Candidate
7Clipboard1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: TRANSFER OF BOOKED QUANTITIES
Identified and used appropriate PPEs (helmet, boots, reflective jacket)
(Award 1 mark for each correctly worn PPE)
3
Assembled all necessary tools and materials before starting
(Award 2 marks for assembling all listed tools and materials)
2
Read and understood the field measurement notes correctly
(Award 3 marks for correct interpretation of notes)
3
Calculated total quantities accurately from measurements
(Award 5 marks for accurate calculations with no errors)
5
Transferred quantities correctly to the billing sheet
(Award 2 marks each for correct transfer of length, height, and thickness quantities)
6
Reviewed and checked entries for accuracy and completeness
(Award 2 marks for thorough review and error correction)
2
Maintained neatness and legibility in the billing sheet entries
(Award 2 marks for clear and neat writing)
2
Sub-Total23
PRODUCT CHECKLIST
Billing sheet shows correct total wall area of 60.0 m² (20m x 3m) with 100mm thickness noted
(Award 5 marks for correct total quantities matching field notes and dimensions)
5
Quantities are presented in correct units and format as per billing sheet standards
(Award 4 marks for proper units and formatting)
4
Entries are free from arithmetic errors and omissions
(Award 3 marks for error-free entries)
3
Final billing sheet is signed and dated appropriately
(Award 2 marks for proper authentication of the document)
2
Sub-Total14
GRAND TOTAL37
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Pricing a Bill of Quantities for a Residential Wall ConstructionPractical 3
🔒Quantity Extraction and Verification Using BIM for a Reinforced Concrete BeamPractical 4
🔒Apply Cloud-Based Collaboration Platforms in Billing of Bill Measured QuantitiesPractical 5
🔒Automate Quantity Extraction and Error Detection Using AI in Billing SheetsPractical 6
🔒Utilize Mobile Technology for Onsite Quantity Measurement of a Concrete BeamPractical 7
🔒Integrate Traditional Billing and Digital Tools for Accurate Quantity BillsPractical 8
🔒Prepare and organize billing documentation for project submissionPractical 9
🔒Interpretation and Measurement of Bill Quantities from Technical DrawingsPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 17 questions Start quiz ▾
0%
0 / 2
🔒

15 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Prepare billing paper correctly using the standard format.
  • Transfer abstracted quantities and their descriptions accurately following standard procedures.
  • Carry out casting up correctly according to standard operating procedures.
  • Price the bill of quantities accurately following the correct methods.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.