Quantity Survey  ·  Level 6
Measurement Of Building Works II
Chapter 5: Bill measured Quantities
📚 2 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Prepare billing papers using the correct standard format confidently.
  • Transfer abstracted quantities and their descriptions accurately and neatly.
  • Carry out casting up calculations precisely following the standard operating procedures.
  • Price the bill of quantities correctly by applying the right procedures step-by-step.

Mastering these skills will help you create clear, accurate bills that are essential for successful building projects and professional trade work.

Bill measured quantities form a critical part of a quantity surveyor’s work, providing the foundation for accurate valuation and payment of building works. They are the detailed calculations recorded on billing sheets or papers, reflecting the actual measured work on site. This chapter focuses on the preparation and use of billing sheets, the transfer of booked quantities, and the pricing of bills of quantities, all essential for effective contract management in the Kenyan construction industry.

5.1 Billing paper/sheet quantities

Billing paper or sheet quantities are the detailed records of measured work, used for interim payments and final accounts. They bridge the gap between site measurements and the formal bill of quantities, ensuring that quantities are verified and priced correctly. Accurate billing sheets enable quantity surveyors to manage project cash flow and maintain financial control.

5.1.1 Preparation of billing sheet/paper

Billing sheets are systematically prepared to capture measured quantities for each item of work. The process requires a structured approach to ensure clarity, accuracy, and traceability of measurements.

Concept and Governing Formula

Billing sheets record quantities measured on site, organized by work sections, and prepared according to standard measurement rules. There is no single formula but adherence to measurement principles such as:

  • Quantities must be expressed in standard units (e.g., m², m³, number).
  • Measurements are taken from drawings and site checks.
  • Quantities recorded must correspond to items in the bill of quantities.

Worked Examples

Example 1: Measuring plaster area for billing
Given: A wall measures 5 m long and 3 m high. Plaster thickness is not relevant for area measurement.
Calculate the plaster area to be entered on the billing sheet.

Solution:
Area = Length × Height
= 5 m × 3 m
= 15 m²
Answer: 15 m²

Example 2: Measuring concrete volume for footing billing
Given: Footing dimensions are 2 m length, 0.5 m width, and 0.3 m depth.
Calculate the volume of concrete for billing.

Solution:
Volume = Length × Width × Depth
= 2 m × 0.5 m × 0.3 m
= 0.3 m³
Answer: 0.3 m³

Example 3: Measuring number of door frames for billing
Given: 12 door openings on site measured.
Calculate the quantity for door frames.

Solution:
Quantity = Number of door openings
= 12
Answer: 12

5.1.2 Transfer of booked quantities

Once quantities are measured and recorded on the billing sheets, they must be transferred accurately to the valuation or interim payment documents. This transfer is critical to avoid errors in payment claims.

Concept and Governing Formula

The transfer involves summing measured quantities per item and copying them into valuation sheets or interim payment forms. No formula applies, but the process includes verification steps to ensure consistency and correctness.

Worked Examples

Example 1: Summation and transfer of plaster areas
Given: Plaster areas measured in three rooms: 12 m², 15 m², and 18 m².
Calculate total plaster area to transfer.

Solution:
Total area = 12 m² + 15 m² + 18 m²
= 45 m²
Answer: 45 m²

Example 2: Transfer of concrete volumes for columns
Given: Column volumes measured as 0.5 m³, 0.7 m³, 0.6 m³.
Calculate total volume for transfer.

Solution:
Total volume = 0.5 m³ + 0.7 m³ + 0.6 m³
= 1.8 m³
Answer: 1.8 m³

Example 3: Transfer of number of windows
Given: 10 windows measured on billing sheet.
Confirm quantity for transfer.

Solution:
Quantity = 10
Answer: 10

5.1.3 Price bill of quantities

Pricing the bill of quantities involves multiplying measured quantities by appropriate unit rates to determine the value of work done. This stage is vital for preparing valuation certificates and interim payment applications.

Concept and Governing Formula

The value of work for each item is calculated using the formula:
Value = Quantity × Rate

Where:

  • Quantity is the measured amount from the billing sheet
  • Rate is the agreed unit cost from the contract or current market rates

Worked Examples

Example 1: Pricing plaster work
Given: Quantity = 15 m², Rate = Ksh 400/m²
Calculate the value of plaster work.

Solution:
Value = Quantity × Rate
= 15 m² × 400 Ksh/m²
= 6000 Ksh
Answer: 6000 Ksh

Example 2: Pricing concrete work
Given: Quantity = 0.3 m³, Rate = Ksh 8000/m³
Calculate the value of concrete.

Solution:
Value = Quantity × Rate
= 0.3 m³ × 8000 Ksh/m³
= 2400 Ksh
Answer: 2400 Ksh

Example 3: Pricing door frames
Given: Quantity = 12, Rate = Ksh 3500 per frame
Calculate total value.

Solution:
Value = Quantity × Rate
= 12 × 3500 Ksh
= 42000 Ksh
Answer: 42000 Ksh

Kenyan Context Example:

Example 4: Pricing blockwork for a classroom at Moi High School, Eldoret
Given: Quantity = 80 m², Rate = Ksh 1,100/m² (rate obtained from a tender by Epco Builders Ltd)

Solution:
Value = Quantity × Rate
= 80 m² × 1,100 Ksh/m²
= 88,000 Ksh
Answer: 88,000 Ksh (Epco Builders Ltd, Moi High School classroom)

Example 5: Pricing roof trusses for a health centre in Kisumu County
Given: Quantity = 10 trusses, Rate = Ksh 15,000 per truss (rate from Steel Structures Ltd)

Solution:
Value = Quantity × Rate
= 10 × 15,000 Ksh
= 150,000 Ksh
Answer: 150,000 Ksh (Steel Structures Ltd, Kisumu Health Centre)

Practice Questions

  1. Calculate the plaster area for a wall 7 m long and 2.5 m high. (4 marks)
  2. A footing measures 3 m by 1 m by 0.4 m. Calculate the concrete volume. (5 marks)
  3. Transfer the total measured areas of 10 m², 15 m², and 20 m² from billing sheets. (3 marks)
  4. Price a concrete volume of 1.2 m³ at Ksh 7500/m³. (4 marks)
  5. Calculate the value of 8 door frames priced at Ksh 4000 each. (4 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒5.2 Emerging technologies

Emerging technologies are transforming how quantity surveyors measure and manage building works in Kenya. These innovations improve accuracy, efficiency, and collaboration, enabling professionals to deliver better value to clients in complex projects. Understa…

Chapter Summary

This chapter covered the concept of bill measured quantities, focusing first on billing paper or sheet quantities. It detailed the preparation process of billing sheets, emphasizing accuracy and clarity to ensure correct measurement records. The transfer of booked quantities from measurement records to billing documents was explained as a crucial step for maintaining consistency. The chapter then discussed the price bill of quantities, highlighting how unit rates are applied to measured quantities to determine costs. Attention was given to emerging technologies shaping the measurement and billing process in building works. Building Information Modeling was introduced as a tool for integrated digital representation of construction data. Cloud-based collaboration platforms were described as enhancing communication and data sharing among project stakeholders. Finally, the roles of artificial intelligence, machine learning, and mobile technology were explored for improving efficiency, accuracy, and real-time data access in quantity measurement and billing.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A billing sheet records 150 m² of wall plastering. If the rate per m² is Ksh 450, calculate the total cost for plastering. (2 marks)

  2. A quantity surveyor transferred 300 m³ of concrete from the measurement book to the billing paper. If the unit price is Ksh 8,000 per m³, find the total amount to be included in the price bill of quantities. (3 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the main purpose of preparing a billing sheet in a construction project at a county government hospital in Kisumu. (4 marks)
  2. Describe the process of transferring booked quantities from the measurement book to the billing paper during quantity surveying. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Preparation of Billing Sheet for Measured Building Works

Quantity Survey · Level 6
Measurement Of Building Works II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a billing sheet listing measured quantities for a 4m long by 3m high brick wall.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing sheet paper (A4 ruled)
CalculatorReference building drawing
Set square
Ruler (30cm)
Pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Calculator1 Pc per Candidate
3Billing sheet paper (A4 ruled)3 Sheets per Candidate
4Pen1 Pc per Candidate
5Set square1 Pc per Candidate
6Ruler (30cm)1 Pc per Candidate
7Reference building drawing1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION OF BILLING SHEET
Identified and used appropriate PPE (helmet, safety boots, reflective vest)
(Award 1 mark for each PPE worn correctly)
3
Assembled all necessary tools and materials before starting
(Award 2 marks for assembling all listed tools and materials)
2
Measured dimensions of the brick wall accurately using measuring tape
(Award 1 mark for each correct measurement of length, height, thickness, and two other relevant dimensions)
5
Calculated quantities of bricks, mortar, and plaster correctly
(Award 2 marks for each correct quantity calculated: bricks, cement, sand, plaster)
8
Organized and listed measured quantities systematically on the billing sheet
(Award 1 mark for each correctly listed and arranged item)
5
Completed the billing sheet legibly and neatly
(Award 2 marks for neatness and legibility)
2
Checked calculations and measurements for accuracy before submission
(Award 3 marks for verification and correction of errors)
3
Sub-Total28
PRODUCT CHECKLIST
Billing sheet correctly shows measured length 4000mm (±50mm tolerance)
(Award 2 marks for correct length dimension)
2
Billing sheet correctly shows measured height 3000mm (±50mm tolerance)
(Award 2 marks for correct height dimension)
2
Billing sheet includes accurate quantity of bricks calculated based on wall dimensions
(Award 4 marks for correct brick quantity)
4
Billing sheet includes accurate quantities of cement and sand for mortar and plaster
(Award 4 marks for correct material quantities)
4
Billing sheet is well organized with clear headings and units
(Award 3 marks for presentation and clarity)
3
Final billing sheet free from calculation errors and omissions
(Award 3 marks for completeness and accuracy)
3
Sub-Total18
GRAND TOTAL46
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Transfer of Measured Quantities to Billing Sheet for Foundation Works

Quantity Survey · Level 6
Measurement Of Building Works II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Transfer accurately measured quantities of strip footing 600mm wide, 300mm deep, and 15m long from the field measurement book to the billing sheet.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Field Measurement Book
CalculatorBilling Sheet (Printed Template)
Pens
Clipboard
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Field Measurement Book1 Pc per Candidate
3Billing Sheet (Printed Template)1 Pc per Candidate
4Pens (Blue or Black Ink)1 Pc per Candidate
5Calculator1 Pc per Candidate
6Clipboard1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION AND SETUP
Identified and wore appropriate PPE (helmet, safety boots, reflective vest)
(Award 1 mark each for correctly worn PPE items)
3
Assembled all necessary tools and materials before starting
(Award 0.5 mark each for assembling measuring tape, calculator, pen, clipboard)
2
Checked the field measurement book for completeness and legibility
(Award 2 marks for complete and clear measurement entries)
2
Sub-Total7
TASK 2: TRANSFER OF QUANTITIES
Accurately read and interpreted the measured dimensions from the field book
(Award 1 mark each for length, width, and depth correctly identified)
3
Calculated the quantity of concrete volume correctly (using formula length x width x depth)
(Award 4 marks for correct calculation; partial marks for partial correctness)
4
Entered the quantities correctly into the billing sheet without errors
(Award 1 mark each for correct length, width, depth, and total volume entered)
4
Used the calculator correctly to verify totals
(Award 2 marks for correct calculator use and verification)
2
Sub-Total13
TASK 3: COMPLETION AND PRESENTATION
Reviewed the billing sheet for accuracy and completeness
(Award 2 marks for thorough review with no errors)
2
Submitted the billing sheet neatly and legibly
(Award 2 marks for neatness and legibility)
2
Sub-Total4
PRODUCT CHECKLIST
Billing sheet reflects correct and accurate transfer of measured quantities (length 15,000mm ±50mm, width 600mm ±10mm, depth 300mm ±10mm) and correct calculated volume
(Award 10 marks for correct quantities and volume matching field notes within tolerance)
10
Sub-Total10
GRAND TOTAL34
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Pricing Bill of Quantities for a Reinforced Concrete BeamPractical 3
🔒Extraction and Verification of Quantities Using BIM SoftwarePractical 4
🔒Collaborate on billing sheets and quantity data using cloud platformsPractical 5
🔒Automated Quantity Takeoff and Billing Error Detection using AI/MLPractical 6
🔒Onsite Quantity Measurement Using Mobile TechnologyPractical 7
🔒Prepare and integrate manual billing sheet with digital quantity takeoff for a 3m x 2.5m masonry wallPractical 8
🔒Verification and Reconciliation of Measured Quantities Against Priced BillPractical 9
🔒Generate and Export Billing Reports from a Digital Billing SystemPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 14 questions Start quiz ▾
0%
0 / 2
🔒

12 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Prepare billing papers using the correct standard format confidently.
  • Transfer abstracted quantities and their descriptions accurately and neatly.
  • Carry out casting up calculations precisely following the standard operating procedures.
  • Price the bill of quantities correctly by applying the right procedures step-by-step.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.