Quantity Survey  ·  Level 6
Civil Engineering Drawings
Chapter 9: Prepare Tunnel drawings
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Understand and interpret use drawings to determine the tunnel’s function clearly.
  • Identify the type of tunnel by considering its function and the site conditions accurately.
  • Prepare detailed tunnel drawings to scale, following standard operating procedures (SOPs) correctly.
  • Create accurate exploded views of tunnels based on their type and intended use.
  • Apply emerging technologies effectively and safely while following SOPs.

Mastering these skills will help you create precise and professional tunnel drawings that are essential for successful civil engineering projects.

Tunnel construction is a critical aspect of civil engineering projects in Kenya, especially for infrastructure development such as roadways, railways, water supply, and mining operations. Quantity Surveyors require precise tunnel drawings to accurately estimate costs, manage resources, and ensure compliance with design specifications. This chapter focuses on the types of tunnels encountered in the field and the essential features of tunnel drawings, equipping Quantity Survey professionals with the knowledge to interpret and prepare these technical documents effectively.

9.1 Types Of Tunnels

In Kenya, tunnels are constructed for various purposes including transportation, water conveyance, and mining. Understanding the different types of tunnels is vital for Quantity Surveyors to evaluate project scope, materials, and construction methods accurately. This section explores the classification of tunnels based on their function, construction method, and geological setting.

9.1.1 Classification by Purpose

Tunnels serve diverse functions in civil engineering projects, influencing their design and construction techniques.

  • Transportation Tunnels: Used for roads, railways, and pedestrian pathways, these tunnels facilitate efficient movement through geographical obstacles such as hills and mountains. For example, tunnels in Nairobi’s urban road network help alleviate traffic congestion.
  • Water Conveyance Tunnels: Designed to transport water for irrigation, hydroelectric power, or municipal supply, these tunnels must ensure watertightness and durability. The Thika Dam project includes water tunnels to channel water to treatment plants.
  • Utility Tunnels: These house essential services such as electrical cables, telecommunication lines, and pipelines, protecting them from environmental damage and facilitating maintenance.
  • Mining Tunnels: Created for access to underground minerals, these tunnels require specialized ventilation and safety considerations. The South Rift Valley mining operations use such tunnels extensively.
  • Service and Escape Tunnels: Incorporated in large infrastructure projects, these tunnels provide emergency exits or service access to main tunnels, enhancing safety.

9.1.2 Classification by Construction Method

The method used to construct a tunnel depends on ground conditions, tunnel size, and available technology.

  • Cut-and-Cover Tunnels: Constructed by excavating a trench, building the tunnel structure, then covering it back. This method is common for shallow tunnels such as underpasses in urban areas.
  • Bored Tunnels: Created using Tunnel Boring Machines (TBM), these tunnels are circular and suitable for long distances and deep installations. The Nairobi Expressway project employs bored tunnels for underpasses.
  • Drill and Blast Tunnels: Used in hard rock conditions, this method involves drilling holes, charging explosives, blasting, and removing debris. It is typical in mining and mountainous terrain.
  • Immersed Tube Tunnels: Prefabricated tunnel sections are submerged and joined underwater, often used for river or lake crossings.
  • New Austrian Tunneling Method (NATM): This technique uses the surrounding rock’s strength for tunnel support, employing shotcrete and rock bolts. It is adaptive to varying geological conditions.

9.1.3 Classification by Geological Setting

Geological conditions influence tunnel design, safety, and construction approach.

  • Soft Ground Tunnels: Constructed in soils like clay, silt, or sand, requiring extensive support systems to prevent collapse. Groundwater control is a significant challenge here.
  • Rock Tunnels: Excavated through solid rock formations, these tunnels are generally more stable but require blasting or mechanical excavation.
  • Mixed Ground Tunnels: Pass through alternating layers of rock and soil, demanding flexible construction methods and support systems.
  • Underwater Tunnels: Built beneath bodies of water, these tunnels require waterproofing and pressure-resistant design to withstand hydrostatic forces.

9.1.4 Relevance to Quantity Surveying

Accurate knowledge of tunnel types allows Quantity Surveyors to:

  • Assess material requirements suited to tunnel type and ground conditions.
  • Estimate labour and equipment costs based on construction methods.
  • Evaluate risks related to geological challenges and incorporate contingencies.
  • Coordinate with engineers to verify design assumptions affecting quantities and rates.

Practice Questions

  1. Explain five different purposes of tunnels and how each purpose influences the design considerations. (10 marks)
  2. Describe the construction steps involved in the cut-and-cover tunnel method and discuss its advantages and limitations. (12 marks)
  3. Identify and explain four geological settings for tunnels and the implications for Quantity Surveyors during cost estimation. (8 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒9.2 Tunnel Drawings

Tunnel drawings are specialized technical documents that communicate design intent, construction details, and material specifications. For Quantity Surveyors, these drawings provide essential data to quantify materials, verify project scope, and prepare accura…

🔒9.3 Tunnel Detailing

Tunnel detailing is a critical phase in preparing civil engineering drawings that quantity surveyors use for accurate measurement and cost estimation. In Kenya’s expanding infrastructure sector, tunnels are increasingly common in road, railway, and water suppl…

🔒9.4 Emerging Technology in Drawing

The civil engineering and quantity surveying sectors in Kenya are rapidly adopting emerging technologies to improve accuracy, collaboration, and efficiency in drawing preparation and interpretation. These technologies enable quantity surveyors to better visual…

Chapter Summary

This chapter covered the various types of tunnels, highlighting their distinct structural purposes and construction methods. It explained the essential components and conventions involved in preparing accurate tunnel drawings, emphasizing clarity and adherence to relevant standards. The chapter detailed how to enhance tunnel drawings with precise annotations and sectional views to ensure comprehensive representation of the tunnel’s features. It also explored emerging technologies transforming tunnel drawing practices, starting with Building Information Modeling which integrates multidimensional data for improved design and coordination. Augmented Reality and Virtual Reality were discussed as tools for immersive visualization and on-site guidance. The use of cloud-based collaboration platforms was presented as a means to facilitate real-time teamwork and data sharing among project stakeholders. Finally, the chapter introduced drones and 3D scanning as innovative methods for capturing detailed site information to enhance drawing accuracy and project monitoring.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which of the following is NOT a common type of tunnel used in civil engineering projects?
    a) Bored tunnel
    b) Cut-and-cover tunnel
    c) Suspension tunnel
    d) Immersed tube tunnel
    (2 marks)

  2. Describe the primary purpose of a tunnel longitudinal section drawing in tunnel construction. (3 marks)

🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Identify and describe four common types of tunnels used in Kenyan civil engineering projects. (4 marks)
  2. Explain the purpose of a tunnel longitudinal section drawing in quantity surveying. (4 marks)
🔒30 more in this section.

Chapter Practical Activities

Practical 1: Identify and classify tunnel types according to purpose and construction method

Quantity Survey · Level 6
Civil Engineering Drawings
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and classify at least five different tunnel types by purpose and construction method using the provided reference cards.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring tapeTunnel type reference cards
NotebookSafety helmet
PenReflective safety vest
Safety boots
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Tunnel type reference cards1 set per Candidate
2Measuring tape (5m)1 per Candidate
3Notebook1 per Candidate
4Pen1 per Candidate
5Safety helmet1 per Candidate
6Reflective safety vest1 per Candidate
7Safety boots1 pair per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and Classification of Tunnel Types
Used appropriate PPEs (helmet, boots, reflective vest)
(Award 1 mark each for any correct PPE used)
3
Assembled tools and materials correctly before starting the task
(Award 2 marks for assembling all required tools and materials)
2
Identified at least five different tunnel types from the reference cards
(Award 1 mark for each correct tunnel type identified)
5
Classified each tunnel type correctly according to its purpose
(Award 1 mark for each correct classification by purpose)
5
Classified each tunnel type correctly according to its construction method
(Award 1 mark for each correct classification by construction method)
5
Recorded observations clearly and accurately in the notebook
(Award up to 3 marks for clear and accurate records)
3
Cleaned and stored tools and materials properly after the task
(Award 2 marks for proper cleaning and storage)
2
Sub-Total25
PRODUCT CHECKLIST
Correct identification and classification of a minimum of five tunnel types
(Award 2 marks for each correctly identified and classified tunnel type)
10
Clarity and neatness of recorded classifications
(Award up to 5 marks for legible and well-organized notes)
5
Sub-Total15
GRAND TOTAL40
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Prepare Scaled Tunnel Layout Drawings Showing Plan and Profile Views

Quantity Survey · Level 6
Civil Engineering Drawings
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Create a scaled tunnel layout drawing showing plan and profile views of a tunnel 6000mm long with a 4000mm wide arch and 3500mm height as per the provided site data.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Lime/Cement Chalk for Site Marking
Drawing BoardPPE: Safety Helmet
T-SquarePPE: Safety Boots
Set Squares (45° and 30°/60°)PPE: Reflective Jacket
Protractor
Pencils (HB, 2B)
Eraser
Scale Ruler (Metric)
Tracing Paper Sheets (A3 Size)
Spirit Level
Profile Boards
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Drawing Board1 Pc per Candidate
3T-Square1 Pc per Candidate
4Set Squares (45° and 30°/60°)1 Set per Candidate
5Protractor1 Pc per Candidate
6Pencils (HB, 2B)2 Pcs per Candidate
7Eraser1 Pc per Candidate
8Scale Ruler (Metric)1 Pc per Candidate
9Tracing Paper Sheets (A3 Size)3 Sheets per Candidate
10Lime/Cement Chalk for Site MarkingSufficient per Candidate
11Profile Boards4 Pcs per Candidate
12Spirit Level1 Pc per Candidate
13PPE: Safety Helmet1 Pc per Candidate
14PPE: Safety Boots1 Pair per Candidate
15PPE: Reflective Jacket1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SITE PREPARATION AND SETTING OUT
Identified and used appropriate PPEs including helmet, safety boots, and reflective jacket
(Award 1 mark for each correct PPE used)
3
Prepared and cleared the site location sufficiently for setting out the tunnel layout
(Award 2 marks for correct site clearance and preparation)
2
Assembled and identified the layout tools correctly (measuring tape, profile boards, spirit level)
(Award 1 mark each for correct identification and assembly of measuring tape, profile boards, and spirit level)
3
Set out the tunnel plan accurately on the ground using profile boards and lime marking
(Award 4 marks for correct positioning of pegs and accurate marking of tunnel plan)
4
Transferred levels to profile boards ensuring correct datum and vertical alignment
(Award 1 mark each for correct datum identification, level transfer, and vertical alignment)
3
Observed accuracy during layout setting out with tolerances within ±50mm
(Award 1 mark for 50% accuracy, 2 marks for 75% accuracy, 3 marks for 100% accuracy)
3
Cleaned the working area and stored tools and materials correctly after use
(Award 1 mark each for cleaning the site and proper storing of tools)
2
Sub-Total20
TASK 2: DRAWING PREPARATION
Used correct scale and layout to draw tunnel plan view (6000mm length x 4000mm width)
(Award 5 marks for correct scaled plan drawing)
5
Drew profile view showing tunnel height of 3500mm with correct arch shape
(Award 5 marks for accurate profile drawing with arch dimensions)
5
Included appropriate dimensions and annotations on drawings
(Award 1 mark each for length, width, height, and annotations)
4
Ensured drawings are neat, clean, and legible
(Award 3 marks for overall neatness and presentation)
3
Sub-Total17
PRODUCT CHECKLIST
Completed tunnel layout drawing with plan and profile views showing length 6000mm, width 4000mm, height 3500mm within ±50mm tolerance
(Award up to 10 marks for correct dimensions and tolerances on the final drawing)
10
Drawing is correctly scaled, squared, and annotated with all relevant details
(Award 5 marks for scale accuracy, squareness, and complete annotations)
5
Drawing presentation is neat, professional, and free from smudges or errors
(Award 5 marks for neatness and professional presentation)
5
Sub-Total20
GRAND TOTAL57
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Detail Tunnel Cross-Sections and ReinforcementsPractical 3
🔒Create and Coordinate a 3D Tunnel Model Using BIM SoftwarePractical 4
🔒Visualize Tunnel Construction Using AR and VRPractical 5
🔒Collaborative Cloud Management of Tunnel DrawingsPractical 6
🔒Conduct Drone Survey for Tunnel Site MappingPractical 7
🔒Generate 3D Scanned Tunnel Model for Design VerificationPractical 8
🔒Integrate BIM, AR, and VR Technologies into Tunnel Drawing WorkflowPractical 9
🔒Prepare a comprehensive tunnel construction drawing setPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 17 questions Start quiz ▾
0%
0 / 2
🔒

15 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Understand and interpret use drawings to determine the tunnel’s function clearly.
  • Identify the type of tunnel by considering its function and the site conditions accurately.
  • Prepare detailed tunnel drawings to scale, following standard operating procedures (SOPs) correctly.
  • Create accurate exploded views of tunnels based on their type and intended use.
  • Apply emerging technologies effectively and safely while following SOPs.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.