By the end of this chapter, you will be able to:
These skills will help you create clear and precise railway drawings, essential for safe and efficient railway construction and maintenance.
Railway track drawings are crucial documents for quantity surveyors involved in civil engineering projects related to rail infrastructure in Kenya. These drawings provide detailed visual representations of track layouts, alignments, and components, enabling accurate measurement and cost estimation. Understanding the different types of railway tracks and their specific features is essential for producing precise drawings that comply with industry standards and project requirements.
The classification of railway tracks is fundamental for quantity surveyors to accurately interpret and prepare drawings that reflect the construction scope. Different track types influence material quantities, construction methods, and maintenance needs. In Kenya, where rail transport projects often involve both new construction and rehabilitation, knowledge of track types supports effective budgeting and resource allocation.
Conventional railway tracks are the most common type used in Kenya’s rail infrastructure, supporting passenger and freight services. These tracks consist of two parallel steel rails fixed to sleepers (or ties) laid on a ballast bed. Understanding their components and layout is vital for quantity surveyors when preparing drawings, as these affect excavation, material requirements, and labor costs.
Ballasted and ballastless tracks represent two different structural approaches, each with distinct implications for quantity surveying and drawing preparation. Ballasted tracks use loose stone ballast as a base, while ballastless tracks use rigid concrete slabs, affecting the design details and material take-offs.
The number of tracks laid side by side defines operational capacity and affects quantities in drawings. Single and double tracks require different design considerations and material volumes.
Temporary tracks are laid to facilitate construction activities, while permanent tracks serve operational rail services. Differentiating these types is important for quantity surveyors to allocate costs correctly.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covered the various types of railway tracks, explaining their specific uses and structural differences. It then explored the essential components and conventions involved in preparing railway track drawings, emphasizing the importance of accuracy and adherence to standards. Detailed guidance was provided on how to represent track features clearly, including rails, sleepers, ballast, and alignment details. The chapter also highlighted the importance of incorporating precise measurements and annotations to ensure the drawings serve as effective construction and maintenance references. Techniques for detailing curves, switches, and crossings were discussed to enhance the clarity of complex track layouts. By combining theoretical knowledge with practical drawing procedures, the chapter equipped students with the skills necessary to produce comprehensive and professional railway track drawings.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape | Railway Track Samples |
| Magnifying Glass | Track Model Kits |
| Notebook and Pen |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Safety Helmet | 1 Pc per Candidate |
| 2 | Safety Boots | 1 Pair per Candidate |
| 3 | Reflective Safety Jacket | 1 Pc per Candidate |
| 4 | Railway Track Samples (Standard Gauge, Metre Gauge, Narrow Gauge) | 1 Set per Candidate |
| 5 | Track Model Kits (Wooden or Metal) | 1 Set per Candidate |
| 6 | Measuring Tape (5 m) | 1 Pc per Candidate |
| 7 | Notebook and Pen | 1 Set per Candidate |
| 8 | Magnifying Glass | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identification and Classification of Railway Track Types | |||
| Used appropriate PPE: Safety helmet, Safety boots, Reflective jacket (Award 1 mark each for correctly worn PPE) | 3 | ||
| Collected and assembled all required tools and materials (Award 2 marks for assembling all tools and materials listed) | 2 | ||
| Identified Standard Gauge track sample correctly (Award 3 marks for correctly identifying and describing Standard Gauge track) | 3 | ||
| Identified Metre Gauge track sample correctly (Award 3 marks for correctly identifying and describing Metre Gauge track) | 3 | ||
| Identified Narrow Gauge track sample correctly (Award 3 marks for correctly identifying and describing Narrow Gauge track) | 3 | ||
| Measured and recorded gauge width accurately for each track type (Award 1.33 marks for each accurate gauge measurement within ±5 mm tolerance) | 4 | ||
| Classified tracks based on gauge and sleepers type using models (Award 2 marks for correct classification using models) | 2 | ||
| Recorded observations neatly and clearly in the notebook (Award 2 marks for clear and complete records) | 2 | ||
| Sub-Total | 22 | ||
| PRODUCT CHECKLIST | |||
| Accurate classification and identification of all three railway track types (Award 5 marks for 100% correct classification) | 5 | ||
| Correct recorded gauge measurements: Standard Gauge (1435 mm), Metre Gauge (1000 mm), Narrow Gauge (762 mm) (Award 5 marks for measurements within ±5 mm of actual gauge) | 5 | ||
| Clear and complete documentation of distinguishing features of each track type (Award 3 marks for comprehensive and neat documentation) | 3 | ||
| Sub-Total | 13 | ||
| GRAND TOTAL | 35 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Measuring Tape (5m) | Railway Track Layout Drawing (Original) |
| Scale Ruler (metric) | |
| Pencil and Eraser | |
| Drawing Board (A2 size) | |
| Tracing Paper (A2 size) | |
| Protractor | |
| Calculator |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Measuring Tape (5m) | 1 Pc per Candidate |
| 2 | Scale Ruler (metric) | 1 Pc per Candidate |
| 3 | Pencil and Eraser | 1 set per Candidate |
| 4 | Drawing Board (A2 size) | 1 Pc per Candidate |
| 5 | Tracing Paper (A2 size) | 2 Sheets per Candidate |
| 6 | Protractor | 1 Pc per Candidate |
| 7 | Calculator | 1 Pc per Candidate |
| 8 | Railway Track Layout Drawing (Original) | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: INTERPRET RAILWAY TRACK DRAWING | |||
| Identified and used appropriate PPE (helmet, safety boots, reflective vest) (Award 1 mark each for any correct PPE used) | 3 | ||
| Assembled and used tools correctly (scale ruler, protractor, measuring tape, calculator) (Award 1 mark each for correct tool usage) | 4 | ||
| Read and interpreted track gauge dimension correctly (1500mm) (Award 3 marks for correct interpretation) | 3 | ||
| Measured curve radius accurately from drawing (3000mm radius) (Award 3 marks for correct measurement) | 3 | ||
| Identified track alignment elements (straight, curve, turnout) correctly (Award 1 mark each for correctly identifying four elements) | 4 | ||
| Calculated and recorded track specifications (lengths, angles, spacing) (Award 1 mark for each accurate calculation, up to 5 marks) | 5 | ||
| Prepared a clear and accurate report summarizing layout and specifications (Award up to 3 marks for clarity, completeness, and accuracy) | 3 | ||
| Cleaned and stored tools appropriately after use (Award 2 marks for proper cleaning and storage) | 2 | ||
| Sub-Total | 27 | ||
| PRODUCT CHECKLIST | |||
| Report correctly states track gauge as 1500mm (Award 3 marks for correct gauge dimension) | 3 | ||
| Report accurately states curve radius as 3000mm (Award 3 marks for correct radius) | 3 | ||
| Report includes accurate track alignment elements with correct dimensions and angles (Award 5 marks for complete and accurate details) | 5 | ||
| Report is well-organized, legible, and free from errors (Award 5 marks for overall presentation and accuracy) | 5 | ||
| Sub-Total | 16 | ||
| GRAND TOTAL | 43 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.