Quantity Survey  ·  Level 6
Measurement Of Building Works I
Chapter 5: Bill measured Quantities
📚 2 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Prepare billing papers using the standard format with confidence.
  • Transfer abstracted quantities and their descriptions accurately by following the correct procedures.
  • Carry out casting up correctly according to standard operating procedures.
  • Price the bill of quantities accurately and efficiently using the right methods.

Mastering these skills will help you produce professional and reliable bills of quantities, a key part of success in the building and construction industry.

Billing paper or billing sheets form the foundation for recording measured quantities in building works, facilitating the accurate preparation of bills of quantities. Quantity surveyors in Kenya rely on these documents to systematically capture and transfer measurements from site to tender documents, ensuring transparent and verifiable costing. Mastery of billing sheet preparation and quantity transfer is essential to uphold professional standards and support effective contract administration.

5.1 Billing paper/sheet

Billing sheets serve as the intermediary documents used on-site or in the office to note down quantities measured for various building elements. They allow quantity surveyors to organise and summarise measurements before transferring them into formal bills of quantities, which are then priced for tendering or valuation purposes.

5.1.1 Preparation of billing sheet/paper quantities

Billing sheets are structured documents that capture the detailed measurements of building works in an organised manner. Preparing these sheets requires accuracy, clarity, and consistency to ensure the quantities recorded can be reliably used for costing and payment.

The process of preparing billing sheets involves the following key steps:

  1. Identify the work section: Begin by clearly indicating the work section or trade (e.g., concrete works, brickwork, finishes) on the billing sheet to ensure proper categorisation.

  2. Record item descriptions: For each measured item, write a clear description referencing the relevant drawing or specification clause to avoid ambiguity.

  3. Write measurements and units: Enter the measured dimensions (length, width, height, thickness) with correct units (meters, square meters, cubic meters) as per the measurement rules.

  4. Calculate quantities: Use the measurements to compute the quantities, applying the appropriate formulas for area, volume, or count.

  5. Include references or remarks: Add any relevant notes such as measurement date, location on site, or measurement conditions to provide context.

  6. Review and verify: Cross-check the recorded quantities against the field measurements and drawings for accuracy before transferring.

Worked Examples

Example 1: A quantity surveyor measures a rectangular slab of dimensions 6 m by 4 m with a thickness of 0.15 m. Calculate the volume to record on the billing sheet.

Given: Length = 6 m, Width = 4 m, Thickness = 0.15 m$$\text{Volume} = \text{Length} \times \text{Width} \times \text{Thickness}$$$$= 6 \times 4 \times 0.15$$$$= 3.6 \text{ m}^3$$ Answer: 3.6 m³

Example 2: A wall measuring 10 m long and 3 m high is constructed using bricks. Calculate the wall area for billing.

Given: Length = 10 m, Height = 3 m$$\text{Area} = \text{Length} \times \text{Height}$$$$= 10 \times 3$$$$= 30 \text{ m}^2$$ Answer: 30 m²

Example 3: A window opening of dimensions 1.2 m by 1.5 m needs to be deducted from the wall area. Calculate the opening area.

Given: Length = 1.2 m, Height = 1.5 m$$\text{Area} = 1.2 \times 1.5$$$$= 1.8 \text{ m}^2$$ Answer: 1.8 m²

Example 4: Calculate the net wall area after deducting the window opening from the wall area in Example 2.

Given: Wall area = 30 m², Window opening = 1.8 m²$$\text{Net area} = 30 - 1.8$$$$= 28.2 \text{ m}^2$$ Answer: 28.2 m²

Example 5: A concrete column has a square cross-section 0.3 m by 0.3 m and a height of 3 m. Calculate the volume.

Given: Side = 0.3 m, Height = 3 m$$\text{Volume} = \text{Side} \times \text{Side} \times \text{Height}$$$$= 0.3 \times 0.3 \times 3$$$$= 0.27 \text{ m}^3$$ Answer: 0.27 m³

Example 6 (Kenyan Context): A quantity surveyor from Kenya National Highways Authority (KeNHA) measures a reinforced concrete beam of length 8 m, width 0.25 m, and depth 0.4 m for a road bridge project. Calculate the volume to record on the billing sheet.

Given: Length = 8 m, Width = 0.25 m, Depth = 0.4 m$$\text{Volume} = \text{Length} \times \text{Width} \times \text{Depth}$$$$= 8 \times 0.25 \times 0.4$$$$= 0.8 \text{ m}^3$$ Answer: 0.8 m³

5.1.2 Transfer of booked quantities

Transferring booked quantities from billing sheets to the bill of quantities requires careful verification and systematic recording to maintain accuracy and traceability. This process forms the link between site measurements and formal cost documentation.

The transfer process typically involves the following steps:

  1. Verify quantities: Reconcile the quantities recorded on the billing sheets with site measurements and drawings to confirm accuracy.

  2. Match work sections: Ensure that the billing sheet items correspond exactly to the relevant work sections and descriptions in the bill of quantities.

  3. Enter quantities into the bill: Carefully transfer the quantities into the bill of quantities, maintaining the same units and item references.

  4. Check for omissions or duplications: Review the bill to detect any missing items or duplicated quantities.

  5. Record transfer dates and officer details: Note the date of transfer and the responsible quantity surveyor to maintain accountability.

  6. File and archive billing sheets: Keep the original billing sheets securely for future reference or audit.

Worked Examples

Example 1: A billing sheet records 12 m³ of concrete for a slab. Transfer this quantity into the bill of quantities.

Given: Concrete quantity = 12 m³

  • Verify concrete section in the bill
  • Locate the concrete slab item
  • Enter 12 m³ in the quantity column
    Answer: 12 m³ entered in the bill

Example 2: A wall area of 25 m² is measured on the billing sheet. The bill of quantities has the same wall item. Transfer the quantity.

Given: Wall area = 25 m²

  • Confirm wall description matches
  • Enter 25 m² in the bill under wall works
    Answer: 25 m² entered in the bill

Example 3: Two billing sheets list 8 m and 10 m lengths for different plumbing pipes. Transfer to the bill.

Given: Pipe lengths = 8 m and 10 m

  • Identify pipework section in bill
  • Enter 8 m and 10 m separately or sum as required
    Answer: 18 m total pipe length recorded

Example 4: A billing sheet has a quantity of 15 m² for tiling. Transfer to the bill and verify units.

Given: Tiling area = 15 m²

  • Confirm units match
  • Enter 15 m² in the finishing section of the bill
    Answer: 15 m² entered

Example 5: A billing sheet records 0.5 m³ of excavation. Transfer to the bill.

Given: Excavation volume = 0.5 m³

  • Locate excavation item in bill
  • Enter 0.5 m³ in quantity column
    Answer: 0.5 m³ recorded

5.1.3 Price bill of quantities

Pricing the bill of quantities involves applying rates to the measured quantities to determine the total cost for each item and the overall project. This step is crucial for tendering, valuation, and cost control in construction projects.

The procedure for pricing a bill of quantities includes:

  1. Confirm quantities: Verify the accuracy and completeness of the quantities before pricing.

  2. Obtain current rates: Source up-to-date unit rates from suppliers, subcontractors, or standard rate books relevant to the Kenyan market.

  3. Apply unit rates: Multiply each quantity by its respective unit rate to calculate the item cost.

  4. Calculate total sums: Sum the item costs for each work section and the entire bill.

  5. Include preliminaries and contingencies: Add costs for site preliminaries, overheads, and contingencies as appropriate.

  6. Review and adjust: Check calculations for errors and adjust rates or quantities if necessary to reflect project specifics.

Worked Examples

Example 1: Price 10 m³ of concrete at Ksh 6,000 per m³.

Given: Quantity = 10 m³, Rate = Ksh 6,000/m³
Cost = Quantity × Rate
Cost = 10 × 6,000
Cost = Ksh 60,000
Answer: Ksh 60,000

Example 2: Price 50 m² of brickwork at Ksh 1,200 per m².

Given: Quantity = 50 m², Rate = Ksh 1,200/m²
Cost = 50 × 1,200
Cost = Ksh 60,000
Answer: Ksh 60,000

Example 3: Price 25 m length of steel reinforcement bars at Ksh 120 per meter.

Given: Quantity = 25 m, Rate = Ksh 120/m
Cost = 25 × 120
Cost = Ksh 3,000
Answer: Ksh 3,000

Example 4: Price a plastering area of 40 m² at Ksh 350 per m².

Given: Quantity = 40 m², Rate = Ksh 350/m²
Cost = 40 × 350
Cost = Ksh 14,000
Answer: Ksh 14,000

Example 5: Calculate total cost for 15 m³ excavation at Ksh 800 per m³ plus 10% contingency.

Given: Quantity = 15 m³, Rate = Ksh 800/m³
Base cost = 15 × 800 = Ksh 12,000
Contingency = 10% of 12,000 = Ksh 1,200
Total cost = 12,000 + 1,200 = Ksh 13,200
Answer: Ksh 13,200

Example 6 (Kenyan Context): Price 20 m³ of ready-mix concrete supplied by Bamburi Cement at Ksh 7,500 per m³.

Given: Quantity = 20 m³, Rate = Ksh 7,500/m³
Cost = Quantity × Rate
Cost = 20 × 7,500
Cost = Ksh 150,000
Answer: Ksh 150,000

Practice Questions

  1. Calculate the volume of a concrete footing measuring 2.5 m by 1.2 m by 0.4 m to be recorded on a billing sheet. (5 marks)
  2. Transfer the following quantities from billing sheets to a bill of quantities: 20 m² plastering, 5 m³ concrete, and 30 m brickwork. (6 marks)
  3. Price 18 m³ of hardcore at Ksh 1,000 per m³ and add 5% for wastage. (5 marks)
  4. A wall measures 12 m by 3 m with two window openings each 1 m by 1.5 m. Calculate the net wall area for billing. (6 marks)
  5. Price 40 m² of floor tiling at Ksh 1,500 per m² including a 7.5% contractor’s profit. (6 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒5.2 Emerging technologies

Emerging technologies are transforming the quantity surveying profession in Kenya by enhancing accuracy, efficiency, and collaboration in measuring building works. These technologies enable quantity surveyors to manage complex projects with real-time data and…

Chapter Summary

This chapter focused on the detailed process of preparing and managing bill measured quantities in building works. It began with the preparation of billing sheets or papers, emphasizing the accurate recording of quantities for various construction items. The transfer of these booked quantities into organized documents was discussed to ensure clarity and proper tracking. Attention was then given to the price bill of quantities, which involves assigning costs to the measured quantities to facilitate budgeting and payment. The chapter also explored emerging technologies transforming quantity measurement practices, starting with Building Information Modeling (BIM), which enhances precision and visualization. Cloud-based collaboration platforms were highlighted for their role in improving communication and data sharing among project stakeholders. The use of Artificial Intelligence and Machine Learning was presented as a means to automate and optimize quantity surveying tasks. Finally, mobile technology was recognized for enabling real-time data capture and remote access to measurement information on construction sites.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A billing sheet records 250 m² of wall plastering. If the plastering rate is Ksh 450 per m², calculate the total cost for plastering. (2 marks)

  2. During measurement transfer, a booked quantity of 120 m³ of concrete was recorded. If the unit price is Ksh 9,800 per m³, what is the total price for this quantity? (2 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the purpose of a billing sheet in the preparation of a bill of quantities for a commercial office block in Nairobi. (4 marks)
  2. Describe the process of transferring booked quantities from field measurement notes to the billing sheet. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Preparation of billing sheet quantities for a single room masonry wall

Quantity Survey · Level 6
Measurement Of Building Works I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a billing sheet for masonry wall quantities of a single room measuring 4500mm length, 3000mm width, and wall thickness 230mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Billing Sheet Paper
Builder's Square
Spirit Level
Pencil
Calculator
Scale Ruler (metric)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Builder's Square1 Pc per Candidate
3Spirit Level1 Pc per Candidate
4Pencil1 Pc per Candidate
5Billing Sheet Paper1 Sheet per Candidate
6Calculator1 Pc per Candidate
7Scale Ruler (metric)1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PREPARATION AND MEASUREMENT
Identified and used appropriate PPE including helmet, safety boots, and reflective vest
(Award 1 mark each for helmet, boots, vest)
3
Assembled all necessary tools and materials before starting measurement
(Award 2 marks for assembling all required tools and materials)
2
Measured wall length, width, and thickness accurately within ±10mm tolerance
(Award 1 mark each for length, width, thickness, and overall accuracy)
4
Checked squareness of wall corners using builder's square
(Award 2 marks for correct use and result within ±10mm tolerance)
2
Recorded all measurements clearly and correctly on the billing sheet
(Award 1 mark each for clarity, correctness, and completeness)
3
Calculated wall area and volume accurately using measurements
(Award 4 marks for correct calculation of area and volume)
4
Completed the billing sheet quantities with correct units and format
(Award 2 marks for correct and neat presentation on billing sheet)
2
Sub-Total20
PRODUCT CHECKLIST
Billing sheet quantities accurately reflect wall dimensions: length 4500mm, width 3000mm, thickness 230mm
(Award 5 marks for correct and accurate dimensions matching drawing)
5
Wall area and volume calculations are correct within ±2% tolerance
(Award 5 marks for accurate calculations within tolerance)
5
Billing sheet is neat, clear, and properly formatted for submission
(Award 5 marks for overall neatness and proper formatting)
5
Sub-Total15
GRAND TOTAL35
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Transfer of Measured Quantities from Field Notes to Billing Sheet

Quantity Survey · Level 6
Measurement Of Building Works I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Transfer the measured quantities of concrete, masonry, and excavation works from the provided field notes into the billing sheet ensuring accuracy and consistency.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Field Note Book
CalculatorBilling Sheet (printed template)
Ruler (30cm)
Pens (Blue and Black)
Clipboard
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Field Note Book1 Pc per Candidate
3Billing Sheet (printed template)1 Pc per Candidate
4Pens (Blue and Black)1 Set per Candidate
5Calculator1 Pc per Candidate
6Ruler (30cm)1 Pc per Candidate
7Clipboard1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: TRANSFER OF BOOKED QUANTITIES
Identified and used appropriate PPE (helmet, boots, reflective jacket)
(Award 1 mark for each correctly worn PPE)
3
Assembled all necessary tools and materials before starting
(Award 0.5 marks for each correctly assembled item, max 2 marks)
2
Reviewed field notes for completeness and clarity
(Award 1 mark for checking each of the 3 main work categories: concrete, masonry, excavation)
3
Accurately transferred concrete quantities to billing sheet
(Award 1 mark for each correct concrete item quantity transferred, 5 items total)
5
Accurately transferred masonry quantities to billing sheet
(Award 1 mark for each correct masonry item quantity transferred, 5 items total)
5
Accurately transferred excavation quantities to billing sheet
(Award 1 mark for each correct excavation item quantity transferred, 3 items total)
3
Performed calculations correctly (e.g. additions, unit conversions)
(Award 1 mark per correct calculation, max 4 marks)
4
Reviewed the completed billing sheet for consistency and errors
(Award 1 mark for each of three error checks: totals, units, item descriptions)
3
Sub-Total28
PRODUCT CHECKLIST
Billing sheet quantities match field note quantities within ±1% tolerance
(Award 2 marks for each category: concrete, masonry, excavation and 2 marks for overall consistency)
8
Billing sheet is neat, legible, and correctly formatted
(Award 2 marks for neatness and 2 marks for correct formatting)
4
All required fields on the billing sheet are correctly completed
(Award 1 mark for each completed section: header, item description, quantity, unit price, total cost)
5
Sub-Total17
GRAND TOTAL45
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Pricing Bill of Quantities for a Small Residential WallPractical 3
🔒Extract and quantify building components for bill preparation using BIM softwarePractical 4
🔒Collaborate on Bill of Quantities Using Cloud-Based PlatformPractical 5
🔒Automate Quantity Takeoff and Error Detection Using AI/ML SoftwarePractical 6
🔒On-site Quantity Measurement and Billing Sheet Update Using Mobile TechnologyPractical 7
🔒Integration of BIM Models with Cloud Collaboration for Bill of Quantities PreparationPractical 8
🔒Verification and Cross-Checking of Billing Sheets for Building WorksPractical 9
🔒Application of Emerging Technologies in Quantity Measurement for a 5m x 4m WallPractical 10
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Prepare billing papers using the standard format with confidence.
  • Transfer abstracted quantities and their descriptions accurately by following the correct procedures.
  • Carry out casting up correctly according to standard operating procedures.
  • Price the bill of quantities accurately and efficiently using the right methods.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.