By the end of this chapter, you will be able to:
Mastering these skills will help you deliver precise and reliable survey results, which are essential for successful engineering projects.
Surveying earthworks is a fundamental task for quantity surveyors involved in construction projects across Kenya. Accurate measurement and assessment of earthworks ensure that project estimates, cost control, and material management are effectively managed. This chapter focuses on the essential tools and equipment used in surveying earthworks, highlighting their specifications and practical applications in the Kenyan construction industry.
Surveying earthworks demands precision and reliability, which depends heavily on selecting the appropriate tools and equipment. Quantity surveyors must be conversant with the types and uses of surveying rods, levelling instruments, and measuring tools to perform accurate site assessments and volume calculations. These tools are vital for setting out, monitoring progress, and verifying earthworks quantities on construction sites such as county government infrastructure projects or commercial developments.
Surveying rods are essential for establishing reference points and measuring vertical distances on a construction site. Their role is critical in determining levels and gradients, which underpin earthworks calculations.
Surveying rods come in various types designed for specific tasks:
Surveying rods are constructed from materials that balance durability and weight:
| Name | Specification | Use |
|---|---|---|
| Levelling Rod | Graduated to millimetres, telescopic | Measuring vertical height differences |
| Range Pole | 2-3 meters long, fluorescent paint | Marking straight lines and alignments |
| Grade Rod | Graduated, with bubble vial | Setting and checking levels on earthworks |
| Measuring Rod | Fixed length, rigid | Short distance measurement and offsets |
| Target Rod | Reflective target attachment | Enhancing EDM device accuracy |
Levelling instruments are central to establishing accurate height measurements and gradients essential for earthworks planning and verification. Quantity surveyors rely on these instruments to determine cut and fill volumes critical in budgeting and project control.
Several types of levelling instruments are used in Kenyan construction projects, each suited for different accuracy levels and site conditions:
| Name | Specification | Use |
|---|---|---|
| Dumpy Level | Magnification 20x, 30m telescope | General levelling and height measurement |
| Automatic Level | Compensator accuracy ±0.5mm/km | Precise levelling with reduced operator error |
| Laser Level | Laser class 2, range up to 500m | Fast establishment of horizontal planes |
| Digital Level | Electronic readout ±0.3mm accuracy | Accurate height difference measurement |
| Water Level | Transparent tubing, water column | Basic levelling in restricted or uneven sites |
Measuring tools complement levelling instruments by enabling accurate distance and angle measurements, which are vital in delineating earthworks boundaries and calculating material volumes.
Various measuring tools are used in earthworks surveying, each suited for specific measurement tasks:
| Name | Specification | Use |
|---|---|---|
| Measuring Tape | Steel/fibreglass, lengths 30-100m | Measuring linear distances and offsets |
| Total Station | Angular accuracy ±2 arc seconds | Measuring distances and horizontal/vertical angles |
| Measuring Wheel | Wheel diameter ~300mm | Measuring long distances quickly |
| Clinometer | Accuracy ±0.5 degrees | Measuring slope angles |
| Plumb Bob | Brass or steel, 100-200g | Establishing vertical reference lines |
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter provided a detailed overview of the essential tools and equipment used in surveying earthworks, including surveying rods for measuring elevations, levelling instruments for determining height differences, and various measuring tools necessary for accurate data collection. It then explored the methods of earthworks measurement, focusing on the processes of calculating cuts, fills, and the combined cut and fill operations that are critical for shaping the terrain to design specifications. The chapter emphasized the importance of precise measurement techniques to ensure balance between excavation and embankment, which optimizes resource use and project costs. Finally, it addressed the significance of thorough earthworks documentation, highlighting how accurate records support project monitoring, quality assurance, and future reference. Throughout the chapter, the integration of these components demonstrated the comprehensive approach required for effective surveying in earthworks projects.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Hard hat | |
| Safety boots | |
| Reflective safety vest | |
| Dumpy level | |
| Levelling staff | |
| Tripod stand | |
| Measuring tape 30m | |
| Plumb bob | |
| Chalk line reel | |
| Field book | |
| Pencil |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Hard hat | 1 Pc per Candidate |
| 2 | Safety boots | 1 Pair per Candidate |
| 3 | Reflective safety vest | 1 Pc per Candidate |
| 4 | Dumpy level | 1 Pc per Candidate |
| 5 | Levelling staff | 1 Pc per Candidate |
| 6 | Tripod stand | 1 Pc per Candidate |
| 7 | Measuring tape 30m | 1 Pc per Candidate |
| 8 | Plumb bob | 1 Pc per Candidate |
| 9 | Chalk line reel | 1 Pc per Candidate |
| 10 | Field book | 1 Pc per Candidate |
| 11 | Pencil | 2 Pcs per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identification and Handling of Surveying Earthworks Tools | |||
| Used appropriate PPEs: hard hat, safety boots, reflective vest (Award 1 mark for each correct PPE used) | 3 | ||
| Prepared and cleared site sufficiently for setting up the dumpy level (Award 1 mark for correct site clearance) | 1 | ||
| Identified the levelling tools correctly: dumpy level, levelling staff, tripod stand (Award 1 mark each for correct identification of each tool) | 3 | ||
| Set up the dumpy level correctly: positioned tripod, leveled instrument, established plumbness (Award 1 mark for each correct setup step) | 3 | ||
| Positioned the levelling staff vertically with accurate plumbness (Award 2 marks for correct vertical positioning) | 2 | ||
| Obtained three accurate staff readings using the dumpy level (Award 1 mark for each correct staff reading) | 3 | ||
| Booked readings accurately in the field book (Award 2 marks for correctly recorded data) | 2 | ||
| Disassembled and stored equipment following standard procedures (Award 1 mark for proper disassembly and storage) | 1 | ||
| Sub-Total | 18 | ||
| PRODUCT CHECKLIST | |||
| Correct identification and selection of all surveying earthworks tools and equipment (Award 5 marks for complete and accurate identification and selection) | 5 | ||
| Sub-Total | 5 | ||
| GRAND TOTAL | 23 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Surveying rod | Reflective safety vest |
| Tripod for surveying rod | Safety helmet |
| Plumb bob | Safety boots |
| Measuring tape 30m |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Surveying rod | 2 Pcs per Candidate |
| 2 | Tripod for surveying rod | 1 Pc per Candidate |
| 3 | Plumb bob | 1 Pc per Candidate |
| 4 | Measuring tape 30m | 1 Pc per Candidate |
| 5 | Reflective safety vest | 1 Pc per Candidate |
| 6 | Safety helmet | 1 Pc per Candidate |
| 7 | Safety boots | 1 Pair per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Set up surveying rods and take measurements | |||
| Used the appropriate PPE: Safety helmet, Safety boots, Reflective vest (Award 1 mark each for any correct PPE used) | 3 | ||
| Prepared the site location for setting up surveying rods by clearing obstacles (Award 1 mark for correct site clearance) | 1 | ||
| Identified and assembled surveying rods, tripod, and plumb bob correctly (Award 1 mark each for correct identification and assembly of rods, tripod, and plumb bob) | 3 | ||
| Set up the surveying rod on the tripod ensuring verticality using the plumb bob (Award 1 mark each for verticality, tripod stability, and correct positioning) | 3 | ||
| Held the second surveying rod vertically at each measurement point ensuring plumbness (Award 2 marks for accurate vertical positioning of the rod at points) | 2 | ||
| Took vertical height readings correctly at three points spaced 10m apart (Award 1 mark each for each correctly taken reading) | 3 | ||
| Recorded all measurements accurately in the provided record sheet (Award 2 marks for complete and accurate booking of readings) | 2 | ||
| Sub-Total | 17 | ||
| PRODUCT CHECKLIST | |||
| Surveying rods set up plumb and stable; measurements taken at correct intervals (10m) with accurate vertical readings (Award 8 marks for correct setup, spacing, and accurate readings within ±5mm tolerance) | 8 | ||
| Sub-Total | 8 | ||
| GRAND TOTAL | 25 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.