Quantity Survey  ·  Level 6
Building Construction Works I
Chapter 3: Perform superstructure works
📚 8 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Set out superstructure works correctly according to the job requirements.
  • Carry out superstructure concrete works accurately and safely.
  • Construct superstructure walling following the working drawings with precision.
  • Build roof structures accurately by interpreting and following working drawings.
  • Apply roof covering materials correctly according to the design specifications.
  • Construct eaves and verges properly following the design specifications.
  • Install rainwater goods correctly using proper work procedures.
  • Perform all superstructure works accurately and confidently according to job requirements.

Mastering these skills will help you build strong, safe, and durable structures that meet professional standards in the construction trade.

Performing superstructure works is a crucial phase in building construction that directly affects the structural integrity and longevity of a building. For quantity surveyors in Kenya, understanding the technical processes involved in superstructure works enables accurate cost estimation, progress monitoring, and quality assurance. This chapter focuses on setting out the superstructure, concrete works including columns, slabs, beams, formwork, reinforcement, and curing practices that ensure durability and compliance with Kenyan construction standards.

3.1 Setting out superstructure works

Setting out is the process of transferring the building design from the drawings to the ground, marking the exact locations where structural elements will be constructed. For quantity surveyors, precise setting out is essential to quantify materials accurately and identify potential design or site conflicts early. In Kenyan construction projects, such as county government office buildings, errors in setting out can lead to costly rework and delays.

3.1.1 Purpose and importance of setting out

The purpose of setting out is to provide a physical reference for construction teams that aligns exactly with the architectural and structural plans. Its importance includes:

  • Ensuring dimensional accuracy: Correct positioning prevents structural misalignment, which can compromise stability and aesthetics.
  • Facilitating coordination: Clear layout points help different trades work efficiently without clashes.
  • Reducing wastage: Accurate measurements minimize excess material orders, saving costs.
  • Supporting quality control: Survey data helps verify compliance with design specifications.
  • Enabling progress tracking: Quantity surveyors rely on setting out benchmarks to measure work advancement during site visits.

3.1.2 Tools and equipment used in setting out

The tools for setting out superstructure works must provide precision and durability under Kenyan site conditions. Common tools include:

  • Theodolite: Measures horizontal and vertical angles for accurate positioning.
  • Total Station: Combines electronic distance measurement and angular readings for detailed site layout.
  • Measuring tapes and steel rulers: Basic tools for short distance verification.
  • Plumb bobs and spirit levels: Ensure vertical and horizontal alignment of setting points.
  • Marking materials: Paint, pegs, and string lines indicate exact locations on the ground.

3.1.3 Procedures for setting out superstructure works

Setting out follows a systematic sequence to transfer design points accurately:

  1. Review design drawings: Verify all dimensions and structural elements relevant to the superstructure.
  2. Establish control points: Use existing site benchmarks or create new ones with GPS or total stations.
  3. Mark grid lines: Set perpendicular baseline lines using string and pegs based on control points.
  4. Locate column positions: Measure from grid lines to mark column centres with stakes or paint.
  5. Check levels and elevations: Use spirit levels or laser levels to confirm vertical positioning.
  6. Record measurements: Document all set out data for verification and future reference.

3.1.4 Challenges in setting out and mitigation strategies

Setting out can face several challenges that affect accuracy and timeliness:

  • Uneven terrain: Slopes and irregular ground surfaces complicate marking; use laser levels and adjust stakes accordingly.
  • Weather conditions: Rain or strong winds can wash away markings; apply durable paint and secure pegs firmly.
  • Human error: Misreading measurements leads to errors; cross-check dimensions with multiple tools and personnel.
  • Obstructions: Existing site structures may block access; plan alternative routes and use GPS for indirect measurements.
  • Communication gaps: Misunderstandings between surveyors and builders cause mistakes; hold regular coordination meetings to clarify points.
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Superstructure concrete works

Concrete forms the backbone of superstructure elements such as columns, beams, and slabs. Quantity surveyors must understand the properties and handling of concrete to estimate material quantities, assess quality, and monitor compliance with Kenyan building co…

🔒3.3 Sustainability and Greening in Concrete Building Elements

In Kenya’s construction industry, sustainability and greening practices in concrete building elements have become critical due to increasing environmental awareness and regulatory demands. Quantity surveyors play a key role in promoting sustainable constructio…

🔒3.4 Alternative Cementitious Materials

The use of alternative cementitious materials (ACMs) is gaining momentum in Kenya’s construction sector as a viable approach to reduce the environmental footprint of concrete. These materials partially replace Portland cement in concrete mixes, reducing CO2 em…

🔒3.5 Superstructure Walling

Superstructure walling is a critical phase in building construction, defining the vertical enclosure and stability of the structure above the foundation. For quantity surveyors in Kenya, understanding the functional requirements, types, materials, and modern p…

🔒3.6 Roof Construction

In the practice of quantity surveying within Kenya, understanding roof construction is essential due to its significant impact on project cost management, material specification, and quality assurance. Roofs protect buildings from weather elements and contribu…

🔒3.7 Roof Cover

The selection and installation of roof cover materials are critical components in building superstructure works, especially for quantity surveyors who must accurately estimate costs and ensure quality standards are met. In Kenya, roof covers must withstand div…

🔒3.8 Rain Water Goods Installation

In building construction, effective rainwater goods installation is essential to protect the superstructure and foundations from water damage. For quantity surveyors in Kenya, understanding the specification, installation, and cost implications of rainwater go…

Chapter Summary

This chapter covers the essential processes involved in performing superstructure works, beginning with the precise setting out of superstructure elements to ensure accurate construction alignment. It details the concrete works for columns, suspended slabs, and beams, emphasizing proper formwork, reinforcement placement, and curing techniques to achieve structural integrity. The chapter highlights sustainability initiatives in concrete building elements, exploring alternative cementitious materials such as fly ash, slag cement, silica fume, and calcined clay, including innovations like high-performance and self-healing concrete. Superstructure walling is examined with attention to functional requirements, various wall construction methods and materials, damp proofing, and emerging green building practices including smart walls and modular construction. Roof construction is explained through its functional requirements, material selection, types, and step-by-step construction procedures. The discussion extends to roof covers, covering traditional and modern materials, underlays, installation methods, and sustainability considerations like energy efficiency and water harvesting. Finally, the installation of rainwater goods such as gutters, downpipes, channels, and fulbora is addressed to ensure proper water management in building structures.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of setting out superstructure works on a construction site? (2 marks)
  2. Identify three key factors to consider when selecting formwork for concrete columns. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the importance of accurate setting out in superstructure works and its impact on quantity surveying cost control at a county government office construction site. (4 marks)
  2. Describe the key quality checks a quantity surveyor should verify during concrete pouring in columns at a commercial building project. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Setting out superstructure layout for a single-storey building

Quantity Survey · Level 6
Building Construction Works I
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Set out the superstructure layout for a single-storey building with external dimensions 8000mm x 6000mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Lime Powder
Spirit LevelNails 2 inch
Builder's Square
Plumb Bob
Profile Boards
Hammer
Pens
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Spirit Level1 Pc per Candidate
3Builder's Square1 Pc per 4 Candidates
4Plumb Bob1 Pc per Candidate
5Profile Boards (2m length)4 Pcs per Candidate
6Hammer1 Pc per 4 Candidates
7Lime PowderSufficient per Candidate
8Nails 2 inchSufficient per Candidate
9Pens1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SITE PREPARATION AND SETTING OUT
Identified and used appropriate PPE as per safety regulations
(Award one mark for each PPE donned as per workplace)
5
Assembled required tools and materials before starting work
(Award 1/2 mark for each correctly assembled tool/material up to 6 items)
3
Prepared the site by clearing and leveling the working area
(Award 2 marks for each correct activity)
4
Positioned and fixed profile boards accurately at corners as per plan dimensions
(Award 1 mark for each correctly positioned profile board)
6
Set out the layout accurately using measuring tape and builder’s square
(Award 1 mark for each correctly measured side and corner alignment)
6
Transferred measurements to profile boards with builder’s line and plumb bob
(Award 1 mark for each accurate transfer to all four corners)
6
Marked the layout lines clearly on the ground using lime powder
(Award 1 mark for each correctly marked corner line)
4
Cleaned the working area after completion of setting out
(Award 2 marks for thorough cleaning)
2
Cleaned and stored tools and materials correctly after use
(Award 1 mark for cleaning and 1 mark for proper storing)
2
Sub-Total38
PRODUCT CHECKLIST
Layout dimensions match specified external measurements of 8000mm x 6000mm within ±50mm tolerance
(Award 2 marks for each dimension within tolerance)
4
Layout is squared with diagonals equal within ±10mm tolerance
(Award 4 marks for correct squareness)
4
Profile boards are correctly positioned and firmly fixed according to the layout plan
(Award 1 mark for each correctly fixed board)
4
Layout lines are clearly marked and visible with no smudging or incorrect markings
(Award 3 marks for neat and accurate marking)
3
Layout is parallel and level relative to the datum line within ±10mm tolerance
(Award 3 marks for correct alignment and level)
3
Complete and accurate set out of the superstructure layout as per setting out procedure
(Award 5 marks for above 75% complete, 3 marks for 50-75%, 2 marks for 50%)
4
Sub-Total22
GRAND TOTAL60
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Erect and strike formwork for a reinforced concrete column 300mm x 300mm x 1500mm

Quantity Survey · Level 6
Building Construction Works I
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Erect and strike formwork for a reinforced concrete column 300mm x 300mm x 1500mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring Tape (5m)Nails 2"
Spirit LevelBinding Wire
HammerTimber Boards 25mm thick
Builder's SquareWater
Plumb Bob
Cutting Tool / Pliers
Bending Tool
Trowel and Float Set
Pens
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring Tape (5m)1 Pc per Candidate
2Spirit Level1 Pc per Candidate
3Hammer1 Pc per 4 Candidates
4Builder's Square1 Pc per 4 Candidates
5Plumb Bob1 Pc per Candidate
6Cutting Tool / Pliers1 Pc per Candidate
7Bending Tool1 Pc per Candidate
8Trowel and Float Set1 Set per 4 Candidates
9Nails 2"Sufficient
10Binding Wire1 Kg per Candidate
11Timber Boards 25mm thick8m length per Candidate
12WaterSufficient
13Pens1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: PROCESS OBSERVATION
Identified and used PPEs in line with occupational safety and health regulations
(Award one mark for each PPE donned as per workplace)
5
Assembled tools and materials correctly as per the practical requirements
(Award 1/2 mark for each correctly assembled tool or material, max 3 marks)
3
Prepared the site by clearing and providing sufficient area for formwork erection
(Award 2 marks for clearing, 2 marks for sufficient area provision)
4
Set out the formwork layout accurately using measuring tape and builder's square
(Award 1 mark for each correct dimension and alignment)
4
Erected the formwork to the specified dimensions (300mm x 300mm x 1500mm) with vertical alignment
(Award 1 mark for each correctly dimensioned side, 2 marks for vertical alignment)
6
Provided firm and stable fixing/supports for the formwork
(Award 2 marks for stability, 2 marks for neat fixing)
4
Ensured neat and clean internal surfaces of the formwork
(Award 2 marks for clean and smooth internal surfaces)
2
Struck the formwork carefully after curing without damaging the concrete
(Award 3 marks for careful striking, 3 marks for no damage to concrete)
6
Cleaned and stored tools and materials properly after the task
(Award 1 mark each for cleaning and proper storing)
2
Sub-Total36
PRODUCT CHECKLIST
Formwork dimensions are accurate (300mm x 300mm x 1500mm) within ±50mm tolerance
(Award 1 mark for each dimension within tolerance)
4
Formwork is vertical and plumb within ±10mm tolerance
(Award 3 marks for plumbness within tolerance)
3
Formwork corners are square and aligned properly
(Award 1 mark for each correctly squared corner)
3
Formwork supports are firm and stable with no displacement
(Award 3 marks for stability and firmness)
3
Internal surfaces are smooth and clean without debris
(Award 2 marks for neat internal surface finish)
2
Concrete surface remained intact and undamaged after striking
(Award 3 marks for no cracks or damage)
3
Overall neatness and workmanship of the formwork
(Award 2 marks for neat and professional finish)
2
Sub-Total20
GRAND TOTAL56
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Reinforcement fixing for a reinforced concrete column 300mm x 300mm x 1500mmPractical 3
🔒Concrete Mixing and Pouring for a Reinforced Concrete ColumnPractical 4
🔒Reinforcement Fixing for Suspended Slabs and BeamsPractical 5
🔒Concrete mixing and pouring for suspended slab and beamPractical 6
🔒Concrete curing for a 1m x 1m x 0.15m slabPractical 7
🔒Prepare and Demonstrate Sustainable Concrete Mix Incorporating Alternative Cementitious MaterialsPractical 8
🔒Walling layout and setting out on foundationPractical 9
🔒Construction of a 1.5m Long 230mm Thick Brick Wall SectionPractical 10
🔒Apply damp proofing treatment on a 3000mm x 3000mm masonry wallPractical 11
🔒Construct an Eco-Friendly Prefabricated Wall 3000mm x 250mm x 2400mmPractical 12
🔒Assembly of Timber Roof Truss Frame 4.5m SpanPractical 13
🔒Installation of Corrugated Iron Sheet Roof Covering 4m x 3mPractical 14
🔒Installation of rainwater goods for roof drainagePractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 16 questions Start quiz ▾
0%
0 / 2
🔒

14 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Set out superstructure works correctly according to the job requirements.
  • Carry out superstructure concrete works accurately and safely.
  • Construct superstructure walling following the working drawings with precision.
  • Build roof structures accurately by interpreting and following working drawings.
  • Apply roof covering materials correctly according to the design specifications.
  • Construct eaves and verges properly following the design specifications.
  • Install rainwater goods correctly using proper work procedures.
  • Perform all superstructure works accurately and confidently according to job requirements.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.