Plumbing  ·  Level 5
Fire Control Systems
Chapter 1: Prepare fire control system schematic drawing
📚 7 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Wear the correct personal protective equipment safely for the job.
  • Select the appropriate working drawings needed for your fire control system task.
  • Choose the right drawing instruments based on the specific drawing requirements.
  • Accurately convert measurements using the drawing scale.
  • Identify fire control system symbols following standard industry practices.
  • Sketch the fire control system correctly according to the job requirements.

Mastering these skills ensures you create clear, precise fire control system drawings that help keep buildings safe and protect lives.

Compiled by: Elijah Kiprono

Fire control systems are critical components in plumbing installations within Kenyan buildings, ensuring safety by managing fire risks through early detection, suppression, and containment. Preparing accurate schematic drawings for these systems is an essential skill for plumbing professionals, as it guides installation, maintenance, and compliance with regulatory standards. This chapter equips learners with the foundational terminology and concepts necessary to design and interpret fire control system schematics effectively.

1.1 Terms and Concepts

The foundation of preparing fire control system schematic drawings lies in understanding the key terms and concepts used throughout the design and implementation process. In the Kenyan plumbing context, these terms ensure clear communication among designers, installers, and regulatory bodies such as the National Construction Authority and the Fire Risk Reduction Committees. Mastery of these terms facilitates compliance with Kenya Building Code and enhances safety outcomes in various sectors including hospitals, schools, and county government offices.

1.1.1 Fire Detection Devices

Fire detection devices are integral to fire control systems, providing the initial alert to the presence of fire hazards. Kenyan plumbing professionals must understand these devices to integrate them effectively within water-based fire suppression systems such as sprinklers.

  • Smoke Detectors detect smoke particles in the air and activate alarms or suppression systems, crucial in environments like hospitals where early detection saves lives.
  • Heat Detectors respond to temperature rises, useful in kitchens and boiler rooms where smoke may be present but not necessarily indicative of fire.

Ceiling-mounted heat detector device
Ceiling-mounted heat detector device (Source: Wikipedia (Heat detector))

  • Flame Detectors sense infrared or ultraviolet radiation emitted by flames, often deployed in industrial settings with high fire risks.
  • Manual Call Points allow occupants to trigger alarms manually, important in public buildings like schools and hotels.

Red manual call point on wall with fire action notice
Red manual call point on wall with fire action notice (Source: Wikimedia Commons)

  • Combination Devices integrate smoke, heat, and flame detection to enhance reliability across varied settings.

1.1.2 Fire Suppression Systems

Understanding fire suppression systems is vital for plumbing professionals tasked with designing water-based fire control schematics. These systems actively control or extinguish fires once detected.

A fire suppression system layout in a building
A fire suppression system layout in a building (Source: fire_control (1))

  • Sprinkler Systems automatically discharge water through piping networks when heat triggers activation, common in commercial buildings.

  • Hydrant Systems provide accessible water outlets for firefighting personnel, essential in retail businesses and large institutions.

  • Foam Systems mix foam concentrate with water to suppress fires involving flammable liquids, used in fuel stations and industrial facilities.
  • Water Mist Systems release fine water droplets that cool fire and displace oxygen, suitable for sensitive environments like data centers.
  • Deluge Systems deliver large volumes of water immediately upon detection, protecting high-hazard areas such as chemical storage rooms.

1.1.3 Fire Control System Components

A schematic drawing must detail all components making up the fire control system, ensuring clarity for installation and maintenance.

  • Piping and Valves transport and regulate water flow; materials and sizing adhere to standards such as BS EN 12845.
  • Control Panels manage detection signals and system activation, typically installed in accessible locations within buildings like county government offices.

A fire alarm system layout
A fire alarm system layout (Source: fire_control (1))

  • Alarm Devices include sirens and strobe lights alerting occupants, critical in densely populated areas such as universities.

  • Water Supply Sources such as tanks or mains connections must be clearly indicated, with capacity considerations reflecting building size.

  • Pressure and Flow Sensors monitor system integrity and performance, enabling early detection of faults or leaks.

1.1.4 Standards and Codes

Compliance with national and international standards is mandatory for fire control system schematics, ensuring safety and legal adherence in Kenya.

  • Kenya Building Code (KBC) outlines minimum requirements for fire safety integration in plumbing designs.
  • BS EN 12845 specifies design and installation standards for sprinkler systems.
  • ISO 7240 Series covers fire detection and alarm systems, providing guidelines for device placement and performance.
  • National Fire Protection Association (NFPA) Standards offer internationally recognized best practices, often referenced in Kenyan projects.
  • Water Supply Regulations dictate minimum water pressure and quality for fire systems, enforced by Water Services Regulatory Board (WASREB).

Practice Questions

  1. Define and explain the function of at least three types of fire detection devices used in plumbing fire control systems. (10 marks)

  2. List and describe five components that must be included in a fire control system schematic drawing for a commercial building. (10 marks)

  3. Identify and explain the importance of two key standards or codes that influence fire control system design in Kenya. (10 marks)

  4. Describe the differences between sprinkler and deluge fire suppression systems, including typical applications for each. (10 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Personal protective equipment's

Personal protective equipment (PPE) is essential for plumbing professionals engaged in preparing fire control system schematic drawings, especially when working on-site where hazards such as sharp tools, chemicals, and electrical components are present. In Ken…

🔒1.3 Working drawings

Working drawings are essential in plumbing fire control system projects within Kenya. These drawings provide the detailed and precise information necessary for installation, inspection, and maintenance of fire control plumbing systems in buildings and faciliti…

🔒1.4 Drawing instruments

In the preparation of fire control system schematic drawings, the choice and use of appropriate drawing instruments are critical. Plumbing professionals in Kenya must understand the correct tools to ensure precision, clarity, and compliance with standards such…

🔒1.5 Measurements conversion

In plumbing-related fire control systems, precise measurements are crucial for designing and installing equipment such as sprinkler heads, pipe diameters, and valve placements. Kenyan plumbing professionals often work with both metric and imperial units, as so…

🔒1.6 Symbols

In preparing fire control system schematic drawings, the use of standard symbols is essential for clear communication and compliance with Kenyan and international standards. Plumbing professionals must be able to recognize, apply, and interpret these symbols a…

🔒1.7 Fire control system sketching

Fire control system sketching is an essential skill for plumbing professionals involved in the design, installation, and maintenance of fire protection infrastructure in Kenya. Sketching provides a quick, clear, and practical means to communicate the layout an…

Chapter Summary

This chapter introduced key terms and concepts essential for understanding fire control systems, providing a foundation for accurate schematic drawing. It emphasized the importance of personal protective equipment to ensure safety while working on fire control installations. The use of working drawings was explained as a critical step for planning and executing fire control system layouts. Essential drawing instruments were outlined to equip learners with the tools needed for precise drafting. The chapter also covered measurement conversions to enable accurate scaling and dimensioning of drawings. Standard symbols used in fire control system schematics were presented to ensure clarity and uniformity in communication. Finally, the chapter guided students through the process of sketching fire control systems, combining all previous elements into coherent and professional schematic drawings.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What does the term hydrant refer to in fire control systems? (2 marks)
  2. Identify three types of personal protective equipment essential when working on fire control systems. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Define the term hydrant system as used in fire control plumbing installations in Kenyan commercial buildings. (4 marks)
  2. List four types of personal protective equipment (PPE) essential for plumbers working on fire control systems. (4 marks)
🔒28 more in this section.

Chapter Practical Activities

Practical 1: Prepare and apply fire control system schematic symbols on a layout

Plumbing · Level 5
Fire Control Systems
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a fire control system schematic drawing of a pipe run layout measuring 1200mm by 900mm using standard fire control system symbols as per the provided symbol chart.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Drawing boardTracing paper A3 size
T-square rulerFire control system symbol chart
Set squares
Technical drawing pencils
Eraser
Sharpener
Tracing paper
Scale ruler
Drafting compass
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Fire control system symbol chart1 set per Candidate
2Drawing board1 Pc per Candidate
3T-square ruler1 Pc per Candidate
4Set squares (45° and 60°)1 set per Candidate
5Technical drawing pencils (2H, HB, 2B)1 set per Candidate
6Eraser and sharpener1 set per Candidate
7Tracing paper A3 size2 sheets per Candidate
8Scale ruler (metric)1 Pc per Candidate
9Drafting compass1 Pc per Candidate
10Personal Protective Equipment (overall, gloves, safety boots)1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and application of fire control system symbols
Used personal protective equipment (overall, gloves, safety boots)
(Award 1 mark for each PPE worn or zero = 3 marks)
3
Selected correct drawing tools and materials for the task
(Award 1 mark each for correctly selected tools and materials or zero = 3 marks)
3
Accurately set out the schematic drawing area to 1200mm by 900mm
(Award 4 marks for correct layout dimensions or zero)
4
Correctly identified and applied at least 10 standard fire control system symbols as per the symbol chart
(Award 1 mark for each correct symbol applied or zero)
10
Maintained neatness and clarity in symbol drawing and labelling
(Award 3 marks for clear and neat drawing or zero)
3
Used appropriate line types and weights for different components
(Award 3 marks for correct line usage or zero)
3
Sub-Total26
PRODUCT CHECKLIST
Schematic drawing area dimensioned correctly (1200mm x 900mm) within ±2mm tolerance
(Award 4 marks for correct dimensions or zero)
4
All applied symbols match standard fire control system symbols and are correctly oriented
(Award 6 marks for correct symbols matching standards or zero)
6
Drawing is complete, with all required symbols included and properly labelled
(Award 4 marks for completeness or zero)
4
Drawing is neat, legible, and professionally presented
(Award 4 marks for overall presentation or zero)
4
Sub-Total18
GRAND TOTAL44
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Prepare Basic Fire Control System Schematic Sketch

Plumbing · Level 5
Fire Control Systems
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare a basic fire control system schematic sketch illustrating pipe layout and key components with dimensions 600mm x 400mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Pipe wrenchGI Pipes
Pipe cutterGate valve
Pipe threading equipmentGI Tee
Measuring tapeGI Elbow
Drawing instrumentsFire sprinkler
Water tank
GI Back nut
GI Long nipple
Fire pump
Teflon tape
Non-return valve
Nipple
Union
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
119mm diameter GI Pipe2 M per Candidate
219mm diameter Gate valve1 Pc per Candidate
319mm diameter GI Tee1 Pc per Candidate
419mm diameter GI Elbow4 Pcs per Candidate
5Fire sprinkler2 Pcs per Candidate
6Water tank1 Pc per Candidate
719mm diameter GI Back nut2 Pcs per Candidate
819mm diameter GI Long nipple1 Pc per Candidate
9Fire pump (pump booster)1 Set per Candidate
10Teflon tapeSufficient per Candidate
11Non-return valve1 Pc per Candidate
12Nipple2 Pcs per Candidate
13Union2 Pcs per Candidate
14Personal Protective Equipment (Gloves, Overall, Industrial boots)Full gear per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Assembly
Used personal protective equipment (Gloves, Overall, Industrial boots)
(Award 1 mark for each PPE item worn or zero = 3 marks)
3
Cut pipes properly to accurate measurements without visible damage or cracks
(Award 2 marks or zero)
2
Connected fittings securely to pipes (Gate valve, Non-return valve)
(Award 1 mark for each fitting connected securely or zero)
4
Installed fire pump booster properly and powered
(Award 3 marks or zero)
3
Positioned water tank correctly
(Award 2 marks or zero)
2
Connected pipes properly to water supply and fire sprinklers
(Award 1 mark for each correct connection or zero)
4
Installed fire sprinkler system correctly
(Award 4 marks or zero)
4
Used piping tools and equipment correctly (Pipe wrench, Pipe threading equipment, Pipe cutter)
(Award 1 mark for each tool used correctly or zero)
3
Proper disposal of waste materials after task completion
(Award 2 marks or zero)
2
Sub-Total27
PRODUCT CHECKLIST
Schematic sketch with accurate dimensions: length 600 mm and width 400 mm (+/- 2 mm tolerance)
(Award 4 marks for correct dimensions or zero)
4
Schematic shows all key components (fire pump, water tank, gate valve, sprinklers, pipes) correctly positioned and labeled
(Award 3 marks for completeness or zero)
3
Drawing is neat, clear, and correctly annotated
(Award 3 marks for neatness and clarity or zero)
3
Sub-Total10
GRAND TOTAL37
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Prepare fire control system schematic drawing with accurate linesPractical 3
🔒Convert Real Measurements to Scaled Dimensions for Fire Control System SchematicPractical 4
🔒Produce a working drawing of a fire control system layoutPractical 5
🔒Interpret fire control system schematic drawing for installationPractical 6
🔒Prepare fire control system schematic drawing with component layoutPractical 7
🔒Prepare a detailed schematic drawing of a fire control system with measurement annotationsPractical 8
🔒Prepare and Dimension Fire Control System Schematic DrawingPractical 9
🔒Assemble fire control system schematic drawing with specified symbols and measurementsPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 18 questions Start quiz ▾
0%
0 / 2
🔒

16 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Wear the correct personal protective equipment safely for the job.
  • Select the appropriate working drawings needed for your fire control system task.
  • Choose the right drawing instruments based on the specific drawing requirements.
  • Accurately convert measurements using the drawing scale.
  • Identify fire control system symbols following standard industry practices.
  • Sketch the fire control system correctly according to the job requirements.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.