By the end of this chapter, you will be able to:
These skills are important because they help ensure the quality and safety of construction materials, which is essential for successful and durable building projects.
Compiled by: Simon Githaiga
Bitumen is a critical material in civil engineering, especially in road construction and maintenance. Its performance directly affects the durability and safety of pavements, making thorough testing essential. This chapter focuses on the identification and testing of bitumen to ensure it meets the required specifications for Kenyan infrastructure projects. Understanding the tests and the equipment involved enables engineers and technicians to verify quality and suitability for various applications.
Bitumen testing involves a range of procedures designed to determine its physical and chemical properties. These tests help ascertain the suitability of bitumen for specific environments and traffic conditions encountered on Kenyan roads. Proper identification of these tests is crucial for quality control in construction projects.
The penetration test measures the hardness or softness of bitumen by determining the depth a standard needle penetrates under specific conditions. This test is vital because it indicates the consistency of bitumen, which affects pavement flexibility and resistance to deformation.
| Name | Specification | Use |
|---|---|---|
| Penetrometer | Needle assembly with total moving mass of 100 g, dial reading in 0.1 mm | Measuring the depth of needle penetration |
| Standard needle | Hardened steel needle of specified point shape | Penetrating the bitumen sample |
| Sample container | Flat-bottomed metal cup about 55 mm diameter and 35 mm deep | Holding the bitumen sample |
| Water bath | Maintained at 25 ± 0.1°C | Bringing the sample to test temperature |
| Thermometer | Range 0 to 50°C, accurate to 0.1°C | Checking bath temperature |
| Timer | Accurate to 0.1 s | Timing the 5-second loading period |
Three penetration readings on a bitumen sample delivered to a contractor upgrading an access road for a district hospital were 63, 65 and 64 dmm. Find the penetration value and grade.
Penetration = Sum of readings ÷ Number of readings
Penetration = (63 + 65 + 64) ÷ 3
Penetration = 192 ÷ 3
Penetration = 64 dmm, so the bitumen is grade 60/70
The cleanliness test, also called the solubility test, determines the percentage of bitumen that dissolves in a solvent such as trichloroethylene or toluene, and therefore how much insoluble impurity, such as mineral matter, carbon or salts, the bitumen contains. Pure paving bitumen is almost entirely soluble, and specifications usually require at least 99% solubility, because impurities reduce the binding power of the bitumen and its adhesion to aggregates. The test is done by dissolving a weighed sample, filtering the solution through a weighed filter and weighing the insoluble residue left behind. Example: the materials laboratory of a road contractor working for Kenya Urban Roads Authority rejected a delivery of bitumen after the cleanliness test showed 98.2% solubility, below the specified minimum.
| Name | Specification | Use |
|---|---|---|
| Gooch crucible or sintered glass filter | With glass fibre filter pad | Retaining the insoluble residue |
| Conical flask | 125 ml, with stopper | Dissolving the sample in solvent |
| Solvent | Trichloroethylene or toluene, laboratory grade | Dissolving the bitumen |
| Analytical balance | Accurate to 0.001 g | Weighing sample and residue |
| Drying oven | Adjustable to about 110°C | Drying the crucible and residue |
| Desiccator | With drying agent | Cooling the crucible without absorbing moisture |
| Filter flask and vacuum | With adapter for the crucible | Speeding filtration |
A 2.000 g sample of bitumen left an insoluble residue of 0.012 g. Find the percentage insoluble and the solubility.
Insoluble % = (Mass of residue ÷ Mass of sample) × 100
Insoluble % = (0.012 ÷ 2.000) × 100
Insoluble % = 0.6%
Solubility = 100 − 0.6
Solubility = 99.4%, which meets a 99% minimum
Viscosity is the resistance of a liquid to flow, and for bitumen it describes how easily the binder can be pumped, sprayed and mixed with aggregates at working temperatures, and how well it resists flow in the pavement. The test is especially important for cutback bitumens and bitumen emulsions used in priming and surface dressing, whose viscosity at spraying temperature must be right for even coverage. For cutbacks and emulsions, viscosity is commonly measured with an efflux viscometer, such as the tar viscometer or Saybolt Furol viscometer, which records the time for a fixed volume to flow through a standard orifice, while penetration-grade bitumen may be tested with a rotational or capillary viscometer at 60°C and 135°C. Example: a contractor priming a new road in Kajiado County tested the MC-30 cutback prime to confirm it would flow and penetrate the base properly at the planned spraying temperature.
| Name | Specification | Use |
|---|---|---|
| Efflux (tar) viscometer | Cup with 4 mm or 10 mm orifice and ball valve | Measuring flow time of cutbacks and emulsions |
| Water bath | Maintained at 25°C, 30°C, 40°C or other specified temperature | Holding the sample at test temperature |
| Graduated receiver | Cylinder marked at 20 ml and 75 ml | Measuring the 50 ml flow volume |
| Stopwatch | Accurate to 0.1 s | Timing efflux |
| Thermometer | Accurate to 0.1°C | Checking sample and bath temperature |
| Rotational viscometer | With heated chamber, for penetration bitumen | Measuring viscosity at high temperatures |
The ductility test measures the ability of bitumen to stretch without breaking, indicating its flexibility. Flexibility is significant for accommodating pavement expansion and contraction due to temperature variations.
These tests determine the temperatures at which bitumen vapors ignite (flash point) and sustain combustion (fire point), essential for safe handling and storage.
To fully understand the safety implications, it is important to know how the flash and fire point tests are conducted. These procedures are standardized to ensure consistency and reliability in Kenyan laboratories such as those operated by the Kenya National Highways Authority (KeNHA).
The float test measures the consistency of bitumens that are too soft for the penetration test but too thick for an efflux viscosity test, such as some slow-curing cutbacks and road oils. A plug of bitumen is set in a brass collar screwed into the base of an aluminium float, chilled, and then floated on water at 50°C; as the plug warms and softens, water eventually forces its way through, and the time in seconds taken for this to happen is the float test value. A longer time indicates a stiffer material. Example: the laboratory of a county roads department in Nyandarua used the float test to check a slow-curing binder that gave penetration readings beyond the scale of its penetrometer.
| Name | Specification | Use |
|---|---|---|
| Aluminium float | Saucer-shaped float with threaded central opening | Floating the sample on water |
| Brass collar | Tapered collar about 22 mm long, screwed into the float | Holding the bitumen plug |
| Water bath | Maintained at 50 ± 0.5°C (or other specified temperature) | Softening the plug |
| Chilling bath | Iced water at about 5°C | Setting the plug before testing |
| Stopwatch | Accurate to 1 s | Timing water breakthrough |
| Brass plate and release agent | Flat plate with glycerine and talc | Base for filling the collar |
The loss on heating test measures the percentage of mass lost when bitumen is heated for a fixed time at a high temperature, usually 163°C for 5 hours in the thin film oven test or rolling thin film oven test. It simulates the hardening that occurs when bitumen is heated in the asphalt plant and laid on the road, as light oils evaporate and the binder oxidises. A large loss shows that the bitumen contains volatile fractions and will harden quickly, so specifications usually limit the loss to about 0.5% to 1% and also require a minimum retained penetration after heating. Example: the materials engineer for an asphalt plant supplying an airport apron rehabilitation tested each bitumen batch for loss on heating to make sure the binder would not become brittle soon after paving.
| Name | Specification | Use |
|---|---|---|
| Thin film oven | Ventilated oven with rotating shelf, maintained at 163 ± 1°C | Heating the sample uniformly |
| Sample pans | Flat-bottomed pans about 140 mm diameter | Holding the bitumen as a thin film |
| Analytical balance | Accurate to 0.001 g | Weighing before and after heating |
| Thermometer | Range up to 200°C | Checking oven temperature |
| Desiccator | With drying agent | Cooling pans before weighing |
A bitumen sample weighed 50.000 g before heating and 49.850 g after 5 hours at 163°C. Find the loss on heating.
Loss % = ((Mass before − Mass after) ÷ Mass before) × 100
Loss % = ((50.000 − 49.850) ÷ 50.000) × 100
Loss % = (0.150 ÷ 50.000) × 100
Loss % = 0.3%, which is within a 1% limit
Specific gravity measures the density of bitumen relative to water, influencing mix design and volumetric calculations in pavement construction.
SG = (C − A) ÷ [(B − A) − (D − C)]
A laboratory testing bitumen for a school access road recorded: A = 30.00 g, B = 80.00 g, C = 55.00 g and D = 80.40 g. Find the specific gravity.
SG = (C − A) ÷ [(B − A) − (D − C)]
SG = (55.00 − 30.00) ÷ [(80.00 − 30.00) − (80.40 − 55.00)]
SG = 25.00 ÷ [50.00 − 25.40]
SG = 25.00 ÷ 24.60
SG = 1.016
The softening point test determines the temperature at which bitumen softens enough to allow a steel ball to pass through it. This test is essential to understand bitumen's temperature susceptibility, particularly in Kenya's varying climates.
The spread rate, also called the rate of spray or application rate, is the quantity of bituminous binder applied per unit area of road surface, usually expressed in litres per square metre (L/m²), during priming, tack coating and surface dressing. Applying the correct rate is critical: too little binder fails to hold the chippings, causing stone loss, while too much causes bleeding and a slippery surface. The spread rate is checked on site with the tray test, in which shallow trays or pads of known area are placed in the path of the bitumen distributor, then weighed to find the binder deposited. Example: on a surface dressing contract for a rural road serving a tea estate in Kericho, the resident engineer carried out tray tests at the start of each day to confirm the distributor was spraying the designed 1.2 L/m².
| Name | Specification | Use |
|---|---|---|
| Metal trays or felt pads | Known area, for example 0.5 m × 0.5 m, numbered | Collecting sprayed binder |
| Weighing balance | Capacity about 10 kg, accurate to 1 g | Weighing trays before and after spraying |
| Thermometer | Range up to 200°C | Measuring binder temperature |
| Measuring tape | 30 m steel or fibreglass | Measuring sprayed length and width |
| Bitumen distributor | Spray bar with calibrated nozzles and dipstick | Applying the binder |
| PPE | Heat-resistant gloves, boots, overalls | Protecting staff from hot binder |
Spread rate (L/m²) = Volume of binder (L) ÷ Area (m²)
A tray measuring 0.5 m × 0.5 m collected 0.30 kg of binder. The density of the binder at spraying temperature is 0.97 kg/L. The design rate is 1.2 L/m². Find the spread rate, then estimate the binder cost for 1 km of road 7 m wide at the design rate if binder costs Ksh 120 per litre.
Area = 0.5 × 0.5 = 0.25 m²
Volume = Mass ÷ Density
Volume = 0.30 ÷ 0.97
Volume = 0.309 L
Spread rate = Volume ÷ Area
Spread rate = 0.309 ÷ 0.25
Spread rate = 1.24 L/m², slightly above the 1.2 L/m² design rate
Area of road = 1,000 × 7 = 7,000 m²
Binder required = 7,000 × 1.2 = 8,400 L
Cost = 8,400 × 120
Cost = Ksh 1,008,000
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covered the identification of various bitumen tests essential for assessing the quality and suitability of bitumen in construction. Key tests such as penetration, cleanliness, viscosity, ductility, flash and fire point, float test, loss on heating, specific gravity, softening point, and spread rate were explained in detail. It also outlined the necessary tools and apparatus required to perform these tests accurately. Proper sampling techniques were emphasized to ensure representative bitumen samples for testing. The chapter detailed the procedures for conducting each test to obtain reliable results. It further discussed the analysis and reporting of test data to support informed decision-making in material selection. Finally, the importance of maintaining testing equipment and ensuring their calibration and cleanliness was highlighted to guarantee consistent and precise measurements over time.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| PPEs (Overall, Safety boots, Gloves) | Bitumen Sample |
| Penetration Test Needle | |
| Ring and Ball Apparatus | |
| Softening Point Test Moulds | |
| Viscosity Cup | |
| Flash Point Test Cup and Equipment | |
| Thermometer | |
| Stopwatch |
| S/N | Item | Quantity |
|---|---|---|
| 1 | PPEs (Overall, Safety boots, Gloves) | 1 set per Candidate |
| 2 | Penetration Test Needle | 1 pc per Candidate |
| 3 | Ring and Ball Apparatus | 1 set per 3 Candidates |
| 4 | Softening Point Test Moulds | 1 set per Candidate |
| 5 | Viscosity Cup (Saybolt or Redwood) | 1 pc per Candidate |
| 6 | Flash Point Test Cup and Equipment | 1 set per 3 Candidates |
| 7 | Thermometer (Range 0°C to 200°C) | 1 pc per Candidate |
| 8 | Stopwatch | 1 pc per Candidate |
| 9 | Bitumen Sample (Approx. 500g) | 1 sample per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Candidate Safety and Preparation | |||
| Wore PPEs (Overall, Safety boots, Gloves) (Award 3 marks or zero) | 3 | ||
| Observed environmental safety and safe handling of bitumen samples and tools (Award 2 marks or zero) | 2 | ||
| Sub-Total | 5 | ||
| TASK 2: Identification of Bitumen Tests | |||
| Correctly identified Penetration Test and its purpose (Award 4 marks or zero) | 4 | ||
| Correctly identified Softening Point Test and its purpose (Award 4 marks or zero) | 4 | ||
| Correctly identified Viscosity Test and its purpose (Award 4 marks or zero) | 4 | ||
| Correctly identified Flash Point Test and its purpose (Award 4 marks or zero) | 4 | ||
| Sub-Total | 16 | ||
| TASK 3: Selection and Handling of Tools and Apparatus | |||
| Selected Penetration Test Needle for Penetration Test (Award 3 marks or zero) | 3 | ||
| Selected Ring and Ball Apparatus and Softening Point Moulds for Softening Point Test (Award 4 marks or zero) | 4 | ||
| Selected Viscosity Cup and Stopwatch for Viscosity Test (Award 3 marks or zero) | 3 | ||
| Selected Flash Point Test Cup and Thermometer for Flash Point Test (Award 3 marks or zero) | 3 | ||
| Sub-Total | 13 | ||
| PRODUCT CHECKLIST | |||
| Correctly matched each bitumen test with its corresponding tool/apparatus (Award 6 marks or zero) | 6 | ||
| Demonstrated proper handling and arrangement of tools and samples (Award 5 marks or zero) | 5 | ||
| Sub-Total | 11 | ||
| GRAND TOTAL | 45 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Personal Protective Equipment (Overall, Safety boots, Gloves) | Bitumen sample from tank or drum |
| Sampling container (Clean metal cans with lids) | |
| Bitumen sampling scoop | |
| Thermometer | |
| Heat resistant gloves | |
| Weighing balance | |
| Clean dry cloth |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Personal Protective Equipment (Overall, Safety boots, Gloves) | 1 set per Candidate |
| 2 | Sampling container (Clean metal cans with lids) | 2 pcs per Candidate |
| 3 | Bitumen sampling scoop | 1 pc per Candidate |
| 4 | Thermometer (Range up to 200°C) | 1 pc per Candidate |
| 5 | Heat resistant gloves | 1 pair per Candidate |
| 6 | Weighing balance (Capacity 5kg, sensitivity 1g) | 1 pc per 5 Candidates |
| 7 | Clean dry cloth | 1 pc per Candidate |
| 8 | Bitumen sample source (bitumen tank or drum) | Sufficient quantity per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Bitumen Sampling Procedure | |||
| Wore PPE (Overall, Safety boots, Gloves) (Award 3 marks or zero) | 3 | ||
| Checked temperature of bitumen using thermometer and recorded (Award 5 marks or zero) | 5 | ||
| Cleaned sampling containers and lids before use (Award 4 marks or zero) | 4 | ||
| Collected bitumen sample from tank/drum using scoop ensuring representative sampling (Award 10 marks or zero) | 10 | ||
| Filled sampling containers to approximately 500g each and sealed properly (Award 8 marks or zero) | 8 | ||
| Labelled samples correctly with date, time, and sample source (Award 5 marks or zero) | 5 | ||
| Cleaned work area and disposed of waste safely (Award 3 marks or zero) | 3 | ||
| Sub-Total | 38 | ||
| PRODUCT CHECKLIST | |||
| Samples collected weigh approximately 500g each (+/- 10g tolerance) (Award 10 marks for correct weight or zero) | 10 | ||
| Samples are properly sealed and labelled (Award 7 marks or zero) | 7 | ||
| Samples are free from contamination and external debris (Award 5 marks or zero) | 5 | ||
| Sub-Total | 22 | ||
| GRAND TOTAL | 60 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.