By the end of this chapter, you will be able to:
Mastering these skills will help you carry out precise and reliable surveys, which are essential for successful civil engineering projects.
Compiled by: Michael Githaiga
Draft survey design is a fundamental stage in civil engineering projects in Kenya, providing the initial groundwork for accurate site analysis and subsequent construction planning. Producing reduced levels and site cross-sections allows engineers to understand the terrain’s vertical profile and cross-sectional geometry, crucial for infrastructure such as roads, bridges, and drainage systems. This chapter equips civil engineering professionals with the skills to carry out these tasks effectively, ensuring precision in data collection and interpretation that supports sound design and execution.
Producing reduced levels (RLs) is a critical surveying process that establishes the elevations of various points on a site relative to a chosen datum, typically mean sea level or a local benchmark. In Kenya, accurate RLs are vital for projects like highway construction in Kisumu or drainage design in Nairobi’s urban areas, where terrain variations affect structural stability and design efficiency. This process involves careful measurement and computation to translate raw field data into meaningful elevations that guide earthworks and construction.
Reduced levels represent the vertical distance of a point above or below a fixed reference datum. This datum is often an established benchmark with a known elevation, such as a trigonometrical station or a permanent survey marker. RLs provide a common vertical reference that allows engineers to compare elevations consistently across a site.
Several methods exist to measure RLs, each suited to different site conditions and accuracy requirements. Kenyan surveyors often select methods based on equipment availability and site complexity.
The height of instrument (HI) method is a common approach in differential levelling. The HI is the elevation of the line of sight of the levelling instrument, calculated from the benchmark RL and the backsight reading.
Example: Suppose the benchmark RL is 120.000 m, the BS reading is 1.500 m, and the FS reading is 2.200 m.
Calculate HI:
HI = 120.000 + 1.500
HI = 121.500 m
Calculate RL of the new point:
RL = 121.500 - 2.200
RL = 119.300 m
Errors in determining RLs can significantly impact project outcomes; thus, understanding and controlling these errors is essential.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter focused on the essential techniques for producing reduced levels critical to accurate surveying. It explored the role of site cross-sections, detailing their purpose, how to establish cross-section lines, and the process of taking precise distance and elevation measurements. The discussion then shifted to drafting tools and equipment, covering both traditional instruments such as the drafting board, T-square, triangle, compass, and protractor, as well as modern computer-aided drafting tools. Emphasis was placed on the correct method of booking field notes to ensure data integrity. The chapter also guided the reader through the process of drafting site cross-sections and interpreting them effectively to understand terrain features. It explained how to establish survey design profiles by creating profiles, plotting elevations using reduced levels, and applying suitable scales. Finally, it addressed the importance of accurately labeling features and grades to produce clear and informative survey drawings.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Levelling Instrument | Marking Pegs |
| Tripod Stand | Lime |
| Levelling Staff (Graduated Rod) | Field Surveying Notebook |
| 20 Meter Long Tape Measure | Writing Material |
| Calculator |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Levelling Instrument | 1 per 5 Candidates |
| 2 | Tripod Stand | 1 per 5 Candidates |
| 3 | Levelling Staff (Graduated Rod) | 1 per Candidate |
| 4 | Marking Pegs | 12 Pcs per Candidate |
| 5 | Lime | 500 g per Candidate |
| 6 | Field Surveying Notebook | 1 per Candidate |
| 7 | 20 Meter Long Tape Measure | 1 per 5 Candidates |
| 8 | Writing Material (Pens, Pencils, Eraser) | Sufficient per Candidate |
| 9 | Calculator | 1 per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Field Survey and Data Collection | |||
| Wore PPEs (Safety boots, Overall, Gloves) (Award 1 mark for each PPE worn or zero) | 3 | ||
| Prepared and ensured all equipment were in good working condition (Award 2 marks or zero) | 2 | ||
| Set up levelling instrument correctly and leveled it (Award 3 marks or zero) | 3 | ||
| Marked baseline AB of 100 meters on the field with pegs (Award 5 marks or zero) | 5 | ||
| Took and recorded back sight, fore sight, and intermediate sights at 10 points (Award 5 marks or zero) | 5 | ||
| Measured and recorded height of collimation for each setup (Award 3 marks or zero) | 3 | ||
| Ensured measurements were accurate and corrected any errors (Award 2 marks for accuracy and 2 marks for error correction or zero) | 4 | ||
| Maintained a clean and organized work area (Award 2 marks or zero) | 2 | ||
| Sub-Total | 27 | ||
| TASK 2: Computation and Plotting | |||
| Completed booking sheets accurately with all recorded measurements (Award 3 marks or zero) | 3 | ||
| Calculated reduced levels using height of collimation method correctly (Award 1 mark for each correctly reduced level x10 or zero) | 10 | ||
| Checked and calculated closing error correctly (Award 2 marks for each correct error calculation x2 or zero) | 4 | ||
| Plotted the longitudinal section elevations on A3 graph paper accurately (Award 3 marks for correct plotting and 3 marks for including chainages and main profile elements) | 6 | ||
| Sub-Total | 23 | ||
| PRODUCT CHECKLIST | |||
| Reduced levels calculated correctly for all 10 points (Baseline length 10000 mm) (Award 1 mark for each correct reduced level or zero) | 10 | ||
| Longitudinal section plotted with correct elevations and chainages on A3 graph paper (10000 mm length) (Award 5 marks for correct elevation plotting, 3 marks for chainage accuracy, 2 marks for neatness) | 10 | ||
| Sub-Total | 20 | ||
| GRAND TOTAL | 70 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Levelling Instrument | Marking Pegs |
| Tripod Stand | Lime |
| Levelling Staff (Graduated Rod) | Field Surveying Note Book |
| 20 Meter Long Tape Measure | Writing Material |
| Calculator |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Levelling Instrument | Shared |
| 2 | Tripod Stand | Shared |
| 3 | Levelling Staff (Graduated Rod) | Shared |
| 4 | Marking Pegs | 12 Pcs per Candidate |
| 5 | Lime | Sufficient per Candidate |
| 6 | Field Surveying Note Book | 1 per Candidate |
| 7 | 20 Meter Long Tape Measure | Shared |
| 8 | Writing Material (Pens, Eraser) | Sufficient per Candidate |
| 9 | Calculator | 1 per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Site Preparation and PPE | |||
| Candidate wore all required PPE (overall, safety boots, gloves) (Award 1 mark each for overall, safety boots, gloves) | 3 | ||
| Candidate ensured all equipment is in good working condition (Award 2 marks or zero) | 2 | ||
| Candidate set up the levelling instrument correctly and levelled it (Award 3 marks or zero) | 3 | ||
| Sub-Total | 8 | ||
| TASK 2: Establish Baseline and Cross-Section Lines | |||
| Candidate marked baseline AB exactly 100 m apart with pegs (Award 5 marks or zero) | 5 | ||
| Candidate accurately set out six cross-section lines perpendicular to baseline at 20 m intervals (Award 2 marks each for six lines, maximum 10 marks) | 10 | ||
| Candidate measured offsets from baseline to cross-section points and pegged them correctly (Award 2 marks each for six offsets, maximum 10 marks) | 10 | ||
| Candidate recorded all measurements clearly and accurately in field book (Award 5 marks or zero) | 5 | ||
| Sub-Total | 30 | ||
| TASK 3: Accuracy, Error Checking and Documentation | |||
| Candidate checked and corrected any measurement errors (Award 4 marks or zero) | 4 | ||
| Candidate reduced levels by height of collimation method for cross-section points (Award 1 mark for each of 10 points reduced) | 10 | ||
| Candidate computed and checked closing error of baseline (Award 2 marks each for calculation and checking errors) | 4 | ||
| Candidate maintained a clean and organized work area and tools (Award 3 marks or zero) | 3 | ||
| Sub-Total | 21 | ||
| PRODUCT CHECKLIST | |||
| Baseline AB length is 100 m ± 0.05 m and cross-section lines are perpendicular within ±1° (Award 5 marks or zero) | 5 | ||
| Cross-section lines are evenly spaced at 20 m ± 0.1 m intervals along baseline (Award 5 marks or zero) | 5 | ||
| Offsets measured and pegged correctly to ±0.05 m accuracy (Award 5 marks or zero) | 5 | ||
| All measurements and calculations are accurately recorded and reduced levels correctly computed (Award 8 marks or zero) | 8 | ||
| Sub-Total | 23 | ||
| GRAND TOTAL | 82 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.