Preparation of a bill of quantities (BoQ) is an essential skill for civil engineering professionals in Kenya, ensuring accurate measurement, pricing, and procurement of construction works. This chapter focuses on the preparation of specifications, which form the backbone of the BoQ by detailing the quality and standards required. Proper specification preparation aligned with established standards like SMM (Standard Method of Measurement) or CESMM (Civil Engineering Standard Method of Measurement) guarantees consistency and clarity for contractors and clients. Cross-referencing specifications with drawings and designs ensures coherence and reduces errors during project execution.
4.1 Preparation of Specifications
The preparation of specifications is a critical step in the measurement and costing process, providing detailed descriptions of the materials, workmanship, and quality standards necessary for the project. In Kenya, civil engineers must ensure that specifications comply with local standards, client requirements, and industry best practices. Specifications must be clear, unambiguous, and easily cross-referenced with project drawings to avoid disputes and cost overruns.
4.1.1 Specifications preparations
Specification preparation involves creating detailed written instructions that describe the materials, workmanship, and methods required for each part of the construction work. This ensures all parties have a common understanding of the project requirements, thereby facilitating accurate measurement and costing.
Concept and Purpose
Specifications communicate the technical requirements for construction works, guiding contractors on acceptable materials, workmanship, and quality control measures.
- Ensures Quality Control: Specifications define minimum standards to maintain consistent quality throughout the project.
- Facilitates Accurate Costing: Clear specifications enable quantity surveyors to prepare precise BoQs and cost estimates.
- Reduces Ambiguity: Detailed descriptions prevent misunderstandings between clients, contractors, and consultants.
- Supports Contract Administration: Specifications provide a basis for inspection, testing, and acceptance of works.
- Enhances Procurement: They guide suppliers and contractors on the required materials and workmanship, ensuring suitable procurement.
Steps in Preparing Specifications
- Review Project Drawings and Scope: Understand the design intent and project requirements to develop relevant specifications.
- Identify Materials and Workmanship Standards: Select appropriate materials and workmanship standards aligned with Kenyan codes and client needs.
- Organize Specifications by Work Sections: Group specifications according to construction elements such as concrete, masonry, finishes, etc.
- Write Clear Descriptions: Use unambiguous language to describe materials, methods, and quality expectations.
- Include Testing and Inspection Requirements: Specify procedures for quality control and acceptance criteria.
- Cross-check with Stakeholders: Verify specifications with design engineers and clients to ensure completeness and accuracy.
Types of Specifications
- Performance Specifications: Define the required performance criteria without prescribing methods.
- Prescriptive Specifications: Specify exact materials, workmanship, and methods to be followed.
- Proprietary Specifications: Name specific products or manufacturers to be used.
- Reference Specifications: Refer to established standards or codes for requirements.
Common Challenges in Specification Preparation
- Overly Vague Descriptions: Leading to contractor misunderstandings and potential disputes.
- Excessive Detail: Causing confusion and unnecessary restrictions.
- Incompatibility with Drawings: Resulting in conflicts between written and graphical information.
- Ignoring Local Standards: Leading to non-compliance with Kenyan regulations.
- Failure to Update Specifications: Causing outdated requirements and project delays.
4.1.1.1 Material
A material specification is the part of the specification that states exactly what materials and products must be used in the works, including their type, quality, grade, size, standard, source, testing, delivery and storage. It allows the quantity surveyor to price the bill of quantities correctly, the contractor to buy the right materials, and the engineer or clerk of works to accept or reject materials delivered to site. Material clauses usually refer to recognised standards, such as Kenya Standards (KS) issued by KEBS or British and European standards, and they state that materials must be new, of the best quality of their kind and approved before use. Example: the specification for a maternity wing at a mission hospital in Kapsabet required cement complying with the relevant Kenya Standard, clean washed river sand and 20 mm crushed ballast from an approved quarry, so that every contractor priced the same materials.
Information Included in a Material Specification
- Type and description: The exact material, such as ordinary Portland cement, high-yield deformed bars or machine-cut stone.
- Grade, class or strength: The required performance level, such as class 25 concrete or grade 500 reinforcement.
- Size and dimensions: Sizes, thicknesses, gauges or grading, such as 200 mm walling stone or 28-gauge roofing sheets.
- Standard to be complied with: The KS, BS or EN standard that the material must meet.
- Source and approval: Approved sources, suppliers or quarries, and whether samples must be approved before ordering.
- Testing and certification: Tests required and test certificates or KEBS marks to be provided.
- Delivery, handling and storage: How materials are to be delivered, protected and stored on site.
- Alternatives: Whether alternatives "or equal approved" are allowed and how they are approved.
Example Material Specification Clauses
| Material |
Example specification |
| Cement |
Ordinary Portland cement complying with the relevant Kenya Standard, delivered in sealed bags and stored in a dry, raised store, used in order of delivery |
| Fine aggregate |
Clean, washed river sand, free from clay, silt and organic matter, graded within the specified limits |
| Coarse aggregate |
Hard crushed stone, 20 mm nominal size, from an approved quarry, free from dust and flaky particles |
| Reinforcement |
High-yield deformed bars grade 500 complying with the relevant standard, free from loose rust, oil and mill scale |
| Walling stone |
Machine-cut stone 200 × 200 × 400 mm, of uniform size, free from cracks, from an approved quarry |
| Roofing sheets |
Pre-painted galvanised steel sheets of the specified gauge and profile, colour as approved by the architect |
Steps for Writing a Material Specification
- List all materials: Identify every material shown on the drawings and in the bill of quantities.
- Determine performance needs: Decide the strength, durability and appearance each material must achieve.
- Select applicable standards: Identify the KS, BS or EN standards that each material must comply with.
- State grades and sizes: Write the exact grade, class, size and dimensions required.
- Specify sampling and testing: State the samples, tests and certificates required before and during use.
- Specify delivery and storage: State how materials must be delivered, handled and stored to prevent damage.
- State approval procedures: Describe how samples and alternatives will be approved.
- Check against drawings and BoQ: Ensure the material descriptions agree with the drawings and bill items.
4.1.1.2 Workmanship
A workmanship specification is the part of the specification that describes how the work must be carried out, including the methods, sequence, skill, accuracy, tolerances, curing, protection and finishing required for each trade. While the material specification ensures the right materials are bought, the workmanship specification ensures that they are put together correctly, because even the best materials fail if they are poorly mixed, placed, fixed or protected. Workmanship clauses also state how completed work will be inspected and tested, and what happens if it does not comply. Example: the specification for a dormitory block at a girls' secondary school in Kakamega required blockwork to be laid in stretcher bond with 10 mm joints, hoop iron every third course and curing for seven days, which the clerk of works used to inspect every wall.
Information Included in a Workmanship Specification
- Methods of construction: How each operation is to be done, such as mixing, placing and compacting concrete.
- Sequence of work: The order in which operations must be carried out, such as damp-proof course before walling above.
- Accuracy and tolerances: Allowable deviations in level, line, plumb and dimensions.
- Curing and protection: How fresh work must be cured and protected from weather and damage.
- Skill and supervision: Requirements for skilled tradespeople and competent supervision.
- Inspection and testing: Stages at which work must be inspected and tests carried out.
- Making good and cleaning: Requirements for repairing defects and leaving work clean.
- Removal of defective work: The contractor's obligation to remove and replace work that does not comply.
Example Workmanship Specification Clauses
| Trade |
Example specification |
| Concrete |
Concrete shall be placed within 30 minutes of mixing, compacted with mechanical vibrators and cured continuously for not less than seven days |
| Masonry |
Walling shall be laid in stretcher bond on a full bed of mortar with joints 10 mm thick, with hoop iron reinforcement every third course |
| Reinforcement |
Bars shall be fixed to the cover shown on the drawings using approved spacers and tied securely at every intersection |
| Plastering |
Walls shall be wetted before plastering, and plaster applied in two coats to a total thickness of 15 mm, true to line and level |
| Painting |
Surfaces shall be clean, dry and prepared before applying one primer, one undercoat and two finish coats |
| Roofing |
Sheets shall be laid with the specified side and end laps and fixed with the approved fasteners at the specified spacing |
Steps for Writing a Workmanship Specification
- Identify the work sections: List the trades involved, such as excavation, concrete, masonry, roofing and finishes.
- Describe each operation: Write clear instructions for how each operation must be carried out.
- State the sequence: Specify the order of operations and any hold points before the next stage.
- Set tolerances: State the allowable deviations in line, level, plumb and dimensions.
- Specify curing and protection: State how and for how long work must be cured and protected.
- Specify inspection and testing: State inspection stages, tests and acceptance criteria.
- State remedies for defects: Explain how defective work will be dealt with.
- Review with the design team: Confirm the clauses agree with the drawings, design assumptions and contract conditions.
4.1.2 Following SMM/CESMM standards
In Kenya, adherence to internationally recognized standards such as the Standard Method of Measurement (SMM) and the Civil Engineering Standard Method of Measurement (CESMM) ensures uniformity and professionalism in specifications and BoQ preparation. These standards provide systematic rules and terminology for measuring construction works.
Overview of SMM and CESMM
- Standard Method of Measurement (SMM): Primarily used for building works, it provides standardized rules for measuring quantities and preparing BoQs.
- Civil Engineering Standard Method of Measurement (CESMM): Designed for civil engineering projects, it covers earthworks, roads, drainage, and other infrastructure works.
- Purpose: Both standards aim to promote clarity, reduce disputes, and facilitate fair tendering by standardizing measurement and description procedures.
- Application in Kenya: These standards are widely adopted by government agencies, private sector clients, and consultants to ensure consistency.
- Regular Updates: Both SMM and CESMM are periodically revised to incorporate new materials, methods, and technologies.
Key Features of SMM/CESMM
- Uniform Terminology: Clear definitions of work items and measurement rules.
- Item Description Format: Standardized phrasing for work items to facilitate comprehension.
- Measurement Rules: Specific guidance on how to measure quantities for different types of work.
- Cross-referencing Procedures: Instructions on linking specifications with drawings and BoQs.
- Pricing Guidelines: Framework for consistent pricing and valuation of work.
Benefits of Using SMM/CESMM
- Improved Accuracy: Reduces errors in measurement and costing.
- Facilitated Tendering: Enables contractors to prepare competitive and comparable bids.
- Enhanced Communication: Standard language improves clarity among stakeholders.
- Dispute Reduction: Clear measurement and description reduce claims and disagreements.
- Professional Recognition: Aligns with international best practices, enhancing project credibility.
Implementation Challenges
- Training Requirements: Professionals need adequate training to apply standards correctly.
- Project-Specific Adaptations: Some projects require modifications of standard rules.
- Integration with Local Regulations: Harmonizing standards with Kenyan building codes.
- Updating Documentation: Ensuring all project documents reflect current standards.
- Software Compatibility: Adapting standards for use in digital measurement and costing tools.
4.1.3 Cross-referencing with drawings and designs
Cross-referencing specifications with project drawings and designs is essential to ensure consistency and completeness in the BoQ. Drawings provide the graphical representation of the project, while specifications describe the qualitative requirements.
Importance of Cross-Referencing
- Ensures Completeness: Confirms all elements shown in drawings are specified.
- Avoids Contradictions: Detects discrepancies between graphical and written information.
- Facilitates Accurate Measurement: Clarifies dimensions and quantities for BoQ preparation.
- Supports Quality Assurance: Aligns quality expectations with design intent.
- Simplifies Communication: Provides a clear reference framework for contractors and inspectors.
Methods of Cross-Referencing
- Using Item Numbers: Linking specification items with drawing references and codes.
- Referencing Drawing Sheets: Citing specific drawing numbers and details in specifications.
- Incorporating Detail Callouts: Ensuring detailed drawings correspond to specification sections.
- Creating Cross-Reference Tables: Tabulating specification clauses against drawing elements.
- Digital Integration: Employing software tools to link drawings and specifications electronically.
Steps to Cross-Reference Effectively
- Review All Drawings Thoroughly: Identify all elements requiring specification.
- Match Specification Sections to Drawings: Align each specification item with corresponding drawings.
- Note Discrepancies and Resolve: Communicate with design team to clarify inconsistencies.
- Update Specifications or Drawings: Amend documents to ensure mutual consistency.
- Document Cross-Reference Links: Maintain records for easy navigation and verification.
- Verify During Tendering and Execution: Use cross-references to check contractor queries and site works.
Challenges in Cross-Referencing
- Complex or Incomplete Drawings: Leading to gaps in specification coverage.
- Frequent Design Changes: Causing misalignment between documents.
- Poor Communication: Between design and specification teams.
- Lack of Standardized Referencing System: Resulting in confusion and errors.
- Time Constraints: Rushing cross-referencing can cause overlooked discrepancies.
Practice Questions
-
A reinforced concrete slab requires specification preparation. List the six steps you would follow to prepare its specifications. (6 marks)
-
Explain four key benefits of using SMM or CESMM standards in preparation of specifications and BoQs for a county government road project. (8 marks)
-
Describe five methods of cross-referencing specifications with drawings in a hospital construction project. (10 marks)
-
Identify five common challenges encountered when preparing specifications and suggest how to mitigate one of them in a retail complex project. (10 marks)
The rest of this chapter
🔒Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free account 🔒4.2 Preparation of Schedule of Rates
In Kenyan civil engineering projects, the schedule of rates forms the backbone of cost estimation by providing unit costs for various work items. Preparing an accurate schedule of rates ensures that contractors and clients understand the financial implications…
🔒4.3 Preparation of Bill of Quantities
Preparation of a Bill of Quantities (BOQ) is a critical step in civil engineering projects in Kenya. The BOQ translates design drawings and specifications into a detailed document listing quantities and descriptions of work items for tendering and cost control…
Chapter Summary
This chapter focused on the preparation of specifications, emphasizing the importance of detailing material requirements and workmanship standards in line with SMM and CESMM guidelines. It highlighted the necessity of cross-referencing specifications with the project drawings and designs to ensure coherence and avoid discrepancies. The process of preparing the schedule of rates was explained, including the calculation of rates from abstracted quantities and the application of standard costing methods to maintain accuracy. Adjustments to rates were discussed in relation to specific project constraints that may affect pricing. The compilation of the bill of quantities was covered thoroughly, stressing the need for it to be comprehensive, accurate, and based on working drawings. Standard formats for the bill of quantities were introduced to promote consistency and clarity. Finally, the chapter underscored the importance of reviewing the bill of quantities to ensure it aligns perfectly with the prepared specifications.
Self-Assessment
🔒 PDFDownload this self-assessment, with answers
Written Assessment
-
Calculate the cost of 1500 kg of cement if the unit cost is Ksh 120 per 50 kg bag. (2 marks)
-
A wall requires 20 m³ of concrete. If the rate per m³ is Ksh 8,500, calculate the total cost for the concrete. (2 marks)
🔒18 more in this section.
Chapter Examination Questions
🔒 PDFDownload these examination questions, with worked answers
SECTION A (40 Marks) - Answer ALL Questions
- Define the purpose of preparing specifications in civil engineering projects and explain how material specifications influence project outcomes. (4 marks)
- Explain the role of workmanship specifications and describe two examples of workmanship requirements in concrete works. (4 marks)
🔒18 more in this section.
Chapter Practical Activities
Practical 1: Prepare detailed specifications for materials and workmanship for a reinforced concrete wall
Civil Engineering · Level 6
Measurements, Estimation And Costing Principles 1
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Prepare detailed written specifications for the materials and workmanship for a reinforced concrete wall 3000mm long, 250mm thick, and 2400mm high.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Notebook and pen | Reference materials (Kenya National Building Code, Standard Specifications for Concrete Works) |
| Calculator | Sample material data sheets (cement, aggregates, reinforcement steel) |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | PPEs (Safety boots, Overall, Gloves, Helmet) | 1 set per Candidate |
| 2 | Notebook and pen | 1 each per Candidate |
| 3 | Reference materials (Kenya National Building Code, Standard Specifications for Concrete Works) | 1 set per Candidate |
| 4 | Sample material data sheets (cement, aggregates, reinforcement steel) | 1 set per Candidate |
| 5 | Calculator | 1 per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Preparation of Specifications |
Wore PPEs (Safety boots, Overall, Gloves, Helmet) (Award 3 marks or zero) | 3 | | |
Collected and referred to relevant reference materials and sample data sheets (Award 3 marks or zero) | 3 | | |
Prepared specifications covering material quality requirements for cement, aggregates, water, and reinforcement steel (Award 2 marks each for cement, aggregates, water, and reinforcement steel specifications) | 8 | | |
Prepared workmanship requirements including mixing, placing, curing, and finishing concrete (Award 2 marks each for mixing, placing, curing, and finishing workmanship requirements) | 8 | | |
Documented specifications clearly and legibly in the notebook (Award 3 marks or zero) | 3 | | |
| Sub-Total | 25 | | |
| PRODUCT CHECKLIST |
Specifications include correct material properties with reference to standards (Award 5 marks or zero) | 5 | | |
Workmanship requirements are comprehensive and aligned with good construction practice (Award 5 marks or zero) | 5 | | |
Specifications are well organized, complete, and free of ambiguity (Award 5 marks or zero) | 5 | | |
| Sub-Total | 15 | | |
| GRAND TOTAL | 40 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
Practical 2: Prepare specifications for a reinforced concrete wall using SMM/CESMM standards
Civil Engineering · Level 6
Measurements, Estimation And Costing Principles 1
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Prepare detailed specifications for a reinforced concrete wall 3000mm long x 200mm thick x 3000mm high strictly following SMM or CESMM standards.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Calculator | Specification manual for SMM or CESMM |
| Notebook and pen | Working drawing of reinforced concrete wall 3000mm x 200mm x 3000mm high |
| Scale ruler | |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | PPEs (gloves, overall, safety boots, helmet) | 1 set per Candidate |
| 2 | Specification manual for SMM or CESMM | 1 per Candidate |
| 3 | Calculator | 1 per Candidate |
| 4 | Notebook and pen | 1 set per Candidate |
| 5 | Scale ruler | 1 per Candidate |
| 6 | Working drawing of reinforced concrete wall 3000mm x 200mm x 3000mm high | 1 per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Specification Preparation |
Wore PPEs (Overall, Gloves, Safety boots, Helmet) (Award 3 marks or zero) | 3 | | |
Selected and used the correct SMM or CESMM specification manual (Award 2 marks or zero) | 2 | | |
Accurately identified and described the work sections for reinforced concrete wall (Award 5 marks for correct sections named and described) | 5 | | |
Prepared clear and unambiguous specifications adhering strictly to SMM/CESMM standards (Award 10 marks for completeness, clarity, and standard compliance) | 10 | | |
Correctly quantified items according to SMM/CESMM measurement rules (Award 8 marks for correct quantities and units) | 8 | | |
Presented specifications in logical order consistent with SMM/CESMM format (Award 4 marks or zero) | 4 | | |
| Sub-Total | 32 | | |
| PRODUCT CHECKLIST |
Specifications document matches working drawing dimensions (3000mm x 200mm x 3000mm) (Award 5 marks for correct dimension matching) | 5 | | |
Specifications conform fully to SMM/CESMM format and terminology (Award 8 marks for full conformity) | 8 | | |
Specifications are clear, comprehensive, and free from ambiguity (Award 5 marks for clarity and completeness) | 5 | | |
| Sub-Total | 18 | | |
| GRAND TOTAL | 50 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
🔒Cross-reference specifications with working drawings for a 3000mm x 2000mm wallPractical 3
🔒Prepare schedule of rates from abstracted quantities for a residential wallPractical 4
🔒Prepare Standard Costing Rates for a 1m³ Concrete MixPractical 5
🔒Prepare and adjust bill of quantities rates considering project constraintsPractical 6
🔒Compile Bill of Quantities for a Single-Storey Residential WallPractical 7
🔒Review and Complete Bill of Quantities for a Residential Building ProjectPractical 8
🔒Format Bill of Quantities for a Residential Building ProjectPractical 9
🔒Review Bill of Quantities for Consistency with SpecificationsPractical 10
🔒Abstract Quantities from Structural Wall Drawings for Bill of Quantities PreparationPractical 11
🔒Prepare Material Specification Document Using CESMM for Reinforced ConcretePractical 12
🔒Calculate rate adjustments for project constraints in bill of quantitiesPractical 13
🔒Prepare a Schedule of Rates for Masonry Incorporating Workmanship FactorsPractical 14
🔒Integrate Specifications and Bill of Quantities for Final Tender DocumentationPractical 15