Building Technology  ·  Level 6
Measurement, Estimation And Costing Of Building Works I
Chapter 1: Measure the building works
📚 6 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Accurately interpret the details of building elements from working drawings.
  • Measure building elements correctly using the standard methods for building and civil engineering works.
  • Properly complete the working up process based on the building elements.
  • Carry out abstracting tasks following the relevant code of practice.
  • Prepare billing papers correctly in line with the code of practice.
  • Compile the bill of quantities accurately using the standard measurement methods.

Mastering these skills will help you confidently estimate and manage building projects, making you a valuable asset in the construction trade.

Compiled by: John Wachira

Measurement of building works begins with accurate interpretation of working drawings and precise taking off of quantities for all building elements. In the Kenyan building industry, this process is critical for preparing reliable estimates and cost plans that guide project budgeting and tendering. Mastery of measurement techniques ensures that quantities reflect the true scope of work, facilitating efficient procurement and construction management.

PEER-VERIFIED EDIT CONTENT

Practice Questions

  1. A building plan is drawn at 1:100 scale. A wall length measures 8 cm on the drawing. What is the actual length in meters? (2 marks)
  2. Identify the meaning of the following symbols commonly found on working drawings: a square with diagonal cross, a circle with a letter inside, and a dashed line. (3 marks)
  3. Given the architectural and structural drawings of a single-storey building, explain the process of cross-referencing to ensure complete measurement. (5 marks)

1.1 Interpretation of working drawings

Working drawings are the set of scaled, dimensioned and annotated drawings that show exactly what is to be built, where, how big and of what materials, and interpreting them means reading and understanding this information correctly so that the work can be set out, priced and built as the designer intended. Every trade on site, from the foreman setting out foundations to the plumber fixing pipes, depends on the drawings, so a misread dimension, level or symbol can lead to costly demolition, delays and disputes. In practice, the reader studies the title block and drawing list, understands the scale and conventions, relates plans, elevations and sections to each other, and checks dimensions, levels and notes before starting work. Example: before setting out a new dormitory for a secondary school in Kericho, the site supervisor cross-checked the foundation plan against the ground floor plan and noticed that a column grid line was dimensioned differently on the two drawings, and the architect's correction saved the contractor from casting a misplaced column base.

Tools and Equipment for Reading Drawings

Name Specification Use
Scale rule Triangular or flat rule marked with common scales such as 1:1, 1:5, 1:10, 1:20, 1:50, 1:100, 1:200, 1:500 Measuring distances on drawings and converting to real sizes
Steel tape measure 5 m to 30 m, graduated in mm Checking real dimensions on site against the drawings
Scientific calculator Basic arithmetic and square root functions Adding dimensions, working out areas, volumes and level differences
Highlighter pens and markers Different colours Marking dimensions checked, changes and items relevant to a trade
Drawing register List of all drawings with numbers, titles and latest revisions Confirming that the latest revision of each drawing is in use
Computer or tablet with CAD/PDF viewer Software able to open, zoom and measure on digital drawings Reading and measuring electronic drawings accurately
Drawing board or table and clips Flat surface large enough for A1 or A0 sheets Laying out and studying drawings in the site office

Types of Working Drawings

Drawing What it shows Typical scale
Location plan Position of the site in relation to roads and surrounding areas 1:1250 or 1:2500
Site plan Building position on the plot, boundaries, access, drainage and services 1:200 or 1:500
Foundation plan Layout, sizes and depths of foundations and column bases 1:50 or 1:100
Floor plans Horizontal section at about 1 m above floor level showing walls, openings, rooms and fittings 1:50 or 1:100
Elevations External faces of the building showing heights, openings, finishes and roof 1:50 or 1:100
Sections Vertical cuts through the building showing floor levels, wall construction, roof structure and heights 1:50 or 1:20
Details Enlarged drawings of specific parts such as stairs, eaves, damp proof courses and joinery 1:5, 1:10 or 1:20
Structural drawings Sizes and reinforcement of foundations, columns, beams and slabs 1:20, 1:25 or 1:50
Services drawings Layout of plumbing, drainage, electrical and mechanical installations 1:50 or 1:100
Schedules Tables listing doors, windows, finishes, ironmongery and bar bending details Not to scale

Elements of a Working Drawing

  • Title block: Shows the project name, client, drawing title, drawing number, scale, date, designer and approval signatures, usually at the bottom right of the sheet.
  • Revision block: Lists changes made to the drawing with revision letters, dates and descriptions, so the reader knows the drawing is current.
  • Scale: States the ratio between drawing size and real size, which must be read before measuring anything.
  • North point: Shows the orientation of the building on the site, important for setting out and sun shading.
  • Grid lines: Lettered and numbered reference lines, usually through column centres, used to locate elements accurately.
  • Dimensions: Figures showing lengths, widths and positions, usually in millimetres on building drawings.
  • Levels: Heights of floors, ground, foundations and roofs relative to a datum, usually in metres.
  • Annotations and notes: Written information on materials, specifications, mixes and construction methods.
  • Symbols and hatching: Standard graphic signs for doors, windows, fittings and materials such as brickwork, concrete and earth.
  • Legend or key: Explains symbols, line types and abbreviations used on the drawing.

Types of Lines Used on Drawings

Line type Appearance Meaning
Thick continuous line Bold, unbroken Visible outlines and cut edges of walls in plan and section
Thin continuous line Fine, unbroken Dimension lines, projection lines, hatching and leaders
Dashed (hidden) line Short dashes Edges or features hidden from view, such as foundations under a floor
Chain line Long dash, short dash Centre lines and grid lines
Thick chain line with arrows Chain line thickened at ends with arrows and letters Position and viewing direction of a section (cutting plane)
Break line Zigzag or freehand line Part of a long object is not drawn, to save space

Common Symbols and Abbreviations

  • Door symbol: An opening in a wall with a line and arc showing the door leaf and the direction it swings.
  • Window symbol: Thin parallel lines within the wall thickness, showing the frame and glass.
  • Stair symbol: Parallel lines for treads with an arrow showing the direction going up, often marked "UP".
  • Sanitary fittings: Simple outlines for WC, basin, shower tray, sink and bath at their positions in the plan.
  • FFL: Finished floor level, the level of the top of the floor finish.
  • NGL and FGL: Natural ground level before work and finished ground level after landscaping.
  • DPC and DPM: Damp proof course in walls and damp proof membrane under floor slabs.
  • RC and BRC: Reinforced concrete and steel welded mesh fabric.
  • Dia or Ø: Diameter of a bar, pipe or circular element, such as Y12 for a 12 mm high-yield bar.
  • TOW and SFL: Top of wall and structural floor level.

Steps to Interpret Working Drawings

  1. Check the drawing register: Confirm you have the complete set of drawings and that each is the latest approved revision.
  2. Read the title block: Note the project, drawing title, number, scale, units and date before looking at the details.
  3. Study the legend and general notes: Learn the symbols, abbreviations, line types and general specifications used.
  4. Orient the drawing: Use the north point and grid lines to understand where the building sits and how the drawings relate to the site.
  5. Read the plans: Identify rooms, wall thicknesses, openings, fittings and overall and internal dimensions.
  6. Relate plans to elevations and sections: Follow section lines on the plan to the section drawings, and match elevations to the plan to understand heights and vertical construction.
  7. Read dimensions and levels: Use written dimensions rather than scaling wherever possible, and check that strings of dimensions add up to overall dimensions.
  8. Study details and schedules: Refer to enlarged details and door, window and finishes schedules for exact construction and materials.
  9. Cross-check between drawings: Compare architectural, structural and services drawings to identify clashes or inconsistencies.
  10. Raise queries in writing: Report any errors, missing information or conflicts to the architect or engineer and obtain written answers before proceeding.

Calculations from Working Drawings

Converting a Scaled Measurement to Real Size

Example: on a 1:100 floor plan of a SACCO office in Embu, a room width measures 45 mm with a scale rule.

Real length = Measured length × Scale factor

Real length = 45 mm × 100

Real length = 4,500 mm

Real length = 4.5 m

Finding the Area of a Room from Dimensions

Example: a banking hall on the plans of a bank branch in Nakuru is dimensioned 12,500 mm by 8,400 mm.

Area = Length × Width

Area = 12.5 m × 8.4 m

Area = 105 m²

Finding a Height Difference from Levels

Example: the section of a clinic at a county referral hospital in Machakos shows FFL +1.250 m and NGL +0.800 m.

Height of plinth = FFL − NGL

Height of plinth = 1.250 m − 0.800 m

Height of plinth = 0.450 m (450 mm)

Common Errors in Interpreting Drawings

  • Using an old revision: Working from a superseded drawing leads to building elements that no longer match the design.
  • Scaling instead of reading dimensions: Paper copies may shrink or be printed at the wrong size, so written dimensions must be used where given.
  • Confusing units: Building dimensions are usually in millimetres and levels in metres, and mixing them causes large errors.
  • Misreading the scale: Measuring a 1:50 drawing with the 1:100 edge of the scale rule doubles or halves sizes.
  • Ignoring notes and details: Important information on materials, cover to reinforcement and fixing methods is often in notes rather than on the main drawing.
  • Not cross-checking drawings: Failing to compare architectural and structural drawings can cause clashes, such as a beam blocking a door opening.
  • Wrong orientation: Reading a drawing upside down or ignoring the north point can lead to mirror-image setting out. Example: a building contractor in Thika avoided setting out a hotel kitchen block back to front when the foreman checked the north point and grid lines against the site plan before pegging the corners.
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒1.2 Taking off of building elements

The process of taking off involves extracting quantities from drawings for each building component. Measurement must follow standard methods such as the Standard Method of Measurement (SMM) used in Kenya. The major groups are substructure, superstructure, door…

🔒1.3 Working Up Process

In building measurement and estimation, the working up process involves detailed calculation and organization of quantities derived from the measured dimensions of building elements. This process is critical for preparing accurate bills of quantities (BOQ) and…

🔒1.4 Abstracting

Abstracting is the process of transferring the quantified building works from the working up sheets into a structured bill of quantities format. This step is essential for pricing, tendering, and contractual documentation. In Kenya, abstracting requires adhere…

🔒1.5 Preparation of billing papers

In Kenyan building projects, accurate preparation of billing papers is essential for clear communication between contractors and clients, ensuring timely payments and proper project cost control. Billing papers serve as the formal documentation of quantities a…

🔒1.6 Compilation of bill of quantities

A bill of quantities (BoQ) is a document prepared by a quantity surveyor that lists, in a standard order, every item of work and material needed to complete a building project, each with a full description, unit of measurement and quantity, so that contractors…

Chapter Summary

This chapter covers the essential skills for measuring building works, starting with the interpretation of working drawings to understand project specifications accurately. It then explains the systematic process of taking off quantities for various building elements including the substructure, superstructure, doors, windows, finishes, and internal and external fittings. The working up process is described as a method to organize and verify measurements before proceeding. Abstracting is introduced as the step where measurements are compiled and categorized for further use. The preparation of billing papers is detailed, comparing the Direct Billing method with the Cut and Shuffle technique to ensure accurate documentation. Finally, the chapter outlines the compilation of bills of quantities, discussing different formats such as Operational, Elemental, Trade, Activity, and Annotated Bills, each serving specific purposes in construction cost management. This comprehensive approach equips students with practical knowledge for precise measurement and cost estimation in building projects.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A foundation trench is 12 m long, 0.9 m wide and 1.2 m deep. Calculate the volume of concrete required for the footing. (2 marks)

  2. A wall measures 8 m long, 3 m high and 0.2 m thick. Calculate the surface area of the wall for plastering. (2 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the importance of correctly interpreting working drawings when measuring building works for a residential building in Nairobi. (4 marks)
  2. Identify four substructure elements that must be taken off when preparing a bill of quantities for a commercial building. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Interpret working drawings and measure building elements accurately▶ Simulate this practical

Building Technology · Level 6
Measurement, Estimation And Costing Of Building Works I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Interpret the provided architectural and structural working drawings and measure the following building elements on the drawing: external wall length 4200mm, internal wall length 3150mm, window opening width 1200mm, door opening width 900mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring tape 10 metersArchitectural working drawing A1 size
Steel ruler 1 meterStructural working drawing A1 size
Scale ruler architect 30 cm
Pencil HB
Eraser
Calculator
Notebook or field book
Clipboard or drawing board
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Architectural working drawing A1 size1 Set per Candidate
2Structural working drawing A1 size1 Set per Candidate
3Measuring tape 10 meters1 Pc per Candidate
4Steel ruler 1 meter1 Pc per Candidate
5Scale ruler architect 30 cm1 Pc per Candidate
6Pencil HB1 Pc per Candidate
7Eraser1 Pc per Candidate
8Notebook or field book1 Pc per Candidate
9Calculator1 Pc per Candidate
10Clipboard or drawing board1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Interpretation and Measurement of Building Elements
Wore Personal Protective Equipment (safety boots, dust coat, helmet)
(Award 1 mark for each correctly donned PPE)
3
Identified and located external walls on the architectural drawing
(Award 3 marks or zero)
3
Identified and located internal walls on the architectural drawing
(Award 3 marks or zero)
3
Identified window openings and noted dimensions
(Award 3 marks or zero)
3
Identified door openings and noted dimensions
(Award 3 marks or zero)
3
Used scale ruler properly to measure lengths on drawing
(Award 4 marks or zero)
4
Recorded measurements accurately in the field book
(Award 4 marks or zero)
4
Calculated total wall lengths and openings correctly
(Award 4 marks or zero)
4
Sub-Total27
PRODUCT CHECKLIST
External wall length measured as 4200 mm
(Award 4 marks or zero)
4
Internal wall length measured as 3150 mm
(Award 4 marks or zero)
4
Window opening width measured as 1200 mm
(Award 3 marks or zero)
3
Door opening width measured as 900 mm
(Award 3 marks or zero)
3
Measurements recorded are neat, legible and correctly tabulated
(Award 4 marks or zero)
4
Sub-Total18
GRAND TOTAL45
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Take off quantities for strip foundation substructure

Building Technology · Level 6
Measurement, Estimation And Costing Of Building Works I
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Take off quantities for a strip foundation measuring 1200mm wide, 600mm deep, and 15 meters long.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measure 10mLime powder
Builders' line
Plumb bob
Spirit level 600mm
Mason square
Pencil
Field book
Calculator
Peg
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Tape measure 10m1 Pc per Candidate
2Builders' line1 Pc per Candidate
3Plumb bob1 Pc per 5 Candidates
4Spirit level 600mm1 Pc per 5 Candidates
5Mason square1 Pc per 5 Candidates
6Pencil1 Pc per Candidate
7Field book1 Pc per Candidate
8Graph paper1 Pc per Candidate
9Calculator1 Pc per Candidate
10Peg10 Pcs per Candidate
11Lime powder1 bag per 5 Candidates
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Quantity Take Off for Strip Foundation Substructure
Donned Personal Protective Equipment (dustcoat, helmet, safety boots)
(Award 1 mark for each PPE donned or zero)
3
Interpreted and understood the working drawing correctly
(Award 3 marks or zero)
3
Assembled all necessary tools and materials before starting
(Award 2 marks or zero)
2
Measured and marked the length of the strip foundation correctly (15,000mm)
(Award 4 marks or zero)
4
Measured and marked the width of the strip foundation correctly (1,200mm)
(Award 3 marks or zero)
3
Measured and marked the depth of the strip foundation correctly (600mm)
(Award 3 marks or zero)
3
Checked and recorded the squareness using the mason square
(Award 3 marks or zero)
3
Established and recorded the plumbness using the plumb bob
(Award 2 marks or zero)
2
Used builders’ line to confirm straightness along the foundation length
(Award 2 marks or zero)
2
Recorded all measurements accurately in the field book
(Award 3 marks or zero)
3
Calculated quantities of excavation, concrete, and formwork from measurements
(Award 5 marks or zero)
5
Cleaned and organized tools and working area after completion
(Award 3 marks or zero)
3
Sub-Total36
PRODUCT CHECKLIST
Length measurement: 15,000 mm ± 50 mm
(Award 4 marks or zero)
4
Width measurement: 1,200 mm ± 25 mm
(Award 3 marks or zero)
3
Depth measurement: 600 mm ± 25 mm
(Award 3 marks or zero)
3
Squareness confirmed within tolerance using 3-4-5 method or mason square
(Award 4 marks or zero)
4
Plumbness recorded within acceptable limits
(Award 3 marks or zero)
3
Quantities calculated correctly for excavation (cubic meters)
(Award 5 marks or zero)
5
Quantities calculated correctly for concrete and formwork
(Award 5 marks or zero)
5
Sub-Total27
GRAND TOTAL63
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Take off quantities for superstructure walls, columns, and slabsPractical 3
🔒Measurement and Quantification of Doors, Windows, and Surface FinishesPractical 4
🔒Measurement and Recording of Internal and External FittingsPractical 5
🔒Perform Working Up Process for Measured Building QuantitiesPractical 6
🔒Abstract measured quantities for a single room masonry wallPractical 7
🔒Prepare detailed billing papers for a single room walling projectPractical 8
🔒Prepare Bill of Quantities Using Direct Billing Method for Masonry WallPractical 9
🔒Measurement and Compilation of Billing Quantities Using Cut and Shuffle MethodPractical 10
🔒Compilation of Bill of Quantities for a Single Room Residential BuildingPractical 11
🔒Prepare Operational Bills for a Single Storey Residential WallingPractical 12
🔒Prepare Elemental Bills for a Single-Storey Residential BuildingPractical 13
🔒Prepare trade bills for a single-storey residential buildingPractical 14
🔒Prepare Activity Bills with Detailed Annotations for Building WorksPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Accurately interpret the details of building elements from working drawings.
  • Measure building elements correctly using the standard methods for building and civil engineering works.
  • Properly complete the working up process based on the building elements.
  • Carry out abstracting tasks following the relevant code of practice.
  • Prepare billing papers correctly in line with the code of practice.
  • Compile the bill of quantities accurately using the standard measurement methods.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.