Setting out is a fundamental activity in building construction that establishes the exact positions of structures on a site. Precision in setting out ensures that the building is constructed according to design specifications, avoiding costly mistakes and rework. In Kenya, where urban development and infrastructure projects are rapidly expanding, mastery of setting out tools, equipment, and materials is critical for building technologists to deliver quality projects on schedule. This chapter covers the essential tools, equipment, and materials used during setting out, highlighting their types and practical applications.
Accurate setting out depends on the careful selection and use of appropriate tools and equipment. These instruments enable building technologists to transfer design dimensions from plans to the site, mark reference points, and establish levels. In Kenya, construction sites vary from urban high-rise developments to rural housing projects, requiring versatile and reliable setting out tools. Understanding the types of tools and their uses improves efficiency and reduces errors during the preliminary works phase.
Setting out tools encompass a range of instruments designed to measure distances, angles, and levels precisely. The choice of tools depends on project scale, site conditions, and accuracy requirements.
Measuring tapes made of steel or fiberglass are common for short to medium distances, typically 5m to 100m lengths. Steel chains, often 20m long with metal links, are used in rough terrain where tapes may be damaged. These tools provide linear measurements critical for marking foundation lines and building footprints.
Theodolites are optical instruments that measure horizontal and vertical angles with high precision, essential for laying out complex structures. Total stations integrate electronic distance measurement with angle measurement, allowing for rapid and accurate data collection and transfer to digital formats.
Spirit levels contain a bubble vial to indicate horizontality, used for setting horizontal reference lines. Laser levels emit a laser beam for projecting level lines over long distances, greatly improving speed and accuracy on large sites such as schools or hospitals.
Plumb bobs are weighted pointers suspended by a string, used to establish vertical alignment. Ranging rods are tall, brightly coloured poles used to mark points and guide sighting during linear measurements.
Chalk lines and marking paint are used to transfer measurements onto surfaces. These tools ensure visibility of reference lines on soil, concrete, or timber, facilitating subsequent construction activities.
Each setting out tool has specific applications that contribute to the precision and efficiency of site layout.
Measuring tapes and chains are used to establish exact distances between points on the ground, such as foundation corners or wall lines. For instance, in a retail mall project in Nairobi, steel tapes provided reliable measurements despite uneven terrain.
Theodolites and total stations enable measurement of angles between points, crucial for correct building orientation and corner placement. A county government office project used total stations to ensure the building footprint matched the architect’s design precisely.
Spirit levels and laser levels provide reference lines for foundation depth and floor elevations. In a hotel construction in Mombasa, laser levels accelerated floor leveling, reducing manual errors.
Chalk lines and marking paint are used to make visible marks that guide excavation and construction. Marking paint was extensively used on a cooperative housing site to delineate trenches and footing locations.
| Name | Specification | Use |
|---|---|---|
| Steel Measuring Tape | 30m length, steel blade, metric units | Measuring linear distances on site |
| Theodolite | Optical instrument, precision to seconds of arc | Measuring horizontal and vertical angles |
| Laser Level | Self-leveling, laser beam range up to 300m | Projecting horizontal and vertical reference lines |
| Plumb Bob | 500g brass weight, nylon string | Establishing vertical alignment |
| Ranging Rod | 2m length, painted red and white | Marking points and guiding sighting |
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the essential tools and equipment required for setting out a building site, detailing the various types and their specific uses in establishing accurate reference points. It also examined the materials commonly employed during setting out, explaining their types and how each supports precise measurement and marking. The process of marking base lines was described as a foundational step in translating design plans to physical site dimensions. Following this, the chapter covered the demarcation of the building structure, emphasizing the importance of clearly defining the layout before construction begins. Techniques for checking diagonals were presented to ensure the accuracy and squareness of the layout, with a focus on practical methods for verification. Together, these components form a comprehensive guide to the initial and critical phase of building site preparation, ensuring that construction proceeds on a precise and reliable foundation.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Tripod Stand | Field Book |
| Dumpy Level | Graph Paper |
| Levelling Staff | Safety Boots |
| Measuring Tape | Dust Coat/Overall |
| Pegs | |
| Plumb Bob | |
| Builders Line | |
| Calculator | |
| Pencil | |
| Eraser |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Tripod Stand | 1 Pc per 10 Candidates |
| 2 | Dumpy Level | 1 Pc per 10 Candidates |
| 3 | Levelling Staff | 1 Pc per Candidate |
| 4 | Measuring Tape (10 meters) | 1 Pc per 5 Candidates |
| 5 | Pegs | 20 Pcs per Candidate |
| 6 | Plumb Bob | 1 Pc per 10 Candidates |
| 7 | Builders Line | 1 Pc per 5 Candidates |
| 8 | Field Book | 1 Pc per Candidate |
| 9 | Pencil | 1 Pc per Candidate |
| 10 | Eraser | 1 Pc per Candidate |
| 11 | Graph Paper | 1 Sheet per Candidate |
| 12 | Calculator | 1 Pc per Candidate |
| 13 | Safety Boots | 1 Pair per Candidate |
| 14 | Dust Coat/Overall | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identification and Demonstration of Setting Out Tools | |||
| Wore Personal Protective Equipment: Safety boots and dust coat/overall (Award 1 mark for each correctly worn PPE item) | 2 | ||
| Selected appropriate setting out tools and equipment for the task (Award 3 marks for correctly identifying and selecting all required tools) | 3 | ||
| Set up the tripod stand at convenient height and ensured stability (Award 4 marks for correct setup and stability) | 4 | ||
| Mounted the dumpy level on the tripod and secured it with the mounting knob (Award 2 marks for correct mounting and securing) | 2 | ||
| Leveled the dumpy level using tripod leg adjustments and foot screws (Award 4 marks for accurate leveling) | 4 | ||
| Adjusted the vertical plummet over the established benchmark (Award 1 mark for correct adjustment) | 1 | ||
| Focused the telescope eyepiece and levelling staff to obtain sharp image and crosshairs (Award 3 marks for clear and sharp focus) | 3 | ||
| Used the measuring tape and builders line to mark out a square grid on the ground (Award 4 marks for accurate measurement and marking) | 4 | ||
| Used the plumb bob to transfer points vertically as required (Award 2 marks for correct use of plumb bob) | 2 | ||
| Recorded staff readings accurately in the field book (Award 3 marks for complete and accurate recording) | 3 | ||
| Sub-Total | 28 | ||
| PRODUCT CHECKLIST | |||
| Correct identification and use of setting out tools and equipment demonstrated (Award 5 marks for full demonstration and correct use) | 5 | ||
| Accurate leveling and measurements recorded in field book (Award 5 marks for accuracy and neatness) | 5 | ||
| Square grid marked correctly on site using appropriate tools (Award 4 marks for correct dimensions and squareness) | 4 | ||
| Clear, neat and complete field book entries including measurements and notes (Award 3 marks for neatness and completeness) | 3 | ||
| Sub-Total | 17 | ||
| GRAND TOTAL | 45 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Tape measure (30 meters) | Field book |
| Pegs | Safety boots |
| Builders line | Dust coat/Overall |
| Plumb bob | Helmet |
| Chalk | Gloves |
| Pencil | |
| Eraser |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Tape measure (30 meters) | 1 Pc per Candidate |
| 2 | Pegs | 20 Pcs per Candidate |
| 3 | Builders line | 1 Pc per Candidate |
| 4 | Plumb bob | 1 Pc per Candidate |
| 5 | Chalk | 1 Pc per Candidate |
| 6 | Field book | 1 Pc per Candidate |
| 7 | Pencil | 1 Pc per Candidate |
| 8 | Eraser | 1 Pc per Candidate |
| 9 | Safety boots | 1 Pair per Candidate |
| 10 | Dust coat/Overall | 1 Pc per Candidate |
| 11 | Helmet | 1 Pc per Candidate |
| 12 | Gloves | 1 Pair per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and PPE | |||
| Wore Personal Protective Equipment: safety boots, dust coat/overall, helmet, gloves (Award 1 mark for each PPE donned as per workplace procedures) | 4 | ||
| Cleared and prepared the working area free from obstacles (Award 2 marks for proper clearing and preparation) | 2 | ||
| Selected appropriate materials for setting out (tape measure, pegs, builders line, plumb bob, chalk, pencil, eraser) (Award 3 marks for correct selection and identification) | 3 | ||
| Sub-Total | 9 | ||
| TASK 2: Setting Out Procedure | |||
| Measured and marked the 6000mm length accurately on the ground using tape measure and pegs (Award 4 marks for correct measurement and marking) | 4 | ||
| Measured and marked the 4000mm width perpendicular to the length using builders line and plumb bob (Award 4 marks for correct perpendicular measurement and marking) | 4 | ||
| Established and fixed pegs at all four corners of the rectangle (Award 3 marks for fixing pegs correctly at corners) | 3 | ||
| Checked and confirmed squareness of the layout using diagonal measurements (Award 4 marks for correctly checking and confirming squareness) | 4 | ||
| Recorded all measurements and observations accurately in the field book (Award 3 marks for neat and accurate recording) | 3 | ||
| Sub-Total | 18 | ||
| PRODUCT CHECKLIST | |||
| Layout dimensions: length 6000mm and width 4000mm within ±20mm tolerance (Award 6 marks for correct dimensions as per working drawing) | 6 | ||
| Layout squareness confirmed by equal diagonals within ±25mm tolerance (Award 5 marks for correct squareness check) | 5 | ||
| Pegs are firmly fixed and correctly positioned at all corners (Award 4 marks for correct peg positioning and firmness) | 4 | ||
| Clean and legible records in the field book (Award 3 marks for neat and complete recording) | 3 | ||
| Sub-Total | 18 | ||
| GRAND TOTAL | 45 | ||