By the end of this chapter, you will be able to:
Mastering these skills will help you lead a strong, organized team that keeps your construction project running smoothly and successfully.
Construction project management in architecture requires effective coordination of the site construction team to ensure projects are completed on time, within budget, and to the desired quality standards. Managing the construction team involves recruiting the right members with appropriate skills and assigning tasks that align with their expertise. In Kenya, where construction projects vary from urban commercial buildings to rural community facilities, the ability to manage diverse teams is critical for architectural professionals to deliver successful outcomes.
Recruiting the right construction team members is foundational to the success of any architectural project. The competencies, experience, and attitudes of team members directly influence the quality and efficiency of construction activities. In the Kenyan context, recruitment must also consider local labour laws, cultural dynamics, and the specific demands of the site environment. This section explores the composition of construction teams and the key factors to consider during recruitment.
A construction team on an architectural project consists of a variety of professionals and skilled workers, each contributing distinct expertise to realise the design and build objectives. The team composition depends on the project scale, complexity, and project delivery method.
The client, also called the employer or developer, is the person or organisation that initiates the project, owns the site, provides the funds and appoints the other team members. The client sets the brief describing what is to be built, the budget and the time frame, and makes key decisions throughout the project. Large clients often appoint a project manager who oversees the entire construction process, coordinates between stakeholders, manages timelines, and ensures compliance with architectural specifications. Example: a SACCO building its new head office appointed a project manager from among its staff to liaise with the architect, contractor and suppliers on its behalf.
The architect is the professional who designs the building and, under traditional contracts, administers the construction contract on the client's behalf. The architect translates the client's brief into drawings and specifications, coordinates the work of the other consultants, inspects the works and certifies payments to the contractor. In Kenya, architects must be registered with the Board of Registration of Architects and Quantity Surveyors (BORAQS) to practise. Architects are often supported by architectural technologists who provide technical input on design implementation, materials, and construction methods, bridging the gap between design and execution. Example: a private primary school selected a registered architect who had designed several school buildings to plan its new classroom block.
The quantity surveyor (QS) is the construction cost professional who advises the client on the cost of the project and manages the money side of the contract. The QS prepares cost estimates and bills of quantities, which are used to obtain tenders, and then values the work done for interim payments and assesses the cost of any changes. Quantity surveyors are registered with BORAQS. Example: a church planning a new sanctuary engaged a quantity surveyor to prepare a cost plan so the congregation knew how much to raise before construction started.
The structural engineer is the professional who designs the parts of the building that carry loads, such as foundations, columns, beams, slabs, walls and roof structures, so that the building is safe and stable. The engineer calculates loads and stresses, sizes members and reinforcement, prepares structural drawings and inspects critical stages such as reinforcement before concrete is poured. In Kenya, engineers must be registered with the Engineers Board of Kenya. Example: before approving the design of a five-storey bank branch, the county required structural calculations signed by a registered structural engineer.
The contractor is the firm that physically constructs the building according to the drawings, specifications and contract. The contractor organises labour, plant, materials and subcontractors, plans the work programme and is responsible for site safety and the quality of workmanship. Contractors in Kenya must be registered with the National Construction Authority in the category appropriate to the value and type of work. The contractor's site supervisor or foreman directly supervises daily site activities, manages labour allocation, and enforces safety standards; at a university expansion project, the foreman ensures that masonry work aligns with structural drawings.
A supplier is a firm that provides materials, components or equipment to the project, such as cement, steel, blocks, timber, roofing, sanitary fittings and electrical goods. Suppliers may be engaged directly by the contractor or nominated by the client and architect for special items. Reliable suppliers deliver the right quantity and quality on time, so selecting them is as important as selecting the builders. Example: a contractor building a lakeside hotel chose a supplier for imported sanitary ware based on its proven delivery record, because late fittings would delay the hotel's opening.
Operatives are the skilled, semi-skilled and unskilled workers who carry out the physical construction work on site. Skilled tradespersons include masons, carpenters, electricians, plumbers, and painters whose technical skills are essential to the physical construction; for instance, carpenters at a hotel project are critical for formwork and joinery finishes. Labourers carry out general site tasks such as material handling, site cleaning, and assisting skilled trades, vital for maintaining workflow continuity; on a retail mall project, labourers ensure timely delivery of materials to various workstations.
The clerk of works is the client's or architect's representative on site, employed to inspect the works continuously and confirm that they comply with the drawings and specifications. The clerk of works is usually an experienced builder who checks materials and workmanship day by day, reports problems to the architect and keeps records of progress, weather and instructions. The clerk of works cannot change the design but can bring defects to the contractor's attention. Like a quality control officer responsible for inspection and verification of works against standards and specifications, the clerk of works at a cooperative society office tests concrete strength and monitors workmanship.
Recruiting construction team members for architectural projects in Kenya requires a comprehensive assessment of multiple factors to ensure the right fit for the project demands and environment.
Experience and qualification describe a candidate's formal training, professional registration and record of similar work. Qualifications, such as trade test certificates, diplomas and degrees, show that the person has been trained, while registration with bodies such as BORAQS, the Engineers Board or the NCA shows they are legally allowed to practise. Prior involvement in projects of comparable scale and complexity ensures familiarity with expected challenges; an electrician experienced in hospital installations understands the critical nature of medical-grade wiring.
Weighted score = sum of (score × weight) for each criterion
A contractor scores a foreman candidate out of 10: experience 8 (weight 0.4), qualification 7 (weight 0.3), and references 9 (weight 0.3).
Weighted score = (8 × 0.4) + (7 × 0.3) + (9 × 0.3)
Weighted score = 3.2 + 2.1 + 2.7
Weighted score = 8.0 out of 10
Skills and abilities are what a candidate can actually do on the job: the technical, practical and personal capabilities needed for the role. Candidates must possess verified skills and qualifications relevant to their roles; for example, hiring a mason with experience in stone cladding is crucial for a heritage building restoration. Skills are best confirmed by practical trade tests, observation on trial work, or interviews with technical questions, rather than by paperwork alone.
Attitude and work ethics are the values and behaviour a person brings to work, such as honesty, reliability, punctuality, willingness to learn and respect for others. A skilled worker with a poor attitude can lower morale, waste materials and cause conflict, while a positive, dependable worker improves the whole team. Attitude is assessed through interviews, reference checks and observation during a probation period. Example: a road contractor in Kitui kept a probation period of two weeks for new operatives to observe punctuality, care of tools and cooperation before confirming them.
Cultural fit is how well a candidate's values, behaviour and working style match the organisation and the team they will join. The ability of team members to work harmoniously within diverse groups affects site morale and productivity. For example, in a multi-ethnic team building a county assembly, respect for cultural practices fosters cooperation. Cultural fit does not mean choosing people who are all the same; it means choosing people who respect diversity and share the organisation's commitment to safety, quality and teamwork.
Candidates’ availability to meet project timelines and their commitment to the project duration reduces turnover and delays. A site supervisor who commits for the entire project lifecycle ensures continuity in supervision. Availability means the person can start when needed and work the required hours, while commitment means they intend to stay until their part of the work is complete rather than leaving for another job halfway through.
Cost and budget refer to the amount the project can afford to pay for each team member compared with what candidates charge. Balancing quality and budget constraints influences recruitment decisions, and hiring highly skilled artisans may come at higher wages but reduces rework and enhances quality. Consultants' fees, contractors' prices and workers' wages must fit within the budget set by the client, while still complying with minimum wage laws. Example: a county dispensary project compared the cost of hiring an experienced plumbing subcontractor with employing casual plumbers, and chose the subcontractor because the lower risk of leaks and rework outweighed the higher price.
Recruitment must adhere to Kenyan labour regulations including contracts, minimum wages, and safety requirements to avoid legal penalties and ensure fair treatment.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the management of site construction teams, beginning with the recruitment of key team members such as the client, architect, quantity surveyor, structural engineer, contractor, supplier, operatives, and clerk of works. It emphasized critical factors to consider during recruitment, including experience, qualifications, skills, work ethics, cultural fit, availability, and budget constraints. The process of assigning tasks to team members was detailed, covering identification, prioritization, matching tasks to skills, communication, monitoring progress, addressing challenges, and providing feedback. The importance of maintaining comprehensive records on site was highlighted, focusing on daily construction reports, quality control reports, change order requests, invoices, and materials delivery receipts. Guidance for project teams to deliver specific works according to the project plan was discussed to ensure alignment and efficiency. Finally, the preparation of remuneration schedules was addressed to ensure timely and fair compensation for the workforce. This comprehensive approach supports effective coordination and successful completion of construction projects.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Pen | Candidate profiles booklet |
| Highlighter | Recruitment evaluation form |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Candidate profiles booklet | 1 Pc per Candidate |
| 2 | Recruitment evaluation form | 1 Pc per Candidate |
| 3 | Pen | 1 Pc per Candidate |
| 4 | Highlighter | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Candidate Profile Review and Selection | |||
| Wore appropriate PPE (e.g. closed shoes, neat attire) for office recruitment setting (Award 3 marks if correct PPE worn, zero if not) | 3 | ||
| Carefully reviewed each candidate profile against recruitment factors (Award up to 6 marks for thorough review of all relevant factors) | 6 | ||
| Used recruitment evaluation form correctly to score candidates (Award 5 marks for correct and consistent use of evaluation form) | 5 | ||
| Highlighted key qualifications, skills, and experience in profiles (Award 4 marks for appropriate and clear highlighting) | 4 | ||
| Considered cost and budget constraints in final selection (Award 5 marks for evidence of budget consideration) | 5 | ||
| Selected 5 suitable team members matching project requirements (Award 7 marks for appropriate and justified selection of candidates) | 7 | ||
| Sub-Total | 30 | ||
| PRODUCT CHECKLIST | |||
| Final recruitment list with 5 candidates including rationale for selection (Award 10 marks for complete, clear, and justified recruitment list) | 10 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 40 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| HB pencil | Cartridge A3 paper |
| Eraser | |
| Ruler 30 cm |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Cartridge A3 paper | 1 Pc per Candidate |
| 2 | HB pencil | 1 Pc per Candidate |
| 3 | Eraser | 1 Pc per Candidate |
| 4 | Ruler 30 cm | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and presentation of construction team roles chart | |||
| Wore correct PPE: Safety boots and helmet (Award 4 marks for wearing all required PPE, zero if missing any) | 4 | ||
| Used A3 paper and prepared a neat labelled chart (Award 5 marks for neatness, correct paper size, and clear labelling) | 5 | ||
| Identified and labelled all eight key construction team members (Award 2 marks for each correctly identified and labelled team member: Client, Architect, Quantity Surveyor, Structural Engineer, Contractor, Supplier, Operatives, Clerk of Works) | 16 | ||
| Provided clear and accurate descriptions of each team member’s role (Award 2.5 marks for each role description approximately 40-50 words and relevant to Kenyan construction context) | 20 | ||
| Sub-Total | 45 | ||
| PRODUCT CHECKLIST | |||
| Chart completeness: all eight team members present and labelled (Award 10 marks if all eight team members are present and correctly labelled, zero if less than 8) | 10 | ||
| Role descriptions accuracy and relevance (Award 10 marks for accurate role descriptions that relate to Kenyan construction projects) | 10 | ||
| Sub-Total | 20 | ||
| GRAND TOTAL | 65 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.