Wildlife Management  ·  Level 5
Human-Wildlife Interactions
Chapter 4: Mitigate human-wildlife conflicts
📚 0 Topics

Chapter Practical Activities

Practical 1: Construct a wildlife-proof barrier fence 20m long and 1.8m high

Wildlife Management · Level 5
Human-Wildlife Interactions
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Construct a wildlife-proof barrier fence 20,000mm long and 1,800mm high using steel posts and three rows of barbed wire.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Wire cuttersSteel fence posts
HammerBarbed wire rolls
Measuring tape 30mConcrete mix (bags)
Spirit levelGloves (PPE)
Safety boots (PPE)
Protective hat
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Steel fence posts10 Pcs per Candidate
2Barbed wire rolls3 Rolls per Candidate
3Concrete mix (bags)4 Bags per Candidate
4Wire cutters1 Pc per Candidate
5Hammer1 Pc per Candidate
6Measuring tape 30m1 Pc per Candidate
7Spirit level1 Pc per Candidate
8Gloves (PPE)1 Pair per Candidate
9Safety boots (PPE)1 Pair per Candidate
10Protective hat1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Candidate wears safety boots, gloves, and protective hat before starting work
(Award 1 mark each for boots, gloves, and hat worn correctly)
3
Candidate measures and marks the 20m fence line accurately
(Award 2 marks for accurate measurement within ±50mm)
2
Candidate sets out and spaces steel posts at 2m intervals along fence line
(Award 1 mark per correctly spaced post, max 3 marks)
3
Candidate mixes concrete to proper consistency for post setting
(Award 2 marks for correct concrete mix and handling)
2
Sub-Total10
TASK 2: Fence post installation
Candidate digs post holes to at least 600mm deep and 150mm diameter
(Award 3 marks for correct hole dimensions and depth)
3
Candidate sets posts vertically using spirit level and secures with concrete
(Award 2 marks for vertical alignment and 2 marks for proper concrete setting)
4
Candidate allows initial concrete set before proceeding
(Award 1 mark for observing appropriate curing time or method)
1
Sub-Total8
TASK 3: Barbed wire fixing
Candidate attaches three rows of barbed wire at heights 300mm, 900mm, and 1500mm from ground
(Award 1 mark for each correctly positioned wire row)
3
Candidate fixes barbed wire tightly and securely to posts using appropriate tools
(Award 3 marks for tension, secure knots, and neat fixing)
3
Candidate cuts excess wire cleanly with wire cutters
(Award 1 mark for neat and safe wire cutting)
1
Sub-Total7
TASK 4: Finishing and safety
Candidate cleans work area removing debris and excess materials
(Award 2 marks for thorough cleaning)
2
Candidate demonstrates safe handling of barbed wire and tools throughout
(Award 2 marks for safe practices and PPE use during task)
2
Candidate presents completed fence and explains its wildlife-proof features
(Award 3 marks for confident and accurate explanation)
3
Sub-Total7
PRODUCT CHECKLIST
Fence length is 20,000mm ±50mm as per drawing
(Award 3 marks for length within tolerance)
3
Fence height is 1,800mm ±20mm with three wire rows at 300mm, 900mm, and 1500mm ±10mm
(Award 4 marks for height and wire row spacing accuracy)
4
Posts are vertically plumb and spaced evenly at 2,000mm ±50mm
(Award 4 marks for plumbness and post spacing)
4
Barbed wire is taut with no sagging and securely fixed
(Award 3 marks for wire tension and secure fixing)
3
Fence is free from sharp wire ends or hazards, and neat in appearance
(Award 2 marks for safety and neatness)
2
Sub-Total16
GRAND TOTAL48
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Install a solar-powered wildlife deterrent alarm system 600mm x 400mm x 300mm

Wildlife Management · Level 5
Human-Wildlife Interactions
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Install and calibrate a solar-powered wildlife deterrent alarm system mounted on two 2m poles spaced 1.5m apart, with the alarm unit measuring 600mm x 400mm x 300mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Cordless drill with screwdriver bitsSolar-powered wildlife alarm unit
Measuring tape (5m)Mounting poles (galvanized steel, 2m length)
Spirit levelSteel mounting brackets
MultimeterRechargeable 12V battery
Marker penSolar panel 50W
Electrical wiring (3-core, 10m length)
Screws and bolts set
Cable ties
Insulating electrical tape
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Solar-powered wildlife alarm unit1 Pc per Candidate
2Mounting poles (galvanized steel, 2m length)2 Pcs per Candidate
3Steel mounting brackets4 Pcs per Candidate
4Rechargeable 12V battery1 Pc per Candidate
5Solar panel 50W1 Pc per Candidate
6Electrical wiring (3-core, 10m length)10 m per Candidate
7Screws and bolts set1 set per Candidate
8Cable ties10 Pcs per Candidate
9Insulating electrical tape1 roll per Candidate
10Safety gloves1 pair per Candidate
11Safety boots1 pair per Candidate
12Khaki field gear (trousers and shirt)1 set per Candidate
13Cape/hat1 Pc per Candidate
14Multimeter1 Pc per Candidate
15Cordless drill with screwdriver bits1 Pc per Candidate
16Measuring tape (5m)1 Pc per Candidate
17Spirit level1 Pc per Candidate
18Marker pen1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Personal Protective Equipment and Preparation
Candidate wears complete field gear including boots, khaki uniform, and hat/cape
(Award 2 marks if all worn correctly, else 0)
2
Candidate wears safety gloves before handling electrical components
(Award 1 mark if gloves worn at appropriate times, else 0)
1
Sub-Total3
TASK 2: Installation of Mounting Poles and Alarm Unit
Candidate measures and marks 1.5m spacing between two mounting poles accurately
(Award 2 marks for correct measurement within ±25mm, else 0)
2
Candidate fixes mounting poles vertically plumb using spirit level
(Award 2 marks if poles are plumb within ±2 degrees, else 0)
2
Candidate attaches alarm unit securely to mounting poles using brackets and screws
(Award 3 marks if alarm is firmly fixed without wobble, else 0)
3
Sub-Total7
TASK 3: Electrical Connections and Calibration
Candidate connects solar panel, battery, and alarm unit wiring correctly according to schematic
(Award 3 marks for correct polarity and connections, else 0)
3
Candidate insulates all wiring joints properly using electrical tape and cable ties
(Award 2 marks if all joints insulated and tidy, else 0)
2
Candidate uses multimeter to verify voltage output and battery charge
(Award 2 marks if readings taken and within expected range, else 0)
2
Candidate calibrates alarm sensitivity and tests alarm audibility
(Award 3 marks if alarm triggers correctly and is audible at 20m, else 0)
3
Sub-Total10
TASK 4: Site Clean-Up and Reporting
Candidate cleans work area of debris and excess materials
(Award 1 mark if area left clean, else 0)
1
Candidate completes and submits installation checklist/report accurately
(Award 2 marks if report is complete and legible, else 0)
2
Sub-Total3
PRODUCT CHECKLIST
Alarm unit mounted at 1.5m spacing on poles, dimensions 600mm x 400mm x 300mm confirmed
(Award 3 marks if dimensions and spacing are as specified, else 0)
3
Mounting poles vertically plumb within ±2 degrees
(Award 2 marks if poles plumb, else 0)
2
Alarm system functions correctly: solar panel charging, battery powering alarm, alarm audible at 20m
(Award 5 marks if all functions verified, else 0)
5
Sub-Total10
GRAND TOTAL33
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Set up a wildlife water point 2000mm diameter x 1200mm depth away from human settlementsPractical 3
🔒Construct animal-proof storage facility for livestock feedPractical 4
🔒Installation and Maintenance of Wildlife Underpass 4m x 3m x 3mPractical 5
🔒Implement Controlled Burning for Habitat ManagementPractical 6
🔒Construct a trench barrier 3000mm long, 600mm wide and 800mm deep to mitigate human-wildlife conflictPractical 7
🔒Install and Test a Wildlife Early Warning Sensor SystemPractical 8
🔒Construct a wildlife-resistant livestock enclosurePractical 9