Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Tape measure | Gloves |
| Panga | Gumboots |
| Rake | Apron |
| Wheelbarrow | Mask |
| Waste disposal bags |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Unploughed land | 3m by 3m per Candidate |
| 2 | Tape measure | 1 Pc per Candidate |
| 3 | Panga | 1 Pc per Candidate |
| 4 | Rake | 1 Pc per Candidate |
| 5 | Wheelbarrow | 1 Pc per Candidate |
| 6 | Gloves | 1 Pair per Candidate |
| 7 | Gumboots | 1 Pair per Candidate |
| 8 | Apron | 1 Pc per Candidate |
| 9 | Mask | 1 Pc per Candidate |
| 10 | Waste disposal bags | 2 per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Site Selection and Clearing | |||
| Wore Personal Protective Equipment as per workplace procedures: Gloves, Apron, Gumboots, Mask (Award 1 mark for each correctly worn PPE or 0) | 4 | ||
| Selected an appropriate site measuring exactly 3m by 3m and demarcated it using tape measure (Award 2 marks each for correct measurement and demarcation or 0) | 4 | ||
| Cleared the site of all debris and unwanted vegetation using panga and rake (Award 3 marks each for clearing debris and vegetation or 0) | 6 | ||
| Collected and disposed of waste appropriately using waste disposal bags (Award 3 marks for proper collection and disposal or 0) | 3 | ||
| Maintained personal hygiene by washing hands and cleaning tools after clearing (Award 1 mark each for washing hands and cleaning tools or 0) | 2 | ||
| Stored tools and equipment in designated area appropriately (Award 1 mark or 0) | 1 | ||
| Sub-Total | 20 | ||
| PRODUCT CHECKLIST | |||
| Site cleared is exactly 3m by 3m with no debris or unwanted vegetation remaining (Award 5 marks for correct size and complete clearing or 0) | 5 | ||
| Sub-Total | 5 | ||
| GRAND TOTAL | 25 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Panga | Well decomposed manure |
| Jembe/Fork jembe | D.A.P fertilizer |
| Rake | Water |
| Tape measure | Mulching materials |
| Wheelbarrow | Apron |
| Watering can | Gumboots |
| Pegs | Gloves |
| Mask |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Unploughed land | 3m by 3m per Candidate |
| 2 | Panga | 1 Pc per Candidate |
| 3 | Jembe/Fork jembe | 1 Pc per Candidate |
| 4 | Rake | 1 Pc per Candidate |
| 5 | Tape measure | 1 Pc per Candidate |
| 6 | Wheelbarrow | 1 Pc per Candidate |
| 7 | Well decomposed manure | 2 kg per Candidate |
| 8 | D.A.P fertilizer | 150 grams per Candidate |
| 9 | Water | Enough per Candidate |
| 10 | Watering can | 1 Pc per Candidate |
| 11 | Mulching materials | 5 kg per Candidate |
| 12 | Apron | 1 Pc per Candidate |
| 13 | Gumboots | 1 Pair per Candidate |
| 14 | Gloves | 1 Pair per Candidate |
| 15 | Mask | 1 Pc per Candidate |
| 16 | Pegs | 4 Pcs per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Soil Preparation for Dairy Forage Planting | |||
| Wore Personal Protective Equipment (Gloves, Apron, Gumboots, Mask) (Award 1 mark for each correctly worn PPE or 0) | 4 | ||
| Measured and demarcated the 3m by 3m planting site using tape measure and pegs (Award 2 marks each for measuring length, width and demarcation or 0) | 6 | ||
| Cleared the land of debris and unwanted vegetation (Award 2 marks or 0) | 2 | ||
| Carried out primary cultivation by digging/tilling the soil using panga and jembe (Award 2 marks or 0) | 2 | ||
| Carried out secondary cultivation by breaking soil clods and leveling using rake (Award 2 marks or 0) | 2 | ||
| Applied well decomposed manure evenly over the seedbed (2 kg total) (Award 2 marks or 0) | 2 | ||
| Applied D.A.P fertilizer evenly over the seedbed (150 grams total) (Award 2 marks or 0) | 2 | ||
| Mixed manure, D.A.P fertilizer and soil thoroughly (Award 2 marks or 0) | 2 | ||
| Disposed of any waste materials at an appropriate place (Award 1 mark or 0) | 1 | ||
| Observed personal hygiene by washing hands and face after work and cleaned tools (Award 1 mark each for washing and cleaning or 0) | 2 | ||
| Stored tools and equipment appropriately after use (Award 1 mark or 0) | 1 | ||
| Sub-Total | 26 | ||
| PRODUCT CHECKLIST | |||
| Seedbed prepared measuring 3m length by 3m width, tilled and leveled evenly (Award 3 marks for correct 3m length and 3 marks for correct 3m width or 0) | 6 | ||
| Soil surface free of large clods and debris, uniformly mixed with manure and fertilizer (Award 3 marks or 0) | 3 | ||
| Seedbed is flat and well-leveled with no waterlogging areas (Award 4 marks or 0) | 4 | ||
| Sub-Total | 13 | ||
| GRAND TOTAL | 39 | ||