Industrial Control and Installation  ·  Level 6
Installation And Maintanance
Chapter 2: Mount SCADA system components
📚 9 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Follow safety procedures to handle cables safely and meet OSHA standards.
  • Perform piping tasks accurately by reading and using working drawings.
  • Complete piping work correctly by following standard operating procedures.
  • Lay the right number and size of cables in conduits according to IEE regulations.
  • Install cables, conduits, enclosures, and support systems exactly as shown in the working drawings.
  • Draw in cables safely while following the standard operating procedures.

Mastering these skills will help you install SCADA system components confidently and safely, making you a valuable technician in the field.

Industrial Control and Installation professionals in Kenya rely heavily on robust communication networks to ensure seamless data exchange between controllers, sensors, and supervisory systems. A critical aspect of this infrastructure is the selection and mounting of appropriate cables that connect Programmable Logic Controllers (PLCs) to various input/output (I/O) devices and network components. Understanding the types, specifications, and applications of these cables is essential for maintaining reliable industrial automation systems, minimizing downtime, and ensuring safety compliance.

2.1 PLC Network Working Cables with I/O

In industrial control environments, PLC networks utilize diverse cable types to facilitate communication between devices. These cables must meet stringent standards to withstand industrial conditions such as electrical interference, mechanical stress, and temperature variations common in Kenyan manufacturing plants, water treatment facilities, and food processing industries. The following sections detail the primary cable types used in PLC networks, their specifications, and installation considerations.

2.1.1 Ethernet Cable Modules

Types of Ethernet Cables

  • Category 5e (Cat5e): Supports speeds up to 1 Gbps and frequencies up to 100 MHz, suitable for most industrial Ethernet applications.
  • Category 6 (Cat6): Offers higher performance with speeds up to 10 Gbps at 250 MHz, used in high-speed data transfer.
  • Shielded Twisted Pair (STP): Incorporates shielding to reduce electromagnetic interference (EMI), essential in noisy industrial environments.
  • Unshielded Twisted Pair (UTP): More common and cost-effective but less resistant to EMI; used in less electrically noisy areas.
  • Fiber Optic Ethernet Cables: Used for long-distance and high-bandwidth communication, immune to EMI.

Ethernet Cable Modules Specifications

Name Specification Use
RJ45 Connector 8P8C modular plug, gold-plated pins Connects Ethernet cables to devices
Industrial Ethernet Module Supports 10/100/1000 Mbps speeds, rugged casing Interfaces PLCs with Ethernet networks
  • Ensure connectors are rated for industrial use to resist corrosion and physical damage.
  • Modules often include LEDs for link and activity status to aid troubleshooting.

Installation and Maintenance of Ethernet Cables

  • Route cables away from high-voltage cables to minimize interference.
  • Use cable trays or conduits to protect cables from mechanical damage.
  • Test cable continuity and signal integrity using a cable tester before commissioning.
  • Regularly inspect connectors for corrosion and ensure secure termination.
  • Replace damaged or worn cables promptly to avoid network failures.

Performance Considerations in Kenyan Industrial Settings

  • Harsh environments with dust and moisture require cables with appropriate IP ratings.
  • Power surges and lightning strikes in rural plants necessitate surge protection devices.
  • Cable lengths should not exceed Ethernet standards (100 meters for copper cables) to avoid signal degradation.

2.1.2 USB Cable

Universal Serial Bus (USB) cables are commonly used for programming and diagnostics of PLCs and SCADA devices in the field.

USB Cable Types for Industrial Use

  • USB Type A to Type B: Standard for connecting PLCs to programming laptops or HMIs.
  • USB Mini and Micro: Used for smaller handheld devices or portable data loggers.
  • USB 2.0 and 3.0: Offer data transfer rates of 480 Mbps and up to 5 Gbps respectively, though industrial devices often use USB 2.0.

Specifications and Connectors

Name Specification Use
USB Type A Rectangular connector, 4 pins Host connection (PC or HMI)
USB Type B Square connector, 4 pins Device connection (PLC port)
Shielding Foil and braid shielding Reduces EMI in industrial areas
  • Industrial USB cables often have reinforced jackets for durability.
  • Shielding is critical to prevent data corruption in electrically noisy environments.

Proper Handling and Installation

  • Avoid sharp bends to prevent cable damage.
  • Disconnect cables by the connector, not the cable body, to prolong lifespan.
  • Use cable ties and clips to secure cables and prevent strain on connectors.
  • Keep cables away from high-current power lines to avoid interference.
  • Inspect cables regularly for wear and replace as needed.

Application Scenarios in Kenya

  • USB cables are essential during PLC programming and firmware updates in manufacturing plants.
  • They enable quick diagnostics and data retrieval in water treatment facilities.
  • Portable SCADA devices use USB for data logging in agricultural irrigation projects.

2.1.3 Serial Cable

Serial communication remains relevant in many industrial installations due to legacy equipment and simple point-to-point connections.

Types of Serial Cables

  • RS-232: Common for short-distance communication (up to 15 meters), typically with DB9 or DB25 connectors.
  • RS-485: Supports multi-drop networks over longer distances (up to 1200 meters), ideal for industrial environments.
  • RS-422: Similar to RS-485 but supports full-duplex communication.

Serial Cable Specifications

Name Specification Use
DB9 Connector 9-pin D-sub connector Connects serial devices and PLC ports
Twisted Pair Cable Shielded twisted pairs Minimizes noise over long distances
  • RS-485 cables often use differential signaling to reduce noise.
  • Shielding and grounding are essential to maintain signal integrity.

Installation Best Practices

  • Maintain proper cable polarity to avoid communication errors.
  • Use termination resistors at the ends of RS-485 networks to prevent signal reflections.
  • Keep cables away from sources of strong electromagnetic interference.
  • Label cables clearly for maintenance and troubleshooting.
  • Test communications with loopback or diagnostic tools after installation.

Relevance in Kenyan Industrial Controls

  • Many water pumping stations still use RS-485 for SCADA telemetry.
  • RS-232 serial communication is common in older machinery in manufacturing plants.
  • Serial cables connect remote sensors in agricultural cooperatives to central controllers.

2.1.4 Profinet Cables

Profinet is a widely adopted industrial Ethernet standard for real-time automation communication.

Characteristics of Profinet Cables

  • Designed for high-speed data transfer with deterministic timing.
  • Typically use Cat5e or Cat6 cable with shielding.
  • Support Power over Ethernet (PoE) to power devices through the cable.

Profinet Cable Specifications

Name Specification Use
Profinet Cable Shielded twisted pair, Cat5e or Cat6 Connects Profinet devices and PLCs
M12 Connector IP67 rated circular connector Used in harsh industrial environments
  • M12 connectors ensure dust and water resistance.
  • Cables have enhanced shielding to maintain signal quality.

Installation Procedures for Profinet Cables

  1. Verify cable length does not exceed 100 meters per segment.
  2. Use shielded cables and properly ground shields at one end.
  3. Connect cables using M12 or RJ45 connectors rated for industrial use.
  4. Secure cables with cable ties avoiding excessive tension.
  5. Test network integrity using Profinet diagnostic tools.
  6. Label cables clearly with device addresses for easy identification.

Importance in Industrial Automation

  • Profinet enables fast and reliable communication between PLCs and field devices.
  • Its robustness suits Kenyan factories with high electrical noise.
  • PoE reduces wiring complexity by supplying power and data in one cable.

2.1.5 Profibus Cables

Profibus is a fieldbus communication standard used for connecting automation devices in industrial environments.

Profibus Cable Types and Features

  • Profibus DP (Decentralized Peripherals): Uses shielded twisted pair cables for high-speed communication.
  • Profibus PA (Process Automation): Uses cables with additional conductors for power and data in hazardous environments.

Specifications of Profibus Cables

Name Specification Use
Shielded Twisted Pair 2-core, 0.8 mm² conductors, 150 Ω impedance Data transmission in Profibus DP
Profibus PA Cable 4-core, includes power conductors Process automation devices
  • Cables include shielding to reduce EMI.
  • Impedance matching is crucial to prevent data loss.

Installation Guidelines

  • Install cables in dedicated conduits to avoid interference.
  • Use terminators at both ends of the Profibus segment.
  • Avoid sharp bends and maintain minimum bending radius.
  • Ground shields at one end to prevent ground loops.
  • Verify cable continuity and impedance before commissioning.
  • Maintain clear documentation of cable routes and device connections.

Use Cases in Kenyan Industry

  • Profibus DP is common in manufacturing plants for connecting drives and sensors.
  • Profibus PA is used in chemical processing plants requiring intrinsic safety.
  • Enables integration of field devices with SCADA systems in energy plants.

2.1.6 Coaxial Cables

Coaxial cables, though less common today, are still used in some industrial control applications for analog signals and video transmission.

Structure and Types of Coaxial Cables

  • Consist of a central conductor, dielectric insulator, metallic shield, and outer jacket.
  • Types include RG-58, RG-59, and RG-6, differing in impedance and shielding.

Specifications

Name Specification Use
RG-58 50 Ω impedance, 0.8 mm conductor Used in data and RF signal transmission
RG-59 75 Ω impedance, thicker dielectric Used for video signals and CCTV
  • Shielding protects against electromagnetic interference.
  • Cable impedance must match connected devices to avoid signal reflection.

Installation and Maintenance

  • Maintain consistent cable impedance throughout the installation.
  • Use proper connectors such as BNC or N-type for secure connections.
  • Avoid sharp bends and kinks to prevent signal degradation.
  • Inspect connectors for corrosion and secure fit regularly.
  • Ground cable shields properly to reduce noise.

Industrial Applications in Kenya

  • Used in CCTV surveillance systems at manufacturing and warehouse facilities.
  • Employed in analog signal transmission in legacy control systems.
  • Suitable for short-distance RF communication in agricultural monitoring stations.

Practice Questions

  1. Explain the key differences between Ethernet Cat5e and Cat6 cables and their implications for industrial control systems. (10 marks)
  2. Describe the installation steps for Profinet cables ensuring compliance with industrial standards. (12 marks)
  3. List and explain five maintenance practices for USB cables used in PLC programming. (10 marks)
  4. Discuss the reasons for using shielded twisted pair cables in Profibus networks and how improper installation can affect system performance. (12 marks)
  5. Compare the structure and typical uses of RG-58 and RG-59 coaxial cables in industrial control installations. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Fiber optic cables PLC cable layout and cable management assignments

In industrial control and installation in Kenya, efficient cable layout and management are critical for system reliability, safety, and maintenance ease. Fiber optic cables and PLC cables form the backbone of communication and control within SCADA systems, ena…

🔒2.3 Network Cables Termination

Network cable termination is a critical procedure in industrial control systems, ensuring secure and reliable connections between devices such as PLCs, RTUs, and SCADA servers. Proper termination prevents signal loss, electrical interference, and mechanical fa…

🔒2.4 Network cables testing

In industrial control and installation environments across Kenya, reliable network communication is critical to ensure seamless data exchange between SCADA system components. Testing network cables is an essential maintenance activity that guarantees integrity…

🔒2.5 PLC device communication protocols and channels

In the realm of Industrial Control and Installation in Kenya, understanding PLC device communication protocols and channels is essential for ensuring seamless control and data exchange between devices. PLCs (Programmable Logic Controllers) act as the backbone…

🔒2.6 PLC memory addressing

PLC memory addressing is fundamental to programming and configuring industrial control systems. In Kenyan industrial installations such as manufacturing plants and water treatment facilities, understanding how PLCs organize and access memory enables profession…

🔒2.7 Human Machine Interface

In the context of industrial control and installation in Kenya, the Human Machine Interface (HMI) is a critical component that enables operators to interact efficiently with SCADA systems. HMIs serve as the visual and control gateway for monitoring and managin…

🔒2.8 Configuration of Network Ports

Network ports are essential interfaces on SCADA system components that enable connectivity and communication. In Kenya's industrial control environments, proper configuration of these ports ensures reliable data transfer between devices such as PLCs, HMIs, ser…

🔒2.9 Practice: Network Cable Termination Program PLC

In industrial control and installation environments in Kenya, proper network cable termination and programming of Programmable Logic Controllers (PLCs) are critical for reliable SCADA system operation. Industrial facilities such as manufacturing plants, water…

Chapter Summary

This chapter covered the essential components of SCADA system installation and maintenance, beginning with an overview of PLC network working cables including various types such as Ethernet cable modules, USB cables, serial cables, Profinet cables, Profibus cables, and coaxial cables. It then addressed fiber optic cables used in PLC cable layouts along with proper cable management assignments to ensure system reliability. The chapter explained network cable termination procedures and emphasized the importance of correct termination for optimal communication. Various network cable testing methods were discussed, highlighting the use of professional testers, continuity testers, LAN cable testers, and phone line testers to verify cable integrity. An introduction to PLC device communication protocols and channels illustrated the means by which devices interact within the network. The chapter also covered PLC memory addressing techniques that support efficient data handling. Human machine interfaces were described as critical tools for operator interaction with the SCADA system. Finally, configuration of network ports was examined, focusing on Ethernet, USB, HDMI, and Mac serial ports, concluding with practical exercises on network cable termination and PLC programming to reinforce the theoretical concepts.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which type of cable is commonly used for high-speed Ethernet communication in PLC networks? (2 marks)
  2. Describe the main difference between USB and Serial cables in PLC communication. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe the primary function of Ethernet cable modules in a SCADA PLC network. (4 marks)
  2. Explain the difference between USB cables and serial cables used in PLC communications. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Mounting and Managing PLC Network Cables with I/O

Industrial Control and Installation · Level 6
Installation And Maintanance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Mount and arrange PLC network cables with I/O modules inside a 600mm x 400mm x 200mm control panel, with trunking and labeling.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Screwdriver setPLC (Siemens S7-1200)
Wire stripperI/O Module (Digital Input/Output)
Side cutterCat6 PLC Network Cable (blue)
MultimeterShielded signal cable (8 core, 1.0mm2)
Spirit levelCable trunking (PVC, 25mm x 25mm)
Measuring tapeCable ties (100mm)
Cable markers/labels
Control panel enclosure (600mm x 400mm x 200mm)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1PLC (Siemens S7-1200)1 Pc per Candidate
2I/O Module (Digital Input/Output)2 Pcs per Candidate
3Cat6 PLC Network Cable (blue)3 Metres per Candidate
4Shielded signal cable (8 core, 1.0mm2)3 Metres per Candidate
5Cable trunking (PVC, 25mm x 25mm)1.5 Metres per Candidate
6Cable ties (100mm)10 Pcs per Candidate
7Cable markers/labels1 Set per Candidate
8Screwdriver set1 Set per Candidate
9Wire stripper1 Pc per Candidate
10Side cutter1 Pc per Candidate
11Multimeter1 Pc per Candidate
12Spirit level1 Pc per Candidate
13Measuring tape (3m)1 Pc per Candidate
14Control panel enclosure (600mm x 400mm x 200mm)1 Pc per Candidate
15Overall1 Pc per Candidate
16Safety boots1 Pair per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Mounting and Cable Management Process
Wore overall and safety boots before starting work
(Award 2 marks for correct PPE use or zero)
2
Checked and verified all tools and materials per cutting list
(Award 2 marks for all items checked and ready or zero)
2
Mounted PLC and I/O modules firmly inside the control panel using appropriate fasteners
(Award 4 marks for correct and level mounting or zero)
4
Installed cable trunking neatly and securely inside the panel
(Award 3 marks for straight, level, and secure trunking or zero)
3
Cut and stripped network and I/O cables to correct lengths (±20mm tolerance)
(Award 3 marks for correct cable lengths and neat stripping or zero)
3
Laid and routed all cables inside trunking with no crossings or unnecessary loops
(Award 4 marks for neat, parallel cable routing or zero)
4
Secured cables with cable ties at regular intervals (≤200mm apart)
(Award 2 marks for correct spacing and tightness or zero)
2
Labeled all cables at both ends using cable markers/labels
(Award 2 marks for all correct and legible labels or zero)
2
Used spirit level to confirm trunking and module alignment
(Award 2 marks for correct use or zero)
2
Sub-Total24
PRODUCT CHECKLIST
Control panel dimension: 600mm x 400mm x 200mm achieved
(Award 2 marks for correct panel size as specified)
2
All mounted components aligned horizontally and vertically (checked with spirit level)
(Award 3 marks for all components level and aligned or zero)
3
Cable trunking installed straight and flush to panel surface
(Award 2 marks for straight, flush trunking or zero)
2
No excess cable visible; all cables neatly terminated within 20mm tolerance
(Award 3 marks for cable ends within tolerance or zero)
3
Cables clearly labeled at both ends matching schematic
(Award 2 marks for all correct labels or zero)
2
I/O modules and PLC connections correspond exactly to the provided schematic
(Award 4 marks for all connections correct per schematic or zero)
4
No visible cable damage; insulation intact
(Award 2 marks for all cable insulation intact or zero)
2
Continuity test for network and I/O cables passed using multimeter
(Award 2 marks for all cables passing test or zero)
2
Sub-Total20
GRAND TOTAL44
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Installation and Configuration of Ethernet Cable Modules for SCADA Communication

Industrial Control and Installation · Level 6
Installation And Maintanance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Install two Ethernet cable modules and terminate a 5m Cat6 Ethernet cable with RJ45 connectors for SCADA communication between PLC and HMI.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Crimping tool (RJ45)Cat6 Ethernet cable
Cable stripperRJ45 connectors
Screwdriver setEthernet module (panel-mount keystone jack)
Digital MultimeterSCADA control panel (with PLC and HMI)
Cable tester (RJ45)Cable ties
Marker pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Cat6 Ethernet cable (5m length)1 Pc per Candidate
2RJ45 connectors2 Pcs per Candidate
3Ethernet module (panel-mount keystone jack)2 Pcs per Candidate
4SCADA control panel (with PLC and HMI)1 Pc per Candidate
5Crimping tool (RJ45)1 Pc per 2 Candidates
6Cable stripper1 Pc per Candidate
7Screwdriver set1 Set per Candidate
8Digital Multimeter1 Pc per Candidate
9Cable tester (RJ45)1 Pc per 2 Candidates
10Cable ties5 Pcs per Candidate
11Marker pen1 Pc per Candidate
12Safety boots1 Pair per Candidate
13Overall1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Observing Installation Process
Wore safety boots and overall before commencing work
(Award 2 marks for correct PPE use or zero)
2
Checked and prepared all tools and materials required for the task
(Award 2 marks for correct preparation or zero)
2
Measured and cut Cat6 Ethernet cable to 5m length accurately
(Award 2 marks for correct measurement and cutting or zero)
2
Stripped cable ends and prepared conductors without damaging wires
(Award 2 marks for proper stripping and preparation or zero)
2
Crimped RJ45 connectors on both ends using correct colour code (TIA/EIA-568B standard)
(Award 2 marks for each end correctly crimped and colour coded, or zero)
4
Installed two Ethernet modules (keystone jacks) firmly and level in the SCADA panel
(Award 2 marks per module correctly installed, or zero)
4
Terminated cables into Ethernet modules as per provided schematic
(Award 2 marks per termination, or zero)
4
Used cable ties to secure cables neatly and labelled both ends
(Award 1 mark for neat securing, 1 mark for correct labelling, or zero)
2
Tested cable continuity and port connections using cable tester and multimeter
(Award 2 marks for both tests done correctly, or zero)
2
Sub-Total24
TASK 2: Configuring Ethernet Ports
Accessed PLC and HMI Ethernet port settings via the SCADA interface
(Award 2 marks for correct access, or zero)
2
Assigned correct static IP addresses as per schematic to both PLC and HMI
(Award 2 marks per device configured, or zero)
4
Verified SCADA communication status between PLC and HMI after configuration
(Award 2 marks for successful verification, or zero)
2
Sub-Total8
PRODUCT CHECKLIST
Cat6 cable length between modules is exactly 5000mm ±50mm
(Award 2 marks for correct cable length or zero)
2
RJ45 terminations are firm, colour code correct, and pass cable tester continuity
(Award 2 marks per end correctly terminated and tested, or zero)
4
Ethernet modules are mounted level, firm, and flush with the panel face
(Award 1 mark per module, or zero)
2
Cables are secured, labelled, and routed neatly inside panel
(Award 2 marks for neatness and labelling, or zero)
2
SCADA system shows successful communication between PLC and HMI via Ethernet
(Award 4 marks for fully functional communication, or zero)
4
Sub-Total14
GRAND TOTAL46
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Connecting and Configuring USB Cables and Ports for SCADA Device InterfacePractical 3
🔒Mounting and Configuring Serial Cables and Ports for SCADA System CommunicationPractical 4
🔒Installation of Profinet Cables and Configuration of PLC Communication ChannelsPractical 5
🔒Mounting and Terminating Profibus Cables for SCADA CommunicationPractical 6
🔒Installation of Coaxial Cables for SCADA Network ConnectionsPractical 7
🔒Mounting and Managing Fiber Optic Cable Layout for SCADA SystemPractical 8
🔒Terminate and Test Network Cables for SCADA System InstallationPractical 9
🔒Testing Network Cables Using Professional TestersPractical 10
🔒Check SCADA Cable Continuity Using Continuity TesterPractical 11
🔒Assessment of LAN Cables for Faults and Integrity Using LAN Cable TesterPractical 12
🔒Testing and Documentation of Phone Lines Using a Phone Line TesterPractical 13
🔒Configure Network Ports for SCADA DevicesPractical 14
🔒Programming PLC and Setting up HMI for SCADA Control PanelPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Follow safety procedures to handle cables safely and meet OSHA standards.
  • Perform piping tasks accurately by reading and using working drawings.
  • Complete piping work correctly by following standard operating procedures.
  • Lay the right number and size of cables in conduits according to IEE regulations.
  • Install cables, conduits, enclosures, and support systems exactly as shown in the working drawings.
  • Draw in cables safely while following the standard operating procedures.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.