Installation and maintenance of SCADA (Supervisory Control and Data Acquisition) systems require meticulous preparation of the installation site to ensure operational reliability and safety. In Kenya’s industrial control sector, where SCADA systems monitor and manage critical infrastructure such as water treatment plants, manufacturing lines, and energy distribution-site preparation must align with strict safety protocols and regulatory standards. This chapter focuses on the essential health and safety considerations, hardware specifications, and environmental controls necessary before SCADA installation begins.
1.1 Health and Safety; Hardware
The health and safety of personnel and the integrity of hardware are paramount during SCADA system installation. This section addresses the safety of operators, the use of personal protective equipment (PPE), assessment and management of work permits, proper waste management, adherence to electrical wiring colour codes, installation of danger warning signage and barricades, high voltage signage, and health policy assessments related to hardware mounting. Each topic reflects the specific challenges and standards encountered in industrial control environments across Kenya.
1.1.1 Operator Safety
Ensuring the safety of operators working on SCADA installations is a fundamental responsibility of all project managers and technicians. Operators often interact directly with electrical equipment, control panels, and communication devices that pose various hazards.
Identifying Risks in SCADA Installation Sites
- Electrical hazards: Exposure to live wires, faulty grounding, or short circuits can cause electric shocks or burns.
- Mechanical hazards: Moving parts in control cabinets or attached machinery may cause injuries.
- Ergonomic risks: Prolonged awkward postures during panel wiring or mounting may lead to musculoskeletal disorders.
- Environmental risks: Dust, moisture, and temperature extremes at the site can affect both operator health and equipment function.
- Fire hazards: Presence of flammable materials or faulty electrical components increases fire risk.
Safety Procedures for Operators
- Conduct thorough site risk assessments before work commences.
- Isolate electrical power sources prior to hardware installation or maintenance.
- Follow lockout/tagout (LOTO) procedures strictly to prevent accidental energizing.
- Maintain clean and organized workspaces to reduce trip and fall hazards.
- Report any unsafe conditions or incidents immediately to supervisors.
Training and Competency Requirements
- Operators must undergo training on SCADA system components and associated risks.
- Certification in electrical safety and first aid is crucial.
- Regular refresher courses to update on new safety protocols or technology.
- Practical drills on emergency response, including fire evacuation and electrical accidents.
- Documentation of training and competency must be maintained for audits.
Emergency Response Preparedness
- Clear access routes to emergency exits and firefighting equipment.
- Availability of first aid kits and trained personnel onsite.
- Communication plans for rapid reporting of incidents.
- Procedures for safe shutdown of SCADA systems during emergencies.
- Coordination with local emergency services for timely intervention.
1.1.2 Personal Protective Equipment (PPE)
Proper PPE protects SCADA installation personnel from hazards and ensures compliance with occupational safety regulations in Kenya.
Types of PPE Required for SCADA Installation
- Insulated gloves: Protect against electrical shocks during wiring and testing.
- Safety helmets: Shield the head from falling objects or accidental bumps.
- Safety goggles: Prevent eye injuries from sparks, dust, or chemical splashes.
- Protective footwear: Insulated and slip-resistant shoes guard against electrical hazards and physical injuries.
- High-visibility clothing: Enhances operator visibility in busy industrial environments.
Correct Use and Maintenance of PPE
- Inspect PPE before use for damage or wear and replace if necessary.
- Ensure PPE fits correctly to provide optimal protection without hindering mobility.
- Clean PPE regularly according to manufacturer instructions to maintain hygiene.
- Store PPE in designated clean, dry areas away from contaminants.
- Train personnel on proper donning, doffing, and disposal of PPE.
PPE Compliance Standards
- PPE must meet Kenya Bureau of Standards (KEBS) or equivalent international standards such as ISO 20345 for safety footwear or IEC 60903 for electrical gloves.
- Procurement should prioritize certified suppliers to guarantee quality.
- Regular audits to verify PPE usage and condition onsite.
- Enforcement of PPE use through supervisory checks.
- Documentation of PPE issue and maintenance records.
Limitations of PPE
- PPE is the last line of defense and should not replace safe work practices.
- Over-reliance on PPE may lead to complacency in hazard recognition.
- Some PPE can reduce dexterity or communication, requiring work adjustments.
- Incorrect PPE selection can increase risk instead of reducing it.
- PPE does not eliminate hazards but mitigates their impact.
1.1.3 Work Permits Assessment Methods
Work permits are formal authorizations to perform potentially hazardous activities during SCADA system installation. They ensure risks are assessed and controlled before work begins.
Types of Work Permits Relevant to SCADA Installation
- Electrical work permits: Authorize work on or near energized electrical equipment.
- Hot work permits: Required for welding, soldering, or cutting near flammable materials.
- Confined space entry permits: Needed when accessing restricted enclosures such as control room cabinets.
- Excavation permits: For trenching or groundwork involving underground cables.
- General work permits: Cover routine installation activities with identified hazards.
Assessment Process for Issuing Work Permits
- Conduct a detailed hazard identification and risk assessment for the task.
- Specify control measures and safety precautions to be implemented.
- Verify the competence and authorization of personnel involved.
- Define the permit validity period and renewal conditions.
- Require sign-off by safety officer or supervisor before work starts.
Monitoring and Compliance During Work
- Permit holders must display the permit visibly at the worksite.
- Supervisors conduct periodic inspections to ensure adherence to permit conditions.
- Any deviation or incident must be reported and permit reviewed.
- Permit closure involves confirming that the work area is safe and equipment is restored.
- Permits are archived for future audits and continuous improvement.
Challenges in Work Permit Management and Solutions
Challenges
- Delays in permit issuance causing project slowdowns.
- Poor communication leading to unauthorized work.
- Incomplete hazard assessments compromising safety.
- Loss or misplacement of physical permits.
- Resistance from workers viewing permits as bureaucratic.
Solutions
- Implement digital permit management systems for efficiency.
- Train all stakeholders on permit importance and procedures.
- Standardize hazard assessment checklists.
- Maintain secure storage and record-keeping of permits.
- Promote a safety culture emphasizing permit compliance.
1.1.4 Waste Management
Proper waste management at SCADA installation sites protects the environment and ensures compliance with Kenyan environmental regulations such as the Environmental Management and Coordination Act (EMCA).
Types of Waste Generated During Installation
- Electrical waste: Cut cables, connectors, and defective components.
- Packaging materials: Cardboard, plastics, and polystyrene from hardware.
- Hazardous waste: Oil-soaked rags, batteries, and chemicals.
- General waste: Food wrappers, paper, and disposable gloves.
- Metal scraps: Offcuts from mounting brackets or conduits.
Waste Segregation and Disposal Procedures
- Separate waste into hazardous and non-hazardous categories onsite.
- Use labelled containers for each waste type to prevent contamination.
- Recycle metals and plastics through authorized recycling firms.
- Dispose of hazardous waste at licensed hazardous waste facilities.
- Maintain waste disposal records as part of environmental compliance.
Environmental and Health Benefits of Proper Waste Management
- Reduces pollution risks to soil, water, and air.
- Minimizes fire hazards from flammable waste accumulations.
- Protects workers and the public from exposure to toxic substances.
- Enhances corporate social responsibility and community relations.
- Avoids penalties and fines from regulatory authorities.
Challenges and Best Practices in Waste Management
Challenges
- Lack of awareness on proper waste segregation.
- Limited access to specialized hazardous waste disposal services.
- Insufficient onsite waste storage facilities.
- Improper disposal leading to environmental contamination.
- Cost implications of waste management programs.
Best Practices
- Conduct regular training on waste segregation and handling.
- Engage certified waste disposal contractors.
- Designate specific waste collection points onsite.
- Implement waste reduction strategies such as reuse and recycling.
- Allocate budget specifically for environmental management.
1.1.5 Electrical Wiring Colour Coding
Adhering to correct electrical wiring colour codes is critical for safety, maintenance, and troubleshooting in SCADA installations.
Overview of Wiring Colour Codes in Kenya
- Live (Phase) wires: Red or brown insulation indicates live conductors carrying current.
- Neutral wires: Black or blue insulation denotes neutral conductors returning current.
- Earth (Ground) wires: Green or green-yellow striped insulation for grounding.
- Control wires: May use different colours like white or grey for signal or control circuits.
- Multi-core cables: Each core is colour-coded following standard conventions for identification.
Importance of Consistent Colour Coding
- Prevents accidental contact with live conductors during maintenance.
- Simplifies fault diagnosis and repair activities.
- Ensures compliance with Kenya Electricity Generating Board (KenGen) and IEC standards.
- Facilitates training and communication among technicians.
- Enhances system reliability by reducing wiring errors.
Common Violations and Their Risks
- Using non-standard colours leading to misidentification.
- Mixing colour codes within the same circuit causing confusion.
- Failure to label wires when colours deviate due to cable availability.
- Improper insulation stripping exposing conductors.
- Overloading cables not rated for their intended use.
Procedures for Verifying and Correcting Wiring Colours
- Inspect existing wiring against approved colour codes before installation.
- Use standard colour-coded cables specified in project documentation.
- Label wires clearly when deviations are unavoidable.
- Replace or re-insulate non-compliant wiring sections.
- Document wiring colours and changes in installation records.
1.1.6 Danger Warning Signage Assignments
Danger warning signs are essential safety tools that communicate hazards to personnel in SCADA installation areas.
Types of Danger Warning Signs Used
- High voltage signs: Indicate presence of lethal electrical energy.
- No unauthorized access: Restrict entry to qualified personnel only.
- Personal protective equipment required: Remind workers to wear PPE.
- Fire hazard signs: Warn about flammable substances or equipment.
- Emergency exit signs: Mark safe evacuation routes.
Placement Criteria for Warning Signs
- Signs must be clearly visible at entry points and hazardous zones.
- Height and angle of placement should ensure readability at eye level.
- Use reflective materials for visibility in low light conditions.
- Position signs near electrical panels, cable trays, and switchgear.
- Avoid overcrowding signs to prevent confusion.
Compliance with Standards
- Follow Kenya Occupational Safety and Health Act (OSHA) guidelines.
- Use symbols and colours standardized by ISO 7010.
- Signs must be durable, weather-resistant, and maintained regularly.
- Language used should be clear and where necessary bilingual.
- Conduct periodic audits to ensure signage integrity.
Challenges in Managing Warning Signage
- Signs becoming obscured by equipment or dust.
- Vandalism or removal of signs by unauthorized persons.
- Inadequate number of signs leading to missed hazard communication.
- Outdated signs after layout changes.
- Budget constraints limiting sign replacement.
1.1.7 Barricades
Barricades are physical barriers used to protect workers and restrict access to hazardous areas during SCADA installation.
Purpose and Types of Barricades
- Purpose: Prevent accidental entry into dangerous zones and delineate work areas.
- Types: Fixed barricades, portable barriers, tape barricades, and warning cones.
- Material: Metal, plastic, or wood depending on site requirements.
- Visibility: Often brightly coloured with reflective strips.
- Access control: Barricades may include lockable gates or chains.
Installation Procedures for Barricades
- Assess the hazardous area and determine barricade boundaries.
- Select suitable barricade materials based on site conditions.
- Erect barricades securely to prevent displacement.
- Attach clear warning signs to barricades.
- Ensure access points are controlled and monitored.
- Inspect barricades daily for damage or displacement.
Safety Benefits of Barricades
- Reduce risk of unauthorized access and potential accidents.
- Provide visual cues that alert workers to hazards.
- Facilitate orderly workflow by separating work zones.
- Assist emergency responders in identifying hazardous areas.
- Enhance compliance with safety regulations.
Maintenance and Monitoring
- Regularly inspect barricades for wear, damage, or obstruction.
- Replace or repair damaged components immediately.
- Update barricade layout as work progresses or hazards change.
- Train personnel on the importance of respecting barricades.
- Document barricade status and incidents related to access control.
1.1.8 High Voltage Signage
High voltage signage is critical in areas where SCADA systems interface with medium to high voltage electrical equipment.
Identification of High Voltage Areas
- Electrical switchgear rooms.
- Transformer enclosures.
- Medium voltage cable trenches.
- Control panels connected to high voltage circuits.
- Outdoor substations linked to SCADA monitoring.
Design and Specifications of High Voltage Signs
| Name |
Specification |
Use |
| High Voltage Sign |
Yellow triangle with black lightning bolt |
Warns of electrical shock risk |
| Danger Sign |
Red rectangular sign with white lettering |
Indicates immediate hazard presence |
| Warning Tape |
Yellow and black striped tape, 5cm width |
Marks boundaries of high voltage zones |
- Signs must be weather-resistant and UV stable.
- Use symbols complying with IEC 60417.
- Text size must be legible from at least 5 meters.
- Reflective coatings enhance visibility at night.
Placement Guidelines
- Position at all entrances to high voltage areas.
- Install on electrical panels and switchgear doors.
- Place along cable trenches and overhead lines.
- Maintain clear space around signs for visibility.
- Update signage after layout or equipment changes.
Legal and Safety Requirements
- Comply with Kenya Power and Lighting Company (KPLC) and OSHA regulations.
- Regularly inspect signs for damage or fading.
- Train staff to recognize and respect high voltage warnings.
- Integrate signage with overall site safety management systems.
- Maintain records of sign inspections and replacements.
1.1.9 Health Policy Assessments for Hardware Mounting
Assessing health policies related to hardware mounting ensures installations do not compromise operator health or violate occupational safety standards.
Ergonomic Considerations
- Mount hardware at heights that minimize bending or stretching.
- Provide adequate clearance for operator access and maintenance.
- Use vibration-dampening mounts to reduce exposure.
- Ensure stable and secure mounting to prevent equipment falls.
- Consider lighting levels to reduce eye strain during interaction.
Environmental Controls
- Assess ambient temperature and humidity to select appropriate enclosures.
- Protect hardware from dust and moisture ingress (IP-rated enclosures).
- Locate equipment away from sources of chemical exposure.
- Ensure ventilation to prevent overheating.
- Plan cable routing to avoid trip hazards or interference.
Compliance with Occupational Health Policies
- Follow Kenya OSHA guidelines on workplace safety.
- Implement policies for manual handling of heavy components.
- Provide training on safe mounting procedures.
- Conduct risk assessments before hardware installation.
- Document health policy adherence in project records.
Monitoring and Continuous Improvement
- Schedule periodic inspections of mounted hardware for stability and safety.
- Solicit operator feedback on usability and comfort.
- Update mounting practices based on new health research or incidents.
- Integrate health policy audits into routine safety checks.
- Maintain records for regulatory compliance and quality assurance.
Practice Questions
- Explain five key risks to operator safety during SCADA system installation and how to mitigate each. (10 marks)
- List and describe the types of PPE necessary for SCADA installation work, including their maintenance requirements. (10 marks)
- Describe the steps involved in obtaining and managing work permits for electrical work in a SCADA installation project. (10 marks)
- Discuss the importance of waste management on SCADA installation sites and outline procedures for hazardous waste disposal. (10 marks)
- Identify the standard electrical wiring colour codes used in Kenya and explain why adherence to these codes is critical. (10 marks)
- Outline the types of danger warning signs used in SCADA installation sites and their correct placement. (10 marks)
- Describe the process of erecting barricades around hazardous areas during SCADA installation and their safety benefits. (10 marks)
- Specify the design requirements and placement guidelines for high voltage signage in SCADA system installations. (10 marks)
- Explain how health policy assessments influence hardware mounting decisions in SCADA installations. (10 marks)
The rest of this chapter
🔒Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free account 🔒1.3 Preparation of PLC Installation Cabinet
In industrial control and installation settings across Kenya, the preparation of the Programmable Logic Controller (PLC) installation cabinet is a critical task that ensures the reliability, safety, and maintainability of automation systems. Proper cabinet pre…
🔒1.4 Installation of PLC hardware in the cabinet
Installing Programmable Logic Controller (PLC) hardware correctly is critical for reliable industrial control systems in Kenya’s dynamic industries like manufacturing plants, agro-processing, and water treatment facilities. Proper mounting and wiring ensure mi…
🔒1.5 PLC Wiring
In industrial control and installation within Kenya, Programmable Logic Controllers (PLCs) form the backbone of automation systems including SCADA. Proper wiring of PLCs ensures reliable communication between input/output devices and the processor, critical fo…
🔒1.6 Practice: Cabinet preparation and hardware installation Interface PLC
In the Kenyan industrial control sector, preparing the SCADA system installation site requires meticulous cabinet preparation and precise installation of hardware interface components such as Programmable Logic Controllers (PLCs). Proper cabinet setup ensures…
Chapter Summary
This chapter covers the essential steps for preparing a SCADA system installation site with a strong focus on health and safety, including operator safety, use of personal protective equipment, work permits, waste management, and correct application of electrical wiring colour codes and danger signage. It emphasizes the importance of safety measures such as barricades and high voltage signs, alongside health policy assessments related to hardware mounting. The chapter then highlights the necessary tools required for installation, such as clamp-meters, multi-meters, Ethernet crimping tools, and various hand tools like screwdrivers, wrenches, and pliers. Preparation of the PLC installation cabinet is explained with attention to proper layout and readiness for hardware installation. Detailed procedures for installing PLC hardware components including power supplies, input and output modules, processors, racks, and indicator lights are presented. The wiring section focuses on interpreting hardware and software manuals, installation and electrical wiring drawings, and adherence to wiring standards, codes, and procedures. Finally, practical exercises reinforce cabinet preparation and hardware installation, ensuring learners can apply theoretical knowledge in real-world SCADA system setups.
Self-Assessment
🔒 PDFDownload this self-assessment, with answers
A. Written Assessment
- What is the primary purpose of wearing PPE during SCADA system installation? (2 marks)
- Identify the correct electrical wiring colour coding for a three-phase system in Kenya. (3 marks)
🔒20 more in this section.
Chapter Examination Questions
🔒 PDFDownload these examination questions, with worked answers
SECTION A (40 Marks) - Answer ALL Questions
- Explain the importance of wearing Personal Protective Equipment (PPE) when preparing a SCADA system installation site in an industrial plant. (4 marks)
- Identify the standard electrical wiring colour codes used in Kenya for three-phase SCADA control wiring. (4 marks)
🔒18 more in this section.
Chapter Practical Activities
Practical 1: Assessment and Implementation of Health and Safety Measures for SCADA System Installation Site
Industrial Control and Installation · Level 6
Installation And Maintanance
PRACTICAL ASSESSMENT
TIME: 3 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Prepare a SCADA system installation site with proper health and safety controls and mount a 900mm x 600mm SCADA control panel board as per provided safety policies.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Spirit level | SCADA control panel mounting board (900mm x 600mm) |
| Tape measure (5m) | SCADA hardware dummy unit |
| Screwdriver set | Warning signage set (Danger, PPE Required, No Entry) |
| Side cutter | |
| Multimeter | |
| Cleaning broom | |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Safety boots | 1 Pair per Candidate |
| 2 | Overall | 1 Pc per Candidate |
| 3 | Safety helmet | 1 Pc per Candidate |
| 4 | Safety gloves | 1 Pair per Candidate |
| 5 | First aid kit | 1 Pc per 5 Candidates |
| 6 | Fire extinguisher (CO2, 5kg) | 1 Pc per 5 Candidates |
| 7 | Warning signage set (Danger, PPE Required, No Entry) | 1 Set per Candidate |
| 8 | Spirit level | 1 Pc per Candidate |
| 9 | Tape measure (5m) | 1 Pc per Candidate |
| 10 | Screwdriver set | 1 Set per Candidate |
| 11 | Side cutter | 1 Pc per Candidate |
| 12 | Multimeter | 1 Pc per Candidate |
| 13 | Cleaning broom | 1 Pc per Candidate |
| 14 | Industrial waste bin | 1 Pc per 3 Candidates |
| 15 | SCADA control panel mounting board (900mm x 600mm) | 1 Pc per Candidate |
| 16 | SCADA hardware dummy unit | 1 Pc per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Health and Safety Preparation |
Wore all required personal protective equipment (safety boots, overall, helmet, gloves) (Award 2 marks for correct and complete PPE, 0 for incomplete) | 2 | | |
Inspected installation site for hazards and documented findings (Award 3 marks for thorough inspection and clear documentation, 1 for partial, 0 for none) | 3 | | |
Placed warning and safety signage at appropriate locations (Award 2 marks for correct placement, 1 for partial, 0 for incorrect) | 2 | | |
Ensured availability and accessibility of first aid kit and fire extinguisher (Award 2 marks for both items present and accessible, 1 for partial, 0 for none) | 2 | | |
Applied good housekeeping: cleared debris, arranged tools and materials safely (Award 2 marks for clean, safe workspace, 1 for partial, 0 for untidy) | 2 | | |
Checked all tools and equipment for electrical safety (visual and multimeter test) (Award 2 marks for full check, 1 for partial, 0 for none) | 2 | | |
| Sub-Total | 13 | | |
| TASK 2: Hardware Mounting Safety |
Measured and marked mounting points for SCADA control panel board (900mm x 600mm) (Award 2 marks for accurate measurement and marking, 1 for minor error, 0 for major error) | 2 | | |
Used spirit level to ensure board is horizontal before mounting (Award 2 marks for using spirit level correctly, 0 for not using or incorrect use) | 2 | | |
Mounted SCADA control panel board securely and safely (Award 3 marks for secure, level, and safe mounting, 1 for partial, 0 for unsafe) | 3 | | |
Followed health policy for safe manual handling and lifting (Award 2 marks for correct technique and compliance, 1 for partial, 0 for none) | 2 | | |
| Sub-Total | 9 | | |
| PRODUCT CHECKLIST |
SCADA control panel board is mounted at correct height and position (within ±5mm of specification) (Award 4 marks for ±5mm accuracy, 2 for ±10mm, 0 for more) | 4 | | |
Board is level (checked with spirit level, not exceeding 2mm deviation over 900mm) (Award 3 marks for ≤2mm deviation, 1 for ≤5mm, 0 for more) | 3 | | |
Warning signage is visible and correctly placed at access points (Award 2 marks for all signage correct, 1 for partial, 0 for none) | 2 | | |
Work area is left clean, safe, and compliant with health policy (Award 2 marks for fully clean and safe, 1 for partial, 0 for unsafe) | 2 | | |
| Sub-Total | 11 | | |
| GRAND TOTAL | 33 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
Practical 2: Evaluate Work Permit Requirements and Develop Waste Management Plan for SCADA System Installation Site
Industrial Control and Installation · Level 6
Installation And Maintanance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)
Type: Individual
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following task:
i. Compile a completed work permit application and a waste management plan for the SCADA installation site covering a 10m x 15m area as per the provided templates.
2. You have been provided with the following resources for the practical task:
| Tools & Equipment | Materials |
|---|
| Pen | Work permit application form |
| Notebook | Waste management plan template |
| Computer station | |
⬇ PDFResources Required (Cutting List)
| S/N | Item | Quantity |
|---|
| 1 | Work permit application form | 1 Pc per Candidate |
| 2 | Waste management plan template | 1 Pc per Candidate |
| 3 | Pen | 1 Pc per Candidate |
| 4 | Notebook | 1 Pc per Candidate |
| 5 | Computer station (with word processing software) | 1 Pc per Candidate |
| 6 | Safety boots | 1 Pair per Candidate |
| 7 | Overall | 1 Pc per Candidate |
⬇ PDFAssessor Guide
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|
| TASK 1: Work Permit Requirements Assessment |
Wore safety clothing (overall and safety boots) (Award 2 marks for correct PPE or zero) | 2 | | |
Reviewed relevant site documentation and identified permit requirements (Award 3 marks for full identification or zero) | 3 | | |
Filled out work permit application form accurately (Award 5 marks for fully completed form or zero) | 5 | | |
| Sub-Total | 10 | | |
| TASK 2: Waste Management Plan Development |
Identified types of waste expected from SCADA installation (Award 3 marks for all types or zero) | 3 | | |
Outlined procedures for waste segregation, collection, and disposal (Award 5 marks for comprehensive procedures or zero) | 5 | | |
Included environmental and safety considerations in the plan (Award 2 marks for accurate inclusion or zero) | 2 | | |
| Sub-Total | 10 | | |
| PRODUCT CHECKLIST |
Work permit application form is complete, accurate, signed, and references the 10m x 15m site (Award 8 marks for completeness and accuracy or zero) | 8 | | |
Waste management plan addresses all types of waste and procedures for the specified 10m x 15m installation area (Award 7 marks for full coverage or zero) | 7 | | |
Documents are professionally formatted and free of errors (Award 5 marks for professional presentation or zero) | 5 | | |
| Sub-Total | 20 | | |
| GRAND TOTAL | 40 | | |
ASSESSMENT OUTCOME: ☐ Competent ☐ Not Yet Competent (competent if at least 50%)
🔒Electrical Wiring Colour Coding and Standards ApplicationPractical 3
🔒Placement of Danger Signage and Barricades for SCADA System Installation SitePractical 4
🔒Selection and Demonstration of Essential Tools for SCADA System InstallationPractical 5
🔒Preparation of PLC Installation Cabinet (600mm x 800mm x 250mm)Practical 6
🔒Mounting PLC Hardware and Rack Assembly in Control CabinetPractical 7
🔒PLC Power Supply Installation in CabinetPractical 8
🔒Installation and Connection of PLC Input Module for SCADA SystemPractical 9
🔒Installation and Wiring of PLC Output Module for SCADA SystemPractical 10
🔒Installation of PLC Processor (CPU) and Verification of Secure Mounting and ConnectivityPractical 11
🔒Installation and Testing of Indicator Lights in PLC CabinetPractical 12
🔒PLC Wiring and Connections within Cabinet as per Electrical StandardsPractical 13
🔒Interpretation of PLC Manuals and Installation Drawings for SCADA System Site PreparationPractical 14
🔒Interface PLC Cabinet Preparation and Hardware InstallationPractical 15