Building Temporary Works

Building Technology · Level 5  ·  4 Chapters

Compiled by: Rose Apiyo

Can I download Building Temporary Works notes as a PDF?

Yes. The notes download as a PDF too: every chapter has a Download PDF button above its notes. Sign in and click it. Each download comes from your plan's monthly allowance or from credits. To read before you sign in, the first topic of every chapter opens to anyone, and a Profplanet plan opens the remaining topics.

▣

What Building Temporary Works covers

Building Temporary Works in Building Technology Level 5 covers the timbering, formwork, scaffolds and shores that support a job while it is being built. Trench timbering and formwork come first: tools and equipment are assembled, materials prepared and the work set up, then timbering is taken down and formwork struck off. Scaffolds and shores follow, with scaffold materials, shore sizes and the storage of all these materials. Every outcome begins with protective equipment.

■

Careers after Building Temporary Works

Working with temporary works is a daily reality on many Kenyan construction sites - from the bustling road-building projects along the Nairobi-Mombasa corridor to the concrete foundations of new schools in rural counties. Mastering the safety, assembly, set-out, and storage skills in this unit means you’ll be ready to step onto a wide variety of job sites, whether you join a contractor’s crew, start your own subcontracting business, or support community-driven building projects.

  • Road and bridge construction crews in counties such as Kiambu, Nakuru, and Turkana rely on trench timbering and formwork to hold back earth while foundations are poured; your ability to set out and dismantle these structures safely keeps the project on schedule and protects workers.
  • Water-resource and irrigation schemes in the Rift Valley and western Kenya use timber shoring and formwork to build canals, dams, and pump stations; accurate preparation and proper storage of timbering materials help prevent delays caused by weather-related damage.
  • Urban housing upgrades in informal settlements of Nairobi, Mombasa, and Kisumu often involve community-led construction of low-rise units; skilled formwork setters and shore installers are hired on a day-labour basis to create safe, quick-set foundations for block walls.
  • Mining and quarry operations in Kitui and Kakamega employ trench timbering to protect workers from rock falls and to channel runoff; knowing the National Building Code requirements ensures compliance and reduces the risk of costly site shutdowns.
  • Public-sector building projects such as county referral hospitals, schools, and market stalls require reliable temporary works teams; contractors look for workers who can consistently wear the right PPE, assemble tools correctly, and store materials to extend their life.
  • Self-employed subcontractors can market themselves to small-scale developers and NGOs that need temporary works for community centres, health posts, or agricultural storage facilities; offering a reputation for safe, code-compliant set-up and strike-off can command higher day rates.
  • Seasonal construction camps in the highlands or coastal tourism zones often need quick-erected formwork for guest-house extensions; the ability to pack, transport, and store formwork materials efficiently becomes a valuable niche service.

By mastering these skills you become the backbone of any construction effort - ensuring safety, quality, and efficiency - while opening doors to steady employment, higher wages, and the confidence to run your own temporary-works business. Keep building your expertise; the structures of Kenya’s future will need you.

Chapters

What Building Temporary Works covers: 25 main topics in 4 chapters

1. Perform timbering works

  1. 1.1 PPEs
  2. 1.2 Timbering tools and equipment
  3. 1.3 Trench timbering
  4. 1.4 Erection of timbering
  5. 1.5 Dismantling of timbering
  6. 1.6 Storage of timbering materials

2. Prepare building formwork

  1. 2.1 PPEs
  2. 2.2 Building formwork tools and equipment
  3. 2.3 Preparation of formwork
  4. 2.4 Erection of formwork
  5. 2.5 Striking of formwork
  6. 2.6 Storage of formwork materials

3. Prepare construction scaffolds

  1. 3.1 PPEs
  2. 3.2 Scaffold tools and equipment
  3. 3.3 Scaffold materials
  4. 3.4 Erection of scaffold
  5. 3.5 Dismantling of scaffold
  6. 3.6 Storage of scaffold materials

4. Prepare building shores

  1. 4.1 PPEs
  2. 4.2 Shoring tools and equipment
  3. 4.3 Shoring materials
  4. 4.4 Building shores size is prepared as per work requirement
  5. 4.5 Erection of shores
  6. 4.6 Dismantling of shores
  7. 4.7 Storage of shoring materials

Practise this unit

Revise this unit

3 more for this unit

Beyond the syllabus

Other units in Module II