By the end of this chapter, you will be able to:
These skills are essential because they help you create quality metal products safely and efficiently, preparing you for success in the fabrication trade.
Sheet metal work is a fundamental skill across many professional fields in Kenya, including manufacturing, construction, healthcare equipment maintenance, and agricultural tool fabrication. Mastery of pattern development and understanding various sheet metal products enables technicians and artisans to produce precise components and assemblies that meet specific functional and aesthetic requirements. This chapter explores the technical processes involved in pattern development and the diverse types of sheet metal products, emphasizing practical applications across sectors such as county hospitals, educational institutions, retail businesses, and cooperatives.
Pattern development is the process of creating templates or layouts that guide the cutting, shaping and assembling of sheet metal components. It is critical for ensuring that fabricated parts fit together accurately and perform their intended functions. Example: in a sheet metal workshop making ventilation ducts for a commercial kitchen, or storage bins for a grain store, precise pattern development reduces material waste and improves quality.
Pattern development methods vary depending on the shape of the component, the sheet metal thickness and the fabrication process. Three geometric methods form the foundation of sheet metal layout: the parallel line method, triangulation and the radial line method. Each one unfolds a three-dimensional surface into a flat shape, and the choice between them depends on how the surface of the object is formed. Other practical ways of producing and checking patterns are listed at the end of the procedure and applications section, under "Other ways of producing patterns".
The parallel line method is used for objects whose surfaces are made up of straight lines that run parallel to each other, such as prisms, cylinders, elbows, tees and rectangular or round ducts. The surface is divided into a series of parallel strips, and the true length of each strip is projected from the elevation onto a flat stretch-out line. Example: a workshop making a round extraction duct for a commercial kitchen needs a mitred elbow, and the parallel line method gives the exact curved cutting line for each piece.
Key features of the method:
Procedure for developing a mitred cylindrical elbow piece:
Worked example: a kitchen duct has a diameter of 200 mm and a 45° mitre cut.
Stretch-out length = π × D
Stretch-out length = 3.142 × 200
Stretch-out length = 628.3 mm
Width of each of the 12 divisions = 628.3 ÷ 12
Width of each division = 52.4 mm
Difference between the longest and shortest element = D × tan 45°
Difference = 200 × 1
Difference = 200 mm
The pattern is therefore a strip 628.3 mm long, with 52.4 mm divisions, and its mitred edge rises and falls by 200 mm across the width.
Triangulation is used to develop surfaces that have no parallel lines and cannot be unfolded by the radial line method. These are mainly transition pieces that join two different shapes, such as square to round, rectangular to round or offset connections. The surface is divided into a series of small triangles. The true length of each side is found, and the triangles are then built one after another on the flat sheet. Example: a workshop making a flour hopper fits a transition that changes from a 400 mm square inlet to a 250 mm round outlet. Triangulation gives the flat pattern for it.
Key features of the method:
Procedure for developing a square to round transition piece:
Worked example: a transition from a 400 mm square to a 250 mm diameter circle with a vertical height of 300 mm.
Take the circle point on the centreline of one side, and the square corner next to it. The corner is 200 mm from the centre in each direction, and the circle point is 125 mm from the centre.
Plan length = √(75² + 200²)
Plan length = √(5625 + 40000)
Plan length = √45625
Plan length = 213.6 mm
True length = √(plan length² + height²)
True length = √(45625 + 300²)
True length = √(45625 + 90000)
True length = √135625
True length = 368.3 mm
This line is drawn at 368.3 mm on the pattern, not at the 213.6 mm seen in the plan.
The radial line method is used for objects whose surfaces taper to a point, or would taper to a point if they were extended, such as cones, pyramids and their frustums. All the lines of the surface radiate from the apex, so the pattern is drawn as a sector of a circle for a cone, or as a set of triangles that share a common point for a pyramid. Example: a workshop making a conical cover for a grain hopper uses the radial line method to find the sector that rolls into the cone.
Key features of the method:
The sector angle of a cone pattern is found from the formula:
Sector angle = (D ÷ (2 × L)) × 360° = 180° × D ÷ L
where D is the base diameter and L is the slant height.
Procedure for developing a frustum of a cone:
Worked example: a frustum with a base diameter of 400 mm, a top diameter of 200 mm and a vertical height of 300 mm.
Difference in radii = (400 − 200) ÷ 2 = 100 mm
Slant length of the frustum = √(300² + 100²)
Slant length = √(90000 + 10000)
Slant length = √100000
Slant length = 316.23 mm
The base radius (200 mm) is twice the difference in radii (100 mm), so the full cone is twice as long along the slant as the frustum.
Slant length of the full cone = 316.23 × 2
Full cone slant length = 632.46 mm, taken as 632.5 mm
Slant length of the small cone = 632.46 − 316.23
Small cone slant length = 316.23 mm, taken as 316.2 mm
Sector angle = 180° × D ÷ L
Sector angle = 180 × 400 ÷ 632.46
Sector angle = 113.8°
The pattern is a sector of 113.8°, with a large radius of 632.5 mm and a small radius of 316.2 mm.
The procedure for pattern development follows a systematic sequence to ensure accuracy and functionality. This sequence applies whether the workshop is producing ducts, trays or hoppers. The same steps apply whichever of the three geometric methods is chosen, and only step 2 changes the way the drawing is carried out.
The method is chosen from the way the surface of the component is formed. The table compares the three methods.
| Feature | Parallel line | Triangulation | Radial line |
|---|---|---|---|
| Surface type | Straight parallel lines | No parallel lines and no apex | Lines meeting at an apex |
| Typical components | Cylinders, prisms, elbows, tees, ducts | Square to round and offset transition pieces | Cones, pyramids, frustums, funnels |
| Key construction | Stretch-out line and ordinates | True length diagram and triangles | Arcs swung from the apex |
| Accuracy | Exact for flat faces, good for curves | Approximate, depends on divisions | Exact for cones and pyramids |
| Name | Specification | Use |
|---|---|---|
| Steel rule | 300 mm and 1 m, graduated in mm | Measuring and drawing straight lines |
| Scriber | Hardened steel point | Marking lines permanently on metal |
| Dividers and trammel | Spring dividers and a beam trammel for large radii | Stepping off equal divisions and swinging arcs |
| Try square and set square | Steel try square, 45° and 60° set squares | Drawing perpendicular lines and checking angles |
| Protractor | 0° to 180°, graduated in degrees | Setting out sector angles |
| Flexible curve or lath | Thin strip that holds a bend | Joining points with a smooth curve |
| Tin snips | Straight and curved cut | Cutting the pattern from the sheet or from layout paper |
Pattern development is used wherever flat sheet is formed into a three-dimensional product. Accurate patterns reduce errors, save costs and enhance production efficiency.
Besides the three geometric methods, a workshop uses other practical ways of producing and checking patterns.
Pattern development is widely applied in various sectors in Kenya, enabling the fabrication of diverse sheet metal products that meet specific needs. Below are five key applications, each explained with real Kenyan context:
Fabrication of HVAC Ducts for Hospitals: In county referral hospitals such as Kenyatta National Hospital, pattern development is used to create precise ductwork for ventilation systems. Accurate patterns ensure that ducts fit within limited ceiling spaces and connect seamlessly to air handling units, maintaining sterile air quality in operating theatres.
Production of Metal Roofing Sheets for Schools: Schools like Moi Girls High School in Nairobi rely on pattern development to fabricate corrugated and flat roofing sheets. This process ensures that sheets are cut to the correct dimensions, minimizing overlaps and wastage during installation, and providing durable weather protection.
Manufacture of Agricultural Machinery Parts: Agricultural cooperatives in regions like Eldoret use pattern development to produce components for seeders, ploughs, and water tanks. Accurate patterns are essential for parts that must withstand heavy use and fit precisely with other machine elements, reducing downtime during planting seasons.
Custom Furniture Fabrication for Hotels: Hotels such as Sarova Stanley in Nairobi commission custom metal furniture, including tables and decorative panels. Pattern development enables artisans to replicate complex shapes and designs, ensuring consistency and high-quality finishes for guest areas.
Creation of Retail Display Units: Supermarkets like Naivas use sheet metal display racks and shelving units fabricated using developed patterns. This allows for efficient use of space, easy assembly, and the ability to customize units for different product types, enhancing the shopping experience.
Explain the significance of pattern development in sheet metal fabrication and describe two methods commonly used in Kenyan industries. (10 marks)
Outline the step-by-step procedure for developing a sheet metal pattern for a rectangular duct used in a hospital ventilation system. (12 marks)
Discuss how the use of CAD in pattern development can improve fabrication outcomes in a TVET college workshop. (8 marks)
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the essential techniques and processes involved in carrying out sheet metal work, beginning with pattern development. It detailed three primary methods for creating accurate patterns: the parallel line method, triangulation, and the radial line method, each with distinct procedures and specific applications in fabricating sheet metal components. The chapter then examined various types of sheet metal products commonly manufactured, including tanks, gutters, cabinets and boxes, drums, tables and desks, guardings or enclosures, and troughs. It highlighted how these products are developed using the discussed pattern methods and explained their practical applications across different industries. Emphasis was placed on understanding the relationship between pattern development and the final product, ensuring precision and functionality in fabrication. The integration of these concepts equips learners with the skills to produce high-quality sheet metal items suited for diverse uses. Overall, the chapter provided a comprehensive overview of both theoretical and practical aspects of sheet metal work.
Which of the following is NOT a method used in pattern development for sheet metal work? (2 marks)
a) Parallel line method
b) Triangulation
c) Radial line
d) Welding line method
Describe the principle behind the parallel line method in pattern development. (3 marks)
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Steel rule | Gauge 20 Mild Steel sheet |
| Try square | A4 plain paper |
| Divider | |
| Scriber | |
| Pencil | |
| Scissors or hand shears | |
| Bench with vice | |
| Leather gloves | |
| Plastic hammer | |
| Mallet | |
| Files assorted |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Gauge 20 Mild Steel sheet | 1 sheet per Candidate (500 mm x 400 mm) |
| 2 | A4 plain paper | Enough per Candidate |
| 3 | Steel rule | 1 per Candidate |
| 4 | Try square | 1 per Candidate |
| 5 | Divider | 1 per Candidate |
| 6 | Scriber | 1 per Candidate |
| 7 | Pencil | 1 per Candidate |
| 8 | Scissors or hand shears | 1 per Candidate |
| 9 | Bench with vice | 1 per 4 Candidates |
| 10 | Leather gloves | 1 pair per Candidate |
| 11 | Plastic hammer | 1 per Candidate |
| 12 | Mallet | 1 per Candidate |
| 13 | Files assorted | 1 set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Safety and Preparation | |||
| Wore leather gloves (Award 1 or 0 mark) | 1 | ||
| Wore overall or dust coat (Award 1 or 0 mark) | 1 | ||
| Wore safety boots (Award 1 or 0 mark) | 1 | ||
| Prepared work area and tools before starting (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 4 | ||
| TASK 2: Pattern Development Using Parallel Line Method | |||
| Accurately laid out base rectangle of 300mm x 500mm on paper (Award 2 or 0 marks) | 2 | ||
| Marked height lines of 200mm at correct positions using parallel line method (Award 3 or 0 marks) | 3 | ||
| Transferred layout accurately to metal sheet (Award 2 or 0 marks) | 2 | ||
| Used scriber and try square correctly for marking (Award 1 or 0 mark) | 1 | ||
| Marked allowances for joints and seams as per drawing (Award 2 or 0 marks) | 2 | ||
| Sub-Total | 10 | ||
| TASK 3: Cutting and Finishing | |||
| Cut out pattern accurately following marked lines (Award 3 or 0 marks) | 3 | ||
| Used hand shears or scissors safely and correctly (Award 1 or 0 mark) | 1 | ||
| Removed sharp edges and burrs using files (Award 2 or 0 marks) | 2 | ||
| Sub-Total | 6 | ||
| TASK 4: Housekeeping | |||
| Cleaned work station after completion (Award 1 or 0 mark) | 1 | ||
| Returned tools and unused materials to proper place (Award 1 or 0 mark) | 1 | ||
| Disposed waste materials correctly (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 3 | ||
| PRODUCT CHECKLIST | |||
| Pattern dimensions conform to 300mm width ±1mm (Award 2 or 0 marks) | 2 | ||
| Pattern dimensions conform to 200mm height ±1mm (Award 2 or 0 marks) | 2 | ||
| Pattern dimensions conform to 500mm length ±1mm (Award 2 or 0 marks) | 2 | ||
| Pattern lines are straight and parallel as per parallel line method (Award 2 or 0 marks) | 2 | ||
| Allowance for joints and seams correctly marked (Award 1 or 0 mark) | 1 | ||
| Edges are smooth and free from burrs (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 33 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Steel rule | Gauge 20 Mild Steel sheet 600 mm x 300 mm |
| Divider | A4 plain paper |
| Scriber | |
| Try square | |
| Protractor | |
| Pencil | |
| Eraser |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Gauge 20 Mild Steel sheet 600 mm x 300 mm | 1 Pc per Candidate |
| 2 | A4 plain paper | Enough per Candidate |
| 3 | Steel rule | 1 Pc per Candidate |
| 4 | Divider | 1 Pc per Candidate |
| 5 | Scriber | 1 Pc per Candidate |
| 6 | Try square | 1 Pc per Candidate |
| 7 | Protractor | 1 Pc per Candidate |
| 8 | Pencil | 1 Pc per Candidate |
| 9 | Eraser | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Safety and PPE | |||
| Wore safety boots (Award 1 or 0 mark) | 1 | ||
| Wore overall or dust coat (Award 1 or 0 mark) | 1 | ||
| Used leather gloves during marking (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 3 | ||
| TASK 2: Setting Out and Marking | |||
| Set out base lines accurately using try square and steel rule (Award 2 or 0 marks) | 2 | ||
| Measured and marked all linear dimensions on paper and steel sheet correctly (Award 1 mark each for length, width and height markings) | 3 | ||
| Applied triangulation method correctly using divider and protractor (Award 1 mark for each correct triangulation step) | 3 | ||
| Marked pattern edges clearly with scriber (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 9 | ||
| TASK 3: Verification and Final Checks | |||
| Checked all dimensions against working drawing with tolerance ±1 mm (Award 2 or 0 marks) | 2 | ||
| Ensured pattern lines are neat and continuous (Award 1 or 0 mark) | 1 | ||
| Confirmed pattern completeness for duct elbow shape (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 4 | ||
| TASK 4: Housekeeping | |||
| Cleaned work area after completing pattern development (Award 1 or 0 mark) | 1 | ||
| Returned tools and materials to designated places (Award 1 or 0 mark) | 1 | ||
| Disposed of waste paper and offcuts correctly (Award 1 or 0 mark) | 1 | ||
| Sub-Total | 3 | ||
| PRODUCT CHECKLIST | |||
| Pattern length dimension of 150 mm ±1 mm (Award 2 or 0 marks) | 2 | ||
| Pattern width dimension of 150 mm ±1 mm (Award 2 or 0 marks) | 2 | ||
| Pattern angle 90° ±1° as per drawing (Award 3 or 0 marks) | 3 | ||
| Accuracy of triangulation lines and points (Award 3 or 0 marks) | 3 | ||
| Neatness and clarity of the developed pattern (Award 2 or 0 marks) | 2 | ||
| Sub-Total | 12 | ||
| GRAND TOTAL | 31 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.