Telecommunication Engineering  ·  Level 6
Broadcasting Communication Systems Installation
Chapter 4: Set up Broadcasting Communication Systems
📚 0 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • safely and correctly erect broadcasting communication system support structures following design specifications
  • properly mount broadcasting communication equipment in compliance with Communication Authority license requirements
  • accurately connect broadcasting communication equipment according to design specifications
  • correctly configure the broadcasting communication system following Communication Authority license requirements
  • accurately align the broadcasting communication system according to design specifications
  • carry out broadcasting communication system tests correctly following International Telecommunication Union (ITU) standards

Mastering these skills ensures your work meets professional standards and keeps communication systems running smoothly and reliably.

Chapter Practical Activities

Practical 1: Configure Transmission Cables and Connectors for Broadcasting System

Telecommunication Engineering · Level 6
Broadcasting Communication Systems Installation
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Configure and terminate 10 meters of RG-6 coaxial cable with BNC and F-Type connectors ensuring proper shielding, secure connections, and minimal signal interference.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Compression Tool for ConnectorsRG-6 Coaxial Cable
Coaxial Cable StripperBNC Connectors
Screwdriver SetF-Type Connectors
MultimeterInsulation Tape
Heat Shrink Tubing 3mm diameter
Cable Ties
Personal Protective Equipment (Dustcoat/Overall, Safety Gloves)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1RG-6 Coaxial Cable10 meters per Candidate
2BNC Connectors4 pcs per Candidate
3F-Type Connectors4 pcs per Candidate
4Compression Tool for Connectors1 pc per 2 Candidates
5Coaxial Cable Stripper1 pc per Candidate
6Screwdriver Set1 set per Candidate
7Insulation Tape1 roll per Candidate
8Heat Shrink Tubing 3mm diameter5 pcs per Candidate
9Cable Ties10 pcs per Candidate
10Multimeter1 pc per 2 Candidates
11Personal Protective Equipment (Dustcoat/Overall, Safety Gloves)1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Wore Personal Protective Equipment (Dustcoat/Overall, Safety Gloves)
(Award 1 mark if PPE worn correctly, else 0)
1
Applied good housekeeping practice by arranging a tidy working area
(Award 1 mark for tidy and hazard-free workspace)
1
Selected and handled tools and equipment properly
(Award 2 marks for correct selection and safe handling of tools)
2
Sub-Total4
TASK 2: Cable Preparation and Connector Termination
Measured and cut 10 meters of RG-6 coaxial cable accurately
(Award 2 marks for exact 10m length cut)
2
Stripped cable ends correctly using coaxial cable stripper without damaging braid or dielectric
(Award 3 marks for proper stripping technique)
3
Installed BNC and F-Type connectors securely with compression tool
(Award 4 marks for proper compression and secure fitting of connectors)
4
Applied heat shrink tubing and insulation tape neatly to ensure no exposure of conductive parts
(Award 2 marks for neat insulation and protection)
2
Bundled cables using cable ties maintaining neatness and avoiding strain
(Award 2 marks for neat cable management and securing)
2
Tested cable continuity and signal integrity using multimeter
(Award 3 marks for successful continuity and no short circuit)
3
Ensured no visible damage or loose connections on cables and connectors
(Award 2 marks for no physical defects or loose fittings)
2
Sub-Total18
PRODUCT CHECKLIST
Finished cable assembly is exactly 10 meters long with properly terminated BNC and F-Type connectors; connectors are firmly attached with no loose ends or exposed shielding; cable insulation and protective coverings are neat and secure; cable bundles are neatly tied without strain.
(Award up to 10 marks based on adherence to length, connector termination quality, insulation neatness, and cable management)
10
Sub-Total10
GRAND TOTAL32
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Set up a broadcasting transmitter unit 1200mm x 800mm x 400mm

Telecommunication Engineering · Level 6
Broadcasting Communication Systems Installation
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Position and install the broadcasting transmitter unit measuring 1200mm x 800mm x 400mm, connect it to the power supply and antenna system.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Screwdriver setBroadcasting transmitter unit
Wire stripperAntenna (isolated 1.5 m copper wire)
PliersCoaxial cable RG-58
MultimeterPower supply 240V AC with 12V DC adapter
Mounting bracket and screws
Insulation tape
Cable ties
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Broadcasting transmitter unit1 Pc per Candidate
2Antenna (isolated 1.5 m copper wire)1.5 meters per Candidate
3Coaxial cable RG-583 meters per Candidate
4Power supply 240V AC with 12V DC adapter1 Pc per Candidate
5Mounting bracket and screws1 set per Candidate
6Insulation tape1 roll per 5 Candidates
7Cable ties5 Pcs per Candidate
8Dustcoat/Overall1 set per Candidate
9Safety boots1 pair per Candidate
10Screwdriver set1 set per Candidate
11Wire stripper1 Pc per Candidate
12Pliers1 Pc per Candidate
13Multimeter1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and safety
Wore Personal Protective Equipment (Dustcoat/Overall and Safety boots)
(Award 1 mark for wearing complete PPE, 0 if not)
1
Applied good housekeeping practice by ensuring a tidy working area before starting
(Award 1 mark for tidy and safe working environment, 0 if not)
1
Selected and used appropriate tools correctly (Screwdriver, Wire stripper, Pliers, Multimeter)
(Award 1 mark for correct tool selection, 1 mark for correct usage)
2
Sub-Total4
TASK 2: Installation of transmitter unit
Positioned the transmitter unit securely on the mounting bracket at the specified location
(Award 3 marks for correct and stable positioning, 0 if unstable or incorrect)
3
Connected the transmitter unit to the power supply with correct polarity and secure connections
(Award 3 marks for correct wiring and connection, 0 if incorrect)
3
Connected the antenna to the transmitter using coaxial cable with proper stripping and termination
(Award 3 marks for proper cable preparation and connection, 0 if poor or loose)
3
Secured all cables neatly using cable ties and insulation tape to avoid hazards
(Award 2 marks for neat cable management, 0 if messy or unsafe)
2
Sub-Total11
TASK 3: Testing and commissioning
Used multimeter to verify power supply voltage and continuity of antenna connection
(Award 2 marks for correct measurement and interpretation, 0 if incorrect)
2
Powered on the transmitter unit and observed normal operation without faults
(Award 3 marks for successful power-up and stable operation, 0 if failure)
3
Demonstrated the ability to tune or adjust transmitter settings as per instructions
(Award 3 marks for correct tuning or adjustment, 0 if none or incorrect)
3
Followed RF safety precautions during testing
(Award 2 marks for observing safety rules, 0 if ignored)
2
Sub-Total10
PRODUCT CHECKLIST
Transmitter unit installed firmly and aligned correctly (1200mm x 800mm x 400mm)
(Award 4 marks for correct dimensions and firm fixing, 0 if incorrect)
4
Power and antenna connections secure with no loose wires or exposed conductors
(Award 3 marks for secure, insulated connections, 0 if loose or exposed)
3
Cables routed neatly and safely with no tripping hazards
(Award 3 marks for neat and safe cable layout, 0 if messy or unsafe)
3
Transmitter operates correctly with confirmed output signal
(Award 5 marks for confirmed good signal and operation, 0 if failure)
5
Sub-Total15
GRAND TOTAL40
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Install grounding rods and lightning arrestors for broadcasting system protectionPractical 3
🔒Configure Audio Input Devices and Mixer for Broadcast Signal ProcessingPractical 4
🔒Set up and configure broadcast monitoring and control equipmentPractical 5
🔒Test and align broadcasting signal parameters for optimal transmissionPractical 6
🔒Install transmission line supports and cable trays 3000mm x 500mmPractical 7
🔒Troubleshoot and rectify faults in a broadcasting communication systemPractical 8
Am I competent?

At the start of this chapter we promised you would be able to:

  • safely and correctly erect broadcasting communication system support structures following design specifications
  • properly mount broadcasting communication equipment in compliance with Communication Authority license requirements
  • accurately connect broadcasting communication equipment according to design specifications
  • correctly configure the broadcasting communication system following Communication Authority license requirements
  • accurately align the broadcasting communication system according to design specifications
  • carry out broadcasting communication system tests correctly following International Telecommunication Union (ITU) standards

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.