Land Survey  ·  Level 6
Hydrographic Survey
Chapter 2: Conduct shore control survey
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Choose the right shore control survey methods that fit the specific needs of your job.
  • Select the correct tools, equipment, and materials needed for shore control surveys accurately.
  • Perform shore control surveys safely and correctly, following all work requirements.
  • Prepare detailed and clear shore control survey reports that meet job standards.

These skills will help you deliver precise and reliable survey results, which are essential for successful projects in the hydrographic surveying trade.

Conducting a shore control survey is a fundamental phase in hydrographic surveying that establishes accurate reference points on land to support marine and coastal mapping activities. This chapter focuses on the methodologies used in shore control surveys, which are critical for ensuring the precision and reliability of hydrographic data. For land survey professionals in Kenya, especially those working along the Indian Ocean coastline or the shores of large lakes such as Victoria and Turkana, understanding shore control methods is essential to support projects ranging from port development to environmental monitoring. Accurate shore control facilitates the integration of terrestrial and hydrographic data, enabling effective planning and management of Kenya’s water-based resources.

2.1 Shore Control Survey Methods

The choice of shore control survey methods depends on the terrain, accuracy requirements, available equipment, and project scope. In Kenya, where coastal environments vary from sandy beaches to rocky cliffs and mangrove swamps, surveyors must adapt their methods to suit these conditions while maintaining data integrity. Shore control surveys provide the framework of fixed points that hydrographic surveys reference to ensure spatial consistency between land and water data sets. The following subtopics delve into the primary shore control survey methods, highlighting their principles, practical application, and challenges faced in Kenyan contexts.

2.1.1 Geodetic Control Surveys for Shore Control

Geodetic control surveys provide the highest level of positional accuracy by establishing a network of control points with known coordinates tied to national geodetic datums. These surveys use precise instruments such as total stations and GNSS (Global Navigation Satellite Systems) receivers to determine exact positions on the shore, which are essential for referencing hydrographic surveys.

Principles of Geodetic Control Surveys

  • Coordinate Reference Systems: Geodetic surveys use coordinate systems like the Kenya Geodetic Datum 2010 (KGD2010), ensuring that shore control points align with national mapping standards.
  • Use of GNSS Technology: GNSS receivers provide high-precision coordinates by triangulating satellite signals, which is indispensable for establishing control points in remote or inaccessible shore areas.
  • Network Adjustment: The control points are adjusted through least squares methods to minimize errors and ensure consistency across the network.
  • Monumentation of Control Points: Physical markers such as concrete pillars or metal rods are installed on shorelines to preserve control points for future surveys.
  • Integration with Hydrographic Data: Geodetic control points serve as fixed references for hydrographic survey vessels to tie their measurements, ensuring spatial coherence.

Application in Kenyan Shorelines

In coastal counties like Mombasa and Kilifi, geodetic control surveys are critical for port expansions and coastal erosion studies. For example, surveyors working for the Kenya Ports Authority rely on geodetic control networks to ensure that dredging and construction align with approved plans. Similarly, in Lake Victoria’s Kisumu County, geodetic control is used to monitor shoreline changes affecting local fisheries.

2.1.2 Trigonometric Surveying Methods

Trigonometric surveying uses measurements of angles and distances between known points to calculate the position of new points on the shore. This method is particularly useful where GNSS signals are weak or obstructed, such as in dense mangrove areas or steep coastal cliffs.

Fundamentals of Trigonometric Surveying

  • Baseline Establishment: A known baseline length is measured precisely on the shore, serving as the foundation for triangulation.
  • Angle Measurement: Using theodolites or total stations, surveyors measure horizontal and vertical angles between control points.
  • Triangulation Calculations: Positions of unknown points are derived by solving triangles formed by the baseline and measured angles using trigonometric formulas.
  • Use of Vertical Angles: Vertical angle measurements allow determination of elevation differences critical for integrating shore control with bathymetric data.
  • Error Management: Repeated measurements and redundant observations improve accuracy and detect systematic errors.

Practical Considerations in Kenya

Trigonometric methods are widely applied in areas like the Lamu Archipelago, where dense vegetation and rugged terrain limit GNSS effectiveness. Surveyors working on environmental impact assessments for coastal infrastructure projects use this method to establish control points on inaccessible shorelines. The technique’s reliance on clear lines of sight means that survey teams must carefully select station locations, sometimes involving community engagement to access private or protected lands.

2.1.3 Differential Leveling for Shore Elevation Control

Differential leveling is a precise method for determining elevation differences between points on the shore, which is essential for linking terrestrial heights with hydrographic depths. Accurate elevation control supports the calculation of water depths relative to a common vertical datum, facilitating reliable charting and coastal engineering.

Key Aspects of Differential Leveling

  • Use of Leveling Instruments: Automatic levels or digital levels are employed to measure vertical height differences between benchmarks on the shore.
  • Establishment of Benchmarks: Permanent benchmarks are installed at strategic locations to serve as references for future surveys and tidal observations.
  • Reduction to Common Datum: Heights are converted to a common vertical datum such as the Kenya Mean Sea Level to enable integration with hydrographic data.
  • Error Sources and Corrections: Instrumental errors, refraction, and curvature of the Earth are accounted for through systematic procedures and repeated measurements.
  • Linking Shore and Hydrographic Surveys: Elevation control points provide critical vertical references for tide gauge calibration and depth soundings.

Application in Kenyan Hydrographic Projects

At Mtwapa Creek near Kilifi, differential leveling is used to establish shore benchmarks that support tidal monitoring and sediment transport studies. Surveyors working with the National Environment Management Authority (NEMA) rely on these benchmarks to assess sea level rise impacts on coastal communities. The precision of differential leveling ensures that hydrographic surveys accurately reflect shoreline topography and water depths.

2.1.4 Photogrammetric and Remote Sensing Methods

Advancements in photogrammetry and remote sensing provide innovative shore control methods by extracting spatial information from aerial photographs, drones, or satellite imagery. These techniques complement traditional ground surveys by covering large, inaccessible areas efficiently.

Principles of Photogrammetric Shore Control

  • Image Acquisition: High-resolution aerial or drone images capture shore features with spatial and spectral detail.
  • Ground Control Points (GCPs): Known control points on shore are used to georeference and calibrate images, ensuring spatial accuracy.
  • Digital Terrain Model (DTM) Generation: Photogrammetry produces DTMs representing shore elevations that integrate with hydrographic data.
  • Remote Sensing Data Integration: Satellite imagery supports shoreline change detection and habitat mapping.
  • Accuracy and Limitations: While efficient, photogrammetric methods require ground truthing and may be affected by vegetation cover or water turbidity.

Kenyan Context and Usage

The Kenya Wildlife Service employs drone-based photogrammetry to map the shores of Lake Naivasha for conservation planning. Similarly, county governments along the coastline use satellite imagery to monitor erosion and illegal reclamation activities. These remote sensing methods reduce field time and enhance the spatial coverage of shore control surveys, though they depend heavily on accurate GCPs established through ground surveys.

Practice Questions

  1. Describe the role of geodetic control surveys in shore control and explain why they are critical for hydrographic surveys in Kenya. (10 marks)
  2. Explain the process of triangulation in trigonometric surveying and discuss its advantages in challenging coastal environments. (10 marks)
  3. Outline the steps involved in differential leveling for shore elevation control and its importance in linking terrestrial and hydrographic data. (12 marks)
  4. Discuss how photogrammetric methods enhance shore control surveys and identify two challenges associated with their use in Kenya. (8 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Tools, equipment and materials for shore control survey

Conducting an accurate shore control survey in Kenya requires the use of specialized tools, equipment, and materials tailored to the unique challenges of coastal and riparian environments. Shore control surveys establish fixed reference points along the shorel…

🔒2.3 Shore Control Survey

In hydrographic surveying within Kenya’s coastal and inland water bodies, shore control surveys form the backbone of accurate spatial referencing. These surveys establish fixed reference points onshore that serve as control for positioning hydrographic instrum…

🔒2.4 Shore control survey report

The shore control survey report is a critical deliverable in hydrographic survey projects, particularly in Kenya where coastal development, port expansions, and environmental monitoring require precise and reliable data. This report documents the methodologies…

Chapter Summary

This chapter covered the essential methods used in conducting shore control surveys, highlighting the various approaches to accurately establish reference points on land for hydrographic work. It detailed the specific tools, equipment, and materials necessary for these surveys, including their functions and how they contribute to precision in measurements. The process of carrying out a shore control survey was explained step-by-step, emphasizing the importance of careful planning, data collection, and verification to ensure reliable results. Attention was given to the procedures for setting up control stations and maintaining their stability throughout the survey period. Finally, the chapter addressed the preparation of a comprehensive shore control survey report, outlining the key components that document the survey findings, data accuracy, and any challenges encountered during the operation. This report serves as a critical reference for subsequent hydrographic data collection and analysis.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of conducting a shore control survey in hydrographic surveying? (2 marks)
  2. Identify three common methods used in shore control surveys and briefly describe one. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the role of shore control survey in the context of a hydrographic survey conducted by the Kenya Maritime Authority. (4 marks)
  2. Identify four common methods used in shore control surveys and briefly describe one method. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Select and prepare tools for shore control survey

Land Survey · Level 6
Hydrographic Survey
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Select, inspect, and prepare all necessary tools and equipment for conducting a shore control survey along a 50m shoreline section.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Surveyor's level (Automatic level)
Tripod stand
Levelling staff graduated in meters and centimeters
Measuring tape 30m steel
Plumb bob with string
Survey pegs (wooden)
Permanent marker pen
Notebook for recording observations
Safety boots
Reflective vest
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Surveyor's level (Automatic level)1 Pc per Candidate
2Tripod stand1 Pc per Candidate
3Levelling staff graduated in meters and centimeters1 Pc per Candidate
4Measuring tape 30m steel1 Pc per Candidate
5Plumb bob with string1 Pc per Candidate
6Survey pegs (wooden)10 Pcs per Candidate
7Permanent marker pen1 Pc per Candidate
8Notebook for recording observations1 Pc per Candidate
9Safety boots1 Pair per Candidate
10Reflective vest1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and preparation of PPE
Identified and wore safety boots correctly
(Award 1 mark for correct use of safety boots)
1
Wore reflective vest appropriately
(Award 1 mark for wearing reflective vest properly)
1
Sub-Total2
TASK 2: Identification and inspection of survey equipment
Identified surveyor's level and checked for cleanliness and damage
(Award 2 marks for correct identification and inspection)
2
Checked tripod stand for stability and damage
(Award 1 mark for proper inspection)
1
Inspected levelling staff for clear graduations and no damage
(Award 1 mark for proper inspection)
1
Checked measuring tape for full length and proper rewind
(Award 1 mark for correct inspection)
1
Inspected plumb bob string for integrity and bob for damage
(Award 1 mark for correct inspection)
1
Checked survey pegs for suitability and absence of damage
(Award 1 mark for correct inspection)
1
Sub-Total7
TASK 3: Preparation of survey equipment for use
Assembled and mounted the level on the tripod correctly
(Award 2 marks for correct assembly and mounting)
2
Levelled the instrument by adjusting tripod legs and spirit bubble
(Award 2 marks for accurate levelling)
2
Prepared levelling staff and measuring tape for use
(Award 1 mark for readiness of levelling staff and tape)
1
Organized survey pegs and marker pen for marking points
(Award 1 mark for readiness of pegs and markers)
1
Prepared notebook for recording survey observations
(Award 1 mark for notebook readiness)
1
Sub-Total7
PRODUCT CHECKLIST
Tools and equipment are clean, functional, and ready for shore control survey
(Award 3 marks for complete readiness and proper condition of all equipment)
3
PPE worn correctly and visibly
(Award 2 marks for correct PPE use)
2
Survey pegs and markers prepared for marking shore control points
(Award 2 marks for proper preparation of marking tools)
2
Sub-Total7
GRAND TOTAL23
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Conduct Baseline Measurement for Shore Control Survey

Land Survey · Level 6
Hydrographic Survey
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Conduct baseline measurement by establishing five control points spaced 10 meters apart along the shore and record the distances accurately.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Dumpy LevelField Book and Pencil
Tripod StandHigh Visibility Reflective Vest
Surveying Staff (3m graduated)Safety Boots
Measuring Tape (30m steel)
Pegging Hammer
Survey Pegs (wooden)
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Dumpy Level1 Pc per Candidate
2Tripod Stand1 Pc per Candidate
3Surveying Staff (3m graduated)2 Pcs per Candidate
4Measuring Tape (30m steel)1 Pc per Candidate
5Pegging Hammer1 Pc per Candidate
6Survey Pegs (wooden)10 Pcs per Candidate
7Field Book and Pencil1 Set per Candidate
8High Visibility Reflective Vest1 Pc per Candidate
9Safety Boots1 Pair per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Safety
Identified and used PPE appropriately including reflective vest and safety boots
(Award 1 mark for each PPE used correctly = 2 Marks)
2
Sub-Total2
TASK 2: Site Selection and Marking Control Points
Selected a suitable linear shoreline section with minimal obstacles
(Award 1 mark for correct site selection)
1
Marked five control points (A, B, C, D, E) 10 meters apart along the shore using wooden pegs
(Award 1 mark for each correctly positioned and pegged point = 3 Marks)
3
Sub-Total4
TASK 3: Establishment of Temporary Benchmark (TBM)
Established a Temporary Benchmark near the control points and pegged it
(Award 1 mark for TBM pegged correctly)
1
Recorded a Reduced Level of 500.00 m on the TBM
(Award 1 mark for correct RL assignment)
1
Sub-Total2
TASK 4: Instrument Setup and Leveling
Set up the Dumpy Level on the tripod at a suitable central location
(Award 1 mark for correct setup location)
1
Mounted and leveled the instrument with care, ensuring the spirit bubble is centered
(Award 2 marks for correct mounting and leveling)
2
Sub-Total3
TASK 5: Measurement and Booking
Measured baseline distances between control points accurately using measuring tape
(Award 1 mark for each correctly measured segment = 3 Marks)
3
Booked measurements correctly in the field book using standard format
(Award 2 marks for correct booking format and clarity)
2
Sub-Total5
TASK 6: Arithmetic Reduction and Checks
Performed arithmetic checks on baseline measurements to ensure accuracy
(Award 3 marks for correct calculations and checks)
3
Sub-Total3
PRODUCT CHECKLIST
Baseline distances between points A, B, C, D, and E are recorded correctly with 10m spacing ± 0.05m tolerance
(Award 5 marks for accuracy within tolerance)
5
Temporary Benchmark established and clearly marked with correct Reduced Level of 500.00 m
(Award 3 marks for correct TBM marking and RL)
3
Field book entries are neat, complete, and follow standard booking format
(Award 3 marks for neatness and completeness)
3
Sub-Total11
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Perform leveling and height measurements for shore control pointsPractical 3
🔒Traverse Survey Along Shoreline for Shore ControlPractical 4
🔒Record and organize shore control survey data for five shore pointsPractical 5
🔒Plotting Shore Control Survey Points on a MapPractical 6
🔒Analyze and Adjust Shore Control Survey Data for Accuracy and ConsistencyPractical 7
🔒Prepare shore control survey report for a coastal sitePractical 8
🔒Present Shore Control Survey Results with SketchesPractical 9
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Choose the right shore control survey methods that fit the specific needs of your job.
  • Select the correct tools, equipment, and materials needed for shore control surveys accurately.
  • Perform shore control surveys safely and correctly, following all work requirements.
  • Prepare detailed and clear shore control survey reports that meet job standards.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.