Land Survey  ·  Level 6
Conduct Engineering Survey II
Chapter 2: Conduct underground survey
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Select the right tools, equipment, and materials needed for an engineering survey reconnaissance based on the job requirements.
  • Analyze site characteristics accurately to understand the survey area well.
  • Prepare a clear and complete engineering survey reconnaissance report following the correct work procedures.
  • Choose appropriate tools, equipment, and materials for taking ground levels according to the survey objectives.
  • Identify existing control points correctly by recognizing their specific types.
  • Accurately take ground levels following the objectives of the survey.
  • Record ground levels properly following the non-title survey guidelines.

Mastering these skills ensures you can conduct underground surveys confidently and contribute to successful engineering projects in the real world.

Conducting underground surveys is a critical aspect of land surveying in Kenya, particularly in urban areas with complex infrastructure networks such as Nairobi and Mombasa. The ability to accurately transfer horizontal and vertical controls from surface benchmarks to underground points ensures that construction, mining, and utility projects proceed according to design specifications and safety standards. This chapter focuses on the technical procedures and considerations necessary for precise control transfer, which forms the foundation for reliable underground mapping and development.

2.1 Transfer of horizontal and vertical controls from surface to underground

Transferring control points from the surface to underground environments is a specialized process that requires careful planning and precise execution. In Kenya, underground surveys support activities in tunnels, sewer systems, mining operations, and basements. The integrity of horizontal and vertical controls is paramount to avoid costly errors and ensure compliance with engineering and regulatory standards.

2.1.1 Principles of Horizontal Control Transfer

Horizontal control transfer involves establishing underground points that maintain consistent positional relationships with surface control points in the horizontal plane. This process is essential for aligning underground works with surface layouts and existing infrastructure.

Establishing Reference Surface Controls

  • Accuracy of surface control points: Surface controls must be established with high precision using geodetic methods such as GPS or total station traversing to serve as reliable references.
  • Selection of stable benchmarks: Preferably, surface benchmarks should be located on immovable and stable ground to minimize positional changes over time.
  • Use of control networks: A well-distributed network of horizontal control points on the surface facilitates accurate point transfer underground.
  • Documentation and verification: Comprehensive records of control point coordinates and monument descriptions ensure traceability and facilitate re-occupation.
  • Coordination with project design: Surface control points should correspond with the engineering design to ensure alignment between survey data and construction plans.

Techniques for Horizontal Control Transfer

  • Plumb line method: Using a plumb bob suspended from the surface to mark vertical alignment directly downwards to underground points.
  • Optical methods: Employing total stations or theodolites positioned at surface or underground stations to sight and establish horizontal coordinates.
  • Use of shafts or boreholes: Vertical openings provide access points for transferring horizontal positions through direct line-of-sight or instrumentation.
  • Triangulation and trilateration underground: Establishing a local control network underground tied to surface points through precise angular and distance measurements.
  • Electronic distance measurement (EDM): Utilizing EDM instruments to measure distances between surface and underground control points accurately.

2.1.2 Principles of Vertical Control Transfer

Vertical control transfer ensures that underground points have accurately determined elevations relative to surface benchmarks. This is vital for drainage design, structural integrity, and safety in underground construction.

Establishing Vertical Reference Points on Surface

  • Use of permanent benchmarks: Surface benchmarks with known reduced levels (RLs) provide starting points for vertical control.
  • Selection of stable elevation points: Locations less prone to subsidence or disturbance are preferred to maintain consistent vertical references.
  • Integration with national height datum: Surface elevations should be referenced to Kenya’s established vertical datum to ensure consistency.
  • Verification of surface benchmarks: Regular checks and re-leveling confirm the stability of vertical controls.
  • Coordination with project requirements: Vertical control points must align with design elevation criteria to avoid structural conflicts.

Methods of Vertical Control Transfer Underground

  • Direct plumb line drop: A plumb line suspended from a surface benchmark allows direct determination of underground point elevation.
  • Differential leveling: Using precise leveling instruments to measure vertical differences through shafts or accessible openings.
  • Barometric leveling: Employing barometers to estimate elevation differences based on atmospheric pressure changes, useful where direct line-of-sight is unavailable.
  • Use of laser levels: Laser instruments provide continuous vertical reference lines for transferring elevations over distances.
  • Trigonometric leveling: Calculating elevation differences using measured vertical angles and horizontal distances with total stations.

2.1.3 Equipment and Instrumentation for Control Transfer

Accurate transfer of controls underground necessitates specialized equipment capable of operating in confined and challenging environments while maintaining measurement precision.

Name Specification Use
Total Station Electronic theodolite with EDM Measuring angles and distances for control transfer
Digital Level High-precision optical leveling device Establishing vertical control through differential leveling
Plumb Bob Weighted string for vertical alignment Transferring points directly below surface benchmarks
Laser Level Self-leveling laser beam projector Providing continuous horizontal or vertical reference lines
Reflector Prism High-precision target for EDM Enhancing distance measurement accuracy in confined spaces
  • Total stations are used extensively for both horizontal and vertical control transfer due to their ability to measure angles and distances precisely.
  • Digital levels facilitate accurate vertical control where direct plumb lines are impractical.
  • Plumb bobs serve as simple yet effective tools for transferring points vertically in shafts or boreholes.
  • Laser levels offer flexibility in establishing reference lines in tunnels or underground chambers.
  • Reflector prisms improve EDM accuracy by providing a precise target for the instrument’s infrared beam.

2.1.4 Challenges in Control Transfer and Mitigation Strategies

Underground environments pose unique challenges that can compromise the accuracy of control transfer. Understanding these challenges and implementing appropriate mitigation measures is essential for successful surveys.

Environmental and Physical Challenges

  • Limited line-of-sight: Underground passages and shafts may obstruct direct sighting, complicating measurements.
  • Vibrations and movements: Machinery and construction activities can induce vibrations, affecting instrument stability.
  • Poor lighting conditions: Insufficient illumination hampers visual observations and instrument readings.
  • Restricted space and access: Tight spaces limit instrument placement and operator movement.
  • Humidity and dust: Environmental factors can degrade instrument performance and measurement reliability.

Mitigation Strategies

  • Use of specialized underground instruments: Devices designed for low-light and confined spaces improve data quality.
  • Stabilizing instrument setups: Employing tripods with vibration dampeners and securing instruments firmly reduces measurement errors.
  • Establishing control points in accessible locations: Whenever possible, setting control points in areas with better access facilitates easier measurements.
  • Regular instrument calibration and maintenance: Ensures optimal performance despite harsh conditions.
  • Employing multiple measurement methods: Cross-verification using different techniques enhances reliability and identifies discrepancies.

Practice Questions

  1. Explain the importance of transferring horizontal control from surface benchmarks to underground points in engineering surveys. (6 marks)
  2. Describe six steps involved in transferring vertical control from surface to underground using differential leveling. (12 marks)
  3. Identify and explain five challenges faced during underground control transfer and suggest appropriate mitigation measures for each. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Underground Survey Procedures

Underground surveys are critical in land surveying projects that involve mapping subterranean features such as utility lines, tunnels, drainage systems, and geological formations. In Kenya, where urban development and infrastructure projects are expanding rapi…

🔒2.3 Applications of underground survey

Underground surveys are essential in land surveying to accurately map subsurface features that impact construction, urban planning, and resource management across Kenya. These surveys reveal the location of utilities, geological formations, and infrastructural…

🔒2.4 Prepare a built survey map

The preparation of a built survey map is a fundamental skill for land surveyors engaged in underground surveys. It involves compiling, processing, and presenting survey data to create an accurate graphical representation of subsurface and surface features. The…

Chapter Summary

This chapter focused on the essential process of conducting underground surveys in engineering projects. It began with methods for transferring horizontal and vertical controls from the surface to underground environments, ensuring accurate spatial referencing below ground. Following this, detailed underground survey procedures were explored, highlighting the systematic steps required to collect reliable data in confined and complex subterranean settings. The chapter also examined various applications of underground surveying, demonstrating its critical role in construction, mining, and infrastructure development. Finally, the preparation of built survey maps was discussed, emphasizing the importance of translating raw survey data into clear, usable visual representations for project planning and execution. Together, these topics provide a comprehensive foundation for managing underground surveys effectively in engineering contexts.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of transferring horizontal and vertical controls from the surface to underground in engineering surveys? (2 marks)
  2. List four common instruments used in underground survey procedures. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the importance of transferring horizontal and vertical control points from surface to underground survey works in a tunnel project at the Thika Superhighway expansion site. (4 marks)
  2. Describe the main methods used for transferring vertical control from surface to underground environments during mining surveys. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Establish Horizontal Control Points on Surface for Underground Survey

Land Survey · Level 6
Conduct Engineering Survey II
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Establish and mark four horizontal control points forming a rectangle 40m by 25m on the surface.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Total Station with tripod and accessoriesSurvey pegs
Ranging rodsWriting materials (foolscap sheets)
50m Steel tape
Survey pegs
Levelling field notebook
Pencil and eraser
Scientific calculator
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Total Station with tripod and accessories1 Pc per 3 Candidates
2Ranging rods2 Pcs per Candidate
350m Steel tape1 Pc per Candidate
4Survey pegs10 Pcs per Candidate
5Levelling field notebook1 Pc per Candidate
6Writing materials (foolscap sheets)5 Sheets per Candidate
7Pencil and eraser1 Set per Candidate
8Scientific calculator1 Pc per Candidate
9Safety boots or closed shoes1 Pair per Candidate
10High visibility vest or dust coat1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Identified and used PPE appropriately: safety boots/closed shoes and high visibility vest or dust coat
(Award 2 marks for correct PPE usage)
2
Assessed and selected a suitable site free from major obstacles for setting out control points
(Award 2 marks for correct site assessment and clearing)
2
Set up Total Station correctly on a stable point and performed accurate leveling and centering
(Award 3 marks for proper setup and leveling)
3
Sub-Total7
TASK 2: Setting Out Control Points
Set out baseline AB measuring exactly 40.00 m using steel tape and pegs
(Award 3 marks for correct baseline measurement and pegging)
3
Set out perpendicular lines at points A and B measuring 25.00 m to points D and C respectively using Total Station and ranging rods
(Award 4 marks for correct perpendicular set out and measurement)
4
Pegged and labelled points C and D correctly to complete the rectangle
(Award 2 marks for correct pegging and labelling)
2
Sub-Total9
TASK 3: Recording and Verification
Recorded all measurements accurately in the levelling field notebook using correct format and units
(Award 3 marks for correct and neat recording)
3
Verified horizontal distances and angles between control points using Total Station and performed arithmetic checks
(Award 3 marks for verification and accuracy)
3
Sub-Total6
PRODUCT CHECKLIST
Control points form a rectangle measuring 40m by 25m with maximum allowable error ±5 cm
(Award 6 marks for dimension accuracy within tolerance)
6
Points pegged firmly and labelled clearly with durable markers
(Award 3 marks for neat and durable pegging and labelling)
3
Field notes are complete, legible, and correctly formatted
(Award 3 marks for completeness and legibility of notes)
3
Sub-Total12
GRAND TOTAL34
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Establish vertical control benchmarks on surface for underground survey

Land Survey · Level 6
Conduct Engineering Survey II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Establish and record three vertical control benchmarks on surface with Reduced Levels referenced to 1000.00m as per site survey requirements.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Levelling instrument with accessoriesPegs
Ranging rodsWriting materials (foolscap papers)
Levelling field notebookPencil and eraser
50m Steel tape
Pegs
Writing materials (foolscap papers)
Pencil and eraser
Scientific calculator
Scale rule (Metric) and set squares
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Levelling instrument with accessories1 set per 3 Candidates
2Ranging rods2 pcs per Candidate
3Levelling field notebook1 pc per Candidate
450m Steel tape1 pc per 3 Candidates
5Pegs10 pcs per Candidate
6Writing materials (foolscap papers)5 pcs per Candidate
7Pencil and eraser1 set per Candidate
8Scientific calculator1 pc per Candidate
9Scale rule (Metric) and set squares1 set per Candidate
10Safety boots/closed shoes1 pair per Candidate
11Dust coat/reflector apron1 per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Identified and wore appropriate PPE (dust coat/reflector apron, safety boots/closed shoes)
(Award 2 marks for correct PPE use; zero if missing)
2
Checked and prepared levelling instrument and accessories
(Award 2 marks for proper preparation and functionality check)
2
Sub-Total4
TASK 2: Site selection and setup
Selected stable and accessible points on surface for benchmarks
(Award 3 marks for appropriate site selection)
3
Set up temporary benchmark (TBM) with peg and marked Reduced Level 1000.00m
(Award 3 marks for correct TBM establishment and marking)
3
Sub-Total6
TASK 3: Levelling operations
Correctly set up and levelled instrument over TBM and other points
(Award 3 marks for accurate instrument setup and levelling)
3
Took staff readings at benchmark points and recorded observations correctly in field notebook
(Award 4 marks for accurate readings and proper booking format)
4
Sub-Total7
TASK 4: Level reduction and calculations
Reduced levels using rise and fall method accurately
(Award 4 marks for correct arithmetic and method use)
4
Performed arithmetic checks for accuracy
(Award 2 marks for error-free checks)
2
Sub-Total6
TASK 5: Benchmark marking and documentation
Pegged and labelled three benchmarks clearly with RL values
(Award 4 marks for neat and clear marking)
4
Sub-Total4
PRODUCT CHECKLIST
Three vertical control benchmarks established with RLs accurate to ±2mm and clearly marked
(Award 8 marks for accuracy and clarity matching task dimensions)
8
Sub-Total8
GRAND TOTAL35
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Transfer Horizontal Control Points from Surface to Underground Survey StationPractical 3
🔒Transfer vertical control benchmark from surface to underground using leveling instrumentsPractical 4
🔒Conduct underground traverse survey by measuring angles and distances between stationsPractical 5
🔒Perform underground leveling survey to determine elevation differencesPractical 6
🔒Prepare underground survey field notes and calculations for a tunnel sectionPractical 7
🔒Prepare built survey map from underground survey dataPractical 8
🔒Verification and Adjustment of Tunnel Alignment Using Underground Survey DataPractical 9
🔒Excavation Volume Estimation Using Underground SurveyPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Select the right tools, equipment, and materials needed for an engineering survey reconnaissance based on the job requirements.
  • Analyze site characteristics accurately to understand the survey area well.
  • Prepare a clear and complete engineering survey reconnaissance report following the correct work procedures.
  • Choose appropriate tools, equipment, and materials for taking ground levels according to the survey objectives.
  • Identify existing control points correctly by recognizing their specific types.
  • Accurately take ground levels following the objectives of the survey.
  • Record ground levels properly following the non-title survey guidelines.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.