Land Survey  ·  Level 6
Cadastral Survey
Chapter 2: Establish cadastral survey control points
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • select the appropriate tools, equipment, and materials to establish cadastral control points safely and accurately,
  • identify existing control points correctly according to their specific types,
  • choose the right methods to establish cadastral survey control points in line with work requirements,
  • monument cadastral survey control points properly following the survey manual.

Mastering these skills will help you contribute to precise land boundary surveys, which are essential for property ownership and development in the real world.

Establishing cadastral survey control points is a fundamental step in land surveying that ensures accurate boundary delineation and legal land parcel identification in Kenya. These control points form the spatial framework upon which cadastral surveys are based, facilitating precise measurements and reducing disputes. For land survey professionals, mastery of the tools, equipment, and methodologies used in establishing these control points is vital to uphold the integrity of land records and support land administration systems.

2.1 Tools, equipment and materials for establishment of cadastral control points

In cadastral surveying, selecting appropriate tools and equipment is critical to achieving high accuracy and reliability. Surveyors in Kenya utilize a blend of traditional and modern technologies, such as traversing instruments and Global Navigation Satellite Systems (GNSS), depending on the terrain, survey scale, and project requirements. Understanding the specifications, applications, and maintenance of these tools ensures consistency in establishing control points under diverse field conditions.

Angle and distance measuring equipment

These instruments measure the horizontal angles, vertical angles and distances from which the coordinates of new control points are computed. Their accuracy sets the accuracy of the whole control network, so they must be calibrated and in good adjustment before fieldwork. Example: before establishing control for a subdivision for a teachers' SACCO, a survey firm checks its total station's EDM on a calibration baseline.

Name Specification Use
Total station Angle accuracy 1 to 5 seconds; EDM range 1 to 5 km with prism; accuracy about ±(2 mm + 2 ppm) Measuring angles and distances together and storing observations
Theodolite Electronic or optical, angle reading to 1 second Measuring horizontal and vertical angles where distances are measured separately
Electronic distance measurer (EDM) Infrared or laser, range up to several kilometres Measuring long distances accurately for traverses and trilateration
Steel tape 30 m or 50 m, calibrated, with tension handle and thermometer Measuring short distances and checking EDM lengths
Fibreglass tape 30 m or 50 m, non-conductive Measuring offsets and short distances near power lines
  • Total station: The main instrument for traversing and trilateration; it must be centred and levelled precisely over the mark and protected from rain and dust.
  • Theodolite: Used where a total station is not available or for high-precision angle work; observations are taken on both faces to remove instrument errors.
  • Electronic distance measurer: Distances must be corrected for temperature and pressure, so a thermometer and barometer are carried with it.
  • Steel tape: Gives accurate short distances when used at standard tension and corrected for temperature, slope and sag.
  • Fibreglass tape: Safer near electricity but stretches more than steel, so it is used only for lower-accuracy measurements.

GNSS equipment

GNSS equipment fixes the coordinates of control points from satellite signals, either in real time or by post-processing. A typical control kit includes a base receiver, a rover, radio or internet links and processing software. Example: a surveyor fixing control for a large ranch in a remote area uses two geodetic receivers in static mode and processes the data in the office.

Name Specification Use
Geodetic GNSS receiver Multi-constellation, multi-frequency; static accuracy about 3 to 5 mm + 0.5 ppm Fixing control coordinates by static or RTK methods
GNSS antenna Geodetic-grade with ground plane or choke ring Receiving signals while reducing multipath
Radio modem or GSM link UHF radio or mobile data connection Sending corrections from base to rover or from a CORS network
Field controller Rugged handheld with survey software Controlling receivers and storing coordinates
Processing software Baseline processing and network adjustment Computing final coordinates from GNSS observations
  • Geodetic GNSS receiver: Only survey-grade receivers are used for cadastral control; handheld navigation receivers are not accurate enough.
  • GNSS antenna: The antenna height must be measured and recorded at every occupation, since an error in it passes directly into the height of the point.
  • Radio modem or GSM link: Range depends on terrain and network coverage, so links are tested before work starts.
  • Field controller: Holds the job settings, coordinate system and stored points, so it is backed up daily.
  • Processing software: Checks baseline quality and adjusts the network to known control.

Levelling equipment

Levelling equipment gives the heights of control points relative to a benchmark. Example: control points for a water company's land are levelled so pipeline designs use the same datum.

Name Specification Use
Automatic level Compensator, magnification 24× to 32× Taking staff readings for height differences
Digital level Reads bar-coded staff electronically Fast, precise levelling with stored readings
Levelling staff 4 m or 5 m, aluminium or invar, with staff bubble Providing readings at backsight and foresight points
Change plate Heavy steel plate with raised centre Giving a stable point for the staff on soft ground
Staff bubble Circular bubble attached to the staff Keeping the staff vertical while reading
  • Automatic level: Its line of sight is checked regularly with the two-peg test.
  • Digital level: Removes reading and booking errors but needs charged batteries and a clean bar-code staff.
  • Levelling staff: Must be held vertical and kept clean; worn or damaged joints cause reading errors.
  • Change plate: Prevents the staff sinking between foresight and backsight.
  • Staff bubble: Its adjustment is checked against a plumb line.

Accessories and field equipment

Accessories hold instruments and targets steady and exactly over the survey mark, so faults in them cause errors even with an accurate instrument.

Name Specification Use
Tripod Wooden or aluminium, adjustable legs, 5/8 inch thread Stable mounting for instruments and targets
Tribrach With optical or laser plummet and levelling screws Centring and levelling instruments, prisms and antennas
Prism and prism pole Survey prism with known constant; pole with bubble Reflecting EDM signals at the target point
Ranging rods 2 m, painted red and white Marking points and lines for sighting
Plumb bob Brass, with cord Centring over marks and checking verticality
Hammer and cold chisel Club hammer, steel chisel Driving pins and cutting marks in rock or concrete
Hand-held radios Two-way radios Communication between instrument and target crews
  • Tripod: Legs are spread well and pressed firmly into the ground, and clamps are tightened before setting up.
  • Tribrach: The plummet is checked regularly, because an out-of-adjustment plummet misplaces every point.
  • Prism and prism pole: The prism constant set in the instrument must match the prism used.
  • Ranging rods: Held vertical behind the mark to give a clear line of sight.
  • Plumb bob: Used when centring in wind-free conditions or to check the optical plummet.
  • Hammer and cold chisel: Used to set pins and cut crosses for marks on rock or concrete surfaces.
  • Hand-held radios: Speed up fieldwork and improve safety on long lines.

Recording and computing equipment

Name Specification Use
Field book Waterproof pages, bound Recording observations, sketches and station descriptions
Data collector Rugged handheld with survey software Storing digital observations
Scientific calculator Trigonometric and statistical functions Field checks of angles and misclosures
Laptop with survey and CAD software Traverse, adjustment and drawing programs Computing coordinates and preparing plans
Base maps and control lists Survey plans, coordinates of existing control Locating and using existing control points
  • Field book: Records must be neat, complete and in ink, since they are legal evidence of the survey.
  • Data collector: Data is downloaded and backed up every day.
  • Scientific calculator: Used to check angle sums and misclosures before leaving each station.
  • Laptop with software: Used for adjustments and for the plans submitted for approval.
  • Base maps and control lists: Obtained from the Survey of Kenya before fieldwork.

Materials for control points

Materials are consumed in marking and protecting the new control points so that they can be found and used for many years.

Name Specification Use
Cement, sand and ballast Concrete mix about 1:2:4 Casting concrete beacons and surrounds
Iron pins or rods 12 mm to 16 mm diameter, about 600 mm long Marking the exact point in the beacon
Pre-cast concrete beacons Standard size with centre mark Permanent control marks
Wooden pegs About 50 × 50 × 400 mm Temporary marks during reconnaissance and setting out
Survey nails and paint Masonry nails, bright enamel paint Marking points on roads and rock and making them visible
Station description forms Standard forms Recording location, sketch and reference ties of each point
  • Cement, sand and ballast: Mixed and cured properly so the beacon does not crack or move.
  • Iron pins or rods: Give a sharp, durable centre point that instruments are centred over.
  • Pre-cast concrete beacons: Save time in the field and give consistent marks.
  • Wooden pegs: Mark points temporarily until permanent beacons are placed.
  • Survey nails and paint: Make marks on hard surfaces findable and easy to identify.
  • Station description forms: Allow other surveyors to recover the point later.

Procedure for preparing equipment before fieldwork

  1. Check the job requirements: Confirm the accuracy class, number of points and method to be used so the right equipment is selected.
  2. Assemble the kit: List and gather instruments, accessories, materials and records using a checklist.
  3. Inspect each item: Check instruments, tripods, tribrachs and tapes for damage and loose parts.
  4. Test and calibrate: Carry out adjustment checks such as plummet, collimation and two-peg tests, and EDM baseline checks.
  5. Charge and back up: Charge batteries, clear and back up data collectors and set the correct coordinate system.
  6. Pack safely: Pack instruments in their cases and secure them for transport.
  7. Record: Note serial numbers, calibration dates and items issued in the equipment register.

Care and maintenance of equipment

  • Cleaning: Wipe instruments, prisms and staff with soft cloths and keep lenses free of dust.
  • Protection from weather: Use umbrellas and covers in sun and rain, and dry instruments before casing them.
  • Safe transport: Carry instruments in padded cases and never on the tripod over long distances.
  • Batteries: Charge fully, store at room temperature and replace when they no longer hold charge.
  • Regular calibration: Have instruments serviced and calibrated at set intervals and after any knock.
  • Storage: Store in a dry, secure store with records of who has each item.
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Identify control points

Identifying control points means finding out which points of known coordinates already exist in and around the survey area, recovering them on the ground, proving that they have not moved, and choosing where any new control points will go. A cadastral survey m…

🔒2.3 Methods of establishing cadastral survey control points

Cadastral survey control points are permanently marked stations of known coordinates from which property boundaries are surveyed, re-established and checked. They can be established by several methods, chosen according to the accuracy required, the terrain, th…

🔒2.4 Cadastral survey control points monumentation

Cadastral survey control points monumentation is a critical phase in land surveying that ensures the permanent marking of surveyed boundaries and reference points. In Kenya, where land disputes are prevalent, proper monumentation guarantees legal recognition a…

Chapter Summary

This chapter focused on the essential tools, equipment, and materials required for establishing cadastral survey control points, highlighting their specific roles in accurate surveying. It explained how control points are identified using oral points to ensure clear communication and verification. Various methods for establishing cadastral control points were detailed, including traversing, GNSS, triangulation, levelling, and trilateration, each described with their unique procedures and applications. The chapter emphasized the importance of selecting appropriate techniques depending on the survey context and accuracy requirements. Finally, the process of monumenting cadastral survey control points was covered, outlining the standards and materials used to create durable and visible markers that define property boundaries reliably. Overall, the chapter provided a comprehensive guide to establishing precise and legally recognized control points in cadastral surveying.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which of the following is NOT a common tool used in establishing cadastral control points?
    a) Theodolite
    b) Leveling staff
    c) Soil auger
    d) GNSS receiver
    (2 marks)

  2. Define an oral point in the context of cadastral survey control. (3 marks)

🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. List four essential tools used in the establishment of cadastral control points in Kenya. (4 marks)
  2. Explain the purpose of using oral points in identifying cadastral control points. (4 marks)
🔒26 more in this section.

Chapter Practical Activities

Practical 1: Identify and verify oral points as cadastral control points in the field

Land Survey · Level 6
Cadastral Survey
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and mark four cadastral control points using oral points and measure distances between them with 30m tape as per field instructions.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Handheld GPS receiverPegs
30m measuring tapeWriting materials (foolscap paper, pen)
Hammer
Scientific calculator
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Handheld GPS receiver1 Pc per Candidate
230m measuring tape1 Pc per Candidate
3Pegs6 Pcs per Candidate
4Writing materials (foolscap paper, pen)3 Sets per Candidate
5Hammer1 Pc per 3 Candidates
6Scientific calculator1 Pc per Candidate
7Closed shoes1 Pair per Candidate
8Dust coat1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Use of PPE and field preparation
Identified and wore appropriate PPE (dust coat, closed shoes)
(Award 2 marks for correct and consistent use)
2
Carried all necessary tools and materials to the field
(Award 1 mark if all tools/materials are present)
1
Selected suitable sites for oral points based on field conditions
(Award 1 mark for appropriate site selection)
1
Sub-Total4
TASK 2: Marking and measuring control points
Marked four cadastral control points (A, B, C, D) using pegs
(Award 0.5 marks for each correctly marked point)
2
Measured distances between points A-B, B-C, C-D, and D-A accurately using 30m tape
(Award 1 mark for each accurate measurement)
3
Verified diagonal distances for squareness of control points
(Award 1 mark for correct diagonal measurement)
1
Sub-Total6
TASK 3: Recording and verifying coordinates
Correctly configured handheld GPS receiver
(Award 1 mark for proper setup)
1
Measured and recorded coordinates of points A, B, C, D
(Award 0.75 marks for each point coordinate correctly recorded)
3
Accurately transferred coordinates to writing materials
(Award 1 mark for neat and complete recording)
1
Sub-Total5
PRODUCT CHECKLIST
Control points A, B, C, D correctly marked and pegged in the field
(Award 1 mark for each point correctly pegged)
3
Distances between points measured within ±0.05m accuracy
(Award full marks if all distances are within tolerance)
3
Coordinates of control points correctly recorded and consistent with field measurements
(Award marks based on accuracy and completeness)
4
Sub-Total10
GRAND TOTAL25
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Establish cadastral survey control points by traversing a rectangular parcel

Land Survey · Level 6
Cadastral Survey
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Establish and mark control points A, B, C, D by traversing a rectangular parcel measuring 50m by 30m and record all measurements and coordinates accurately.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Handheld GPS receiverSurvey pegs
30m steel tapeWriting materials (foolscap pads)
Hammer/MalletA4 printing papers
Scientific calculator
Computer with Microsoft Office and ArcGIS software
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Handheld GPS receiver1 Pc per Candidate
230m steel tape1 Pc per Candidate
3Survey pegs6 Pcs per Candidate
4Hammer/Mallet1 Pc per 5 Candidates
5Writing materials (foolscap pads)5 Pcs per Candidate
6Scientific calculator1 Pc per Candidate
7A4 printing papers2 Pcs per Candidate
8Computer with Microsoft Office and ArcGIS software1 Pc per 5 Candidates
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and PPE
Identified and used appropriate PPE: boots, dust coat/apron
(Award 2 marks for correctly identifying and using PPE)
2
Sub-Total2
TASK 2: Marking and measuring control points
Marked points A, B, C, D correctly on ground forming a rectangle
(Award 1 mark for each pair of points correctly marked)
2
Measured distances AB=50m and BC=30m accurately using 30m tape
(Award 1 mark for each correct measurement)
2
Checked diagonals AC and BD for accuracy and rectangular shape
(Award 2 marks for correctly measuring and verifying diagonals)
2
Sub-Total6
TASK 3: Coordinate acquisition
Correctly configured handheld GPS receiver
(Award 2 marks for proper GPS setup)
2
Measured and recorded coordinates of points A, B, C, D accurately
(Award 1 mark per point for accurate coordinate recording)
4
Transferred coordinates legibly to writing materials
(Award 2 marks for neat and accurate transcription)
2
Sub-Total8
TASK 4: Traversing observations
Set up the total station or theodolite at point A with proper centering, levelling, and focusing
(Award 2 marks for proper instrument setup)
2
Oriented instrument to point B correctly
(Award 3 marks for correct orientation)
3
Observed and recorded bearings and distances to points B, C, D sequentially
(Award 1 mark per correctly recorded bearing and distance)
3
Sub-Total8
TASK 5: Calculations
Computed X and Y coordinates of parcel corners using traverse data
(Award 4 marks for correct coordinate computations)
4
Calculated area of the parcel using coordinate method correctly
(Award 4 marks for accurate area calculation)
4
Sub-Total8
TASK 6: Cadastral plan preparation
Prepared cadastral plan at a suitable scale (1:1000) showing points A, B, C, D
(Award 3 marks for correct scale and plotting)
3
Labeled all points and grid lines correctly
(Award 2 marks for correct labeling)
2
Exported plan in PDF format and printed on A4 paper
(Award 2 marks for proper export and printing)
2
Sub-Total7
PRODUCT CHECKLIST
Control points A, B, C, D correctly marked and spaced: AB=50m, BC=30m within ±0.1m
(Award 3 marks for accurate point positioning)
3
Coordinates of points A, B, C, D recorded correctly with latitude and longitude to 5 decimal places
(Award 3 marks for coordinate accuracy)
3
Area of parcel computed correctly within 1% tolerance
(Award 3 marks for accurate area computation)
3
Cadastral plan plotted to scale 1:1000 with neatness and correct labeling
(Award 3 marks for plan accuracy and presentation)
3
Sub-Total12
GRAND TOTAL51
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Establish cadastral control points using GNSSPractical 3
🔒Establish cadastral control points by triangulation for a rectangular parcelPractical 4
🔒Perform levelling to determine elevations of cadastral control pointsPractical 5
🔒Monumentation of Cadastral Survey Control PointsPractical 6
🔒Select and prepare tools and materials for establishing cadastral control pointsPractical 7
🔒Establish cadastral survey control points by combined traversing and levellingPractical 8
🔒Establish a cadastral control network combining triangulation and trilaterationPractical 9
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 18 questions Start quiz ▾
0%
0 / 2
🔒

16 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • select the appropriate tools, equipment, and materials to establish cadastral control points safely and accurately,
  • identify existing control points correctly according to their specific types,
  • choose the right methods to establish cadastral survey control points in line with work requirements,
  • monument cadastral survey control points properly following the survey manual.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.