By the end of this chapter, you will be able to:
Mastering these skills ensures you collect reliable data that forms the foundation for successful engineering projects.
Collecting original ground levels is a fundamental activity in land surveying, especially in engineering projects where precise vertical positioning informs design and construction. This chapter focuses on the essential tools, equipment, and materials required to collect accurate ground level data in Kenya’s diverse terrain. Surveyors working in counties such as Uasin Gishu or Kisumu must be adept at selecting and handling these instruments to ensure data integrity and reliability. Mastery of these tools enables survey professionals to provide crucial inputs for infrastructure projects, land development, and environmental management.
The accuracy of ground level data depends heavily on the quality and suitability of the tools and materials used in the field. Surveyors must be familiar with each item’s specifications, proper usage, and maintenance to achieve consistent results. In Kenyan land surveying practice, these tools range from optical instruments to simple hand tools, each playing a distinct role in the process.
| Name | Specification | Use |
|---|---|---|
| Automatic Level | 24x magnification, ±0.5mm per km accuracy | Measure height differences by sighting staff readings |
| Adjustable Tripod | Lightweight aluminum, adjustable legs up to 1.5m | Support and stabilize the level on uneven ground |
| Spirit Vial (Oral) | Bubble vial attached to level for horizontal alignment | Confirm horizontal positioning of the level before use |
The level’s precision directly affects the reliability of ground level data. Inaccurate levels can cause cumulative errors in height measurements, leading to flawed engineering designs. For example, at a county government construction site in Kisii, poor leveling could result in drainage systems that fail to function properly.
Proper setup involves extending tripod legs to a stable height and ensuring the head is roughly level before mounting the instrument. The level is then attached securely, and the oral is checked to confirm horizontal alignment. Adjusting foot screws fine-tunes the position to achieve perfect leveling.
Regular maintenance includes cleaning lenses, checking the optical plummet, and verifying calibration against known benchmarks. Calibration should be conducted annually or after any significant shock to the instrument. For instance, surveyors at Nairobi Water Company routinely calibrate their levels to maintain accuracy in water pipeline installations.
The levelling staff is a graduated rod used to measure the vertical distance from the instrument’s line of sight to the ground. It is typically made of wood, aluminum, or fiberglass and features clear graduations in meters and centimeters.
| Name | Specification | Use |
|---|---|---|
| Telescopic Staff | Extendable up to 5 meters, graduated in centimeters | Measure vertical height differences from level sight line |
| Wooden Staff | Fixed length 3 meters, painted with black and white bands | Used for quick approximate readings on flat terrain |
Common types include the invar staff for high precision, the aluminium telescopic staff for portability, and the wooden staff for rugged conditions. Each type suits different surveying environments; for example, an aluminium telescopic staff is preferred in urban surveys for ease of transport.
The surveyor or assistant holds the staff vertically on the point being measured while the instrument operator sights through the telescope. Proper vertical alignment is critical to avoid parallax errors. In a farm survey in Meru County, correct staff handling ensures accurate contour mapping for irrigation planning.
Levelling staffs should be kept clean-free of dents, and stored in protective cases to prevent damage. Exposure to harsh sunlight or moisture can cause warping or fading of graduations, compromising accuracy. Surveyors at county offices in Nakuru emphasize routine inspection and cleaning after fieldwork.
Measuring tapes are essential for determining horizontal distances and offsets during leveling surveys. The tapes are usually made of steel or fiberglass, with metric graduations.
| Name | Specification | Use |
|---|---|---|
| Steel Tape | 30m length, metric graduations, durable coating | Measure horizontal distances accurately on various terrain |
| Fiberglass Tape | 30m length, flexible, resistant to stretching | Used in rough terrain where steel tape may be damaged |
Precision in length measurement affects the calculation of reduced levels. Stretching or damage to the tape can lead to systematic errors. For example, in the survey of a school compound in Kisumu, inaccurate tapes could distort site layout plans.
The tape must be pulled taut and kept straight without sagging. Readings should be taken at eye level to avoid parallax errors. It is advisable to use a plumb bob to mark points vertically when measuring offsets.
Tapes should be cleaned regularly, wiped dry after use, and stored in cases to prevent rust or stretching. Surveyors in Nairobi County routinely inspect tapes for kinks and replace worn-out tapes promptly.
Ranging rods are tall, brightly colored poles used to mark points and establish straight lines during surveys. They improve visibility over long distances.
| Name | Specification | Use |
|---|---|---|
| Fiberglass Ranging Rod | 2m length, alternating red and white bands, collapsible | Mark survey points and assist in line ranging |
| Wooden Ranging Rod | 2m length, painted with bright colors | Used in rough terrain where durability is essential |
Ranging rods help surveyors establish accurate straight lines between points, which is crucial in traversing and leveling. In a county road project in Machakos, proper use of ranging rods ensured alignment of the road profile.
The alternating bands of red and white enhance visibility in varied lighting and vegetation conditions. Placement at eye level of the instrument operator allows precise sighting.
Ranging rods should be handled carefully to avoid bending and kept clean for visibility. Storage in protective sleeves prevents damage during transport.
A booking sheet is a standardized form used to record field measurements and observations systematically during surveying operations.
| Name | Specification | Use |
|---|---|---|
| Survey Booking Sheet | Pre-printed columns for station, backsight, foresight, reduced level | Record leveling data for later computation and verification |
Booking sheets typically include columns for instrument stations, backsight (BS), foresight (FS), intermediate sights (IS), and calculated reduced levels (RL). Properly filled sheets facilitate error checking and data processing.
Accurate and legible entries prevent errors during data reduction. In a hotel site survey in Kisii, well-maintained booking sheets enabled swift verification of ground contours.
Booking sheets should be protected from moisture and physical damage during fieldwork. Digital backups are increasingly used alongside paper forms in county government offices.
Writing instruments are necessary for recording measurements and making notes during surveys.
| Name | Specification | Use |
|---|---|---|
| Ballpoint Pen | Blue or black ink, waterproof | Permanent recording on booking sheets |
| Mechanical Pencil | 0.5mm lead, refillable | Used for sketching and temporary notes |
Pens with waterproof ink prevent smudging and loss of data in wet conditions. Pencils allow for corrections but can fade or smudge.
Surveyors often carry both pen and pencil to balance permanence and flexibility. For example, at a cooperative farm survey in Meru, pencils are used for initial sketches before final entries in pen.
Writing instruments should be checked daily, with spares carried to avoid interruption. Keeping pens capped and pencils sharpened preserves functionality.
An eraser is used to correct pencil errors on booking sheets or sketches.
| Name | Specification | Use |
|---|---|---|
| Rubber Eraser | Soft, non-abrasive material | Remove pencil marks cleanly without damaging paper |
Erasing mistakes cleanly prevents confusion and maintains legibility. In a county health facility survey, clean corrections ensured reliable data transfer.
Applying gentle pressure avoids tearing paper or smudging adjacent text. Erasers should be clean and free from grit.
Erasers should be kept in pencil cases to avoid dirt contamination. Survey teams in Nairobi schools often keep multiple erasers for fieldwork.
Calculators assist in performing quick and accurate arithmetic operations during field computations.
| Name | Specification | Use |
|---|---|---|
| Scientific Calculator | Basic scientific functions, solar powered or battery operated | Compute reduced levels and other survey calculations |
Fast and accurate calculations reduce errors and increase efficiency in data processing. Surveyors at a retail business site in Nakuru rely on calculators for on-site computations.
A calculator with memory functions and solar power reduces dependency on batteries and supports complex computations. Durability and portability are also key.
Calculators should be protected from dust and moisture. Surveyors should verify results manually to catch potential input errors.
Pegs are used to mark surveyed points on the ground, providing physical reference during and after data collection.
| Name | Specification | Use |
|---|---|---|
| Wooden Pegs | 30cm length, pointed end, durable hardwood | Mark ground points for reference and future identification |
Pegs provide a tangible reference that can be revisited for verification or further work. For example, in a county government housing project, pegs marked plot corners for contractors.
Pegs should be sturdy enough to withstand environmental conditions and placed firmly in the ground at surveyed points.
Survey teams retrieve pegs after project completion or replace damaged ones during extended surveys. Proper storage ensures pegs remain intact for reuse.
A mallet is a tool used to drive pegs into the ground without damaging them.
| Name | Specification | Use |
|---|---|---|
| Wooden Mallet | 500g weight, hardwood head and handle | Drive pegs securely into hard or compacted soil |
Using a mallet prevents splitting or breaking pegs and ensures they are driven to the correct depth. At agricultural cooperative surveys in Bungoma, mallets help set pegs firmly in rocky soils.
The mallet should be swung with controlled force to avoid injury and equipment damage. Surveyors must wear gloves for grip and protection.
Mallets should be inspected for cracks and cleaned after use. Wooden mallets benefit from occasional oiling to prevent drying and splitting.
Marker pens are used to make visible marks on pegs, staffs, or other surfaces for identification.
| Name | Specification | Use |
|---|---|---|
| Permanent Marker | Waterproof ink, fine and broad tips | Mark pegs, staffs, and booking sheets for clear identification |
Marker pens improve visibility of survey points and notes, especially on wood or plastic surfaces. In a hotel site survey in Eldoret, markers helped distinguish plot corners.
Waterproof ink ensures marks persist in wet and dusty conditions. Different tip sizes allow for precision or broad markings.
Caps should be replaced immediately after use to prevent drying. Marker pens should be stored horizontally to maintain ink flow.
A panga is a machete-like tool used for clearing vegetation and preparing the survey site.
| Name | Specification | Use |
|---|---|---|
| Panga | 40cm blade, sharpened steel, wooden handle | Clear bushes, cut grass, and create access paths for surveyors |
Clearing vegetation ensures clear lines of sight for leveling and positioning instruments. For example, surveyors at a county hospital site in Kitui use pangas to open access corridors.
Proper handling techniques reduce risk of injury; gloves and protective clothing are recommended. The blade should be kept sharp to minimize effort.
Regular cleaning prevents rust and prolongs blade life. Pangas should be stored in sheathes to protect the blade and users.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covered the essential tools, equipment, and materials required for collecting original ground levels, including the level and tripod stand, levelling staff, tape, ranging rod, booking sheet, pen or pencil, eraser, calculator, pegs, mallet, marker pen, and panga. Each item plays a specific role in ensuring accurate measurement and recording during surveying. The process begins with the identification of existing control points, which serve as reference locations for establishing ground level measurements. The actual taking of ground levels involves the careful use of the levelling instrument and staff to determine the vertical heights at various points on the terrain. Accurate recording of these measurements is then done through ground levels booking, where data is systematically logged on the booking sheet for further analysis and use in engineering projects. Mastery of these steps ensures reliable and precise surveying outcomes necessary for successful construction and land development activities.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Theodolite and tripod stand | Wooden pegs |
| Ranging rods | Nylon string |
| 100 m tape measure | Chalk line |
| Wooden pegs | Foolscap paper |
| Mallet | A3 drawing paper |
| Nylon string | |
| Chalk line | |
| Technical drawing set | |
| Pencil and eraser |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Safety boots/closed shoes | 1 Pair per Candidate |
| 2 | Dust coat/overalls/reflector vest | 1 Set per Candidate |
| 3 | Theodolite and tripod stand | 1 Set per 5 Candidates |
| 4 | Ranging rods | 3 Pcs per 5 Candidates |
| 5 | 100 m tape measure | 1 Pc per Candidate |
| 6 | Wooden pegs | 3 Pcs per Candidate |
| 7 | Mallet | 1 Pc per Candidate |
| 8 | Nylon string | 1 Roll per 5 Candidates |
| 9 | Chalk line | 1 Pc per 5 Candidates |
| 10 | Technical drawing set | 1 Set per Candidate |
| 11 | Foolscap paper | 2 Sheets per Candidate |
| 12 | A3 drawing paper | 1 Sheet per Candidate |
| 13 | Pencil and eraser | 1 Set per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Identification and setting up of control points | |||
| Wears appropriate PPE before commencing work (Award 1 mark for correct use of safety boots, dust coat/reflector vest) | 1 | ||
| Correctly identifies existing control points on site (Award 1 mark per correctly identified control point, 2 points total) | 2 | ||
| Properly sets up and levels the theodolite on tripod (Award 1 mark for centering, 1 mark for levelling) | 2 | ||
| Accurately measures distances between control points using tape and ranging rods (Award 1 mark per accurate distance measurement for 2 distances) | 2 | ||
| Marks control points clearly with wooden pegs and mallet (Award 1 mark per pegged control point, 2 points total) | 2 | ||
| Uses nylon string or chalk line to visually connect control points (Award 1 mark for neat and taut string or clear chalk line between points) | 1 | ||
| Sub-Total | 10 | ||
| PRODUCT CHECKLIST | |||
| Control points marked within ±10 cm of original positions as per site layout (Award 1 mark per control point within tolerance, 3 points total) | 3 | ||
| Distances between control points measured correctly within ±0.1 m (Award 1 mark per distance measurement within tolerance, 2 points total) | 2 | ||
| Site layout plan correctly annotated with control points and measurements (Award full marks for neatness, correct labels, and completeness) | 3 | ||
| Sub-Total | 8 | ||
| GRAND TOTAL | 18 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Automatic level | Safety boots |
| Tripod stand | Dust coat or overalls |
| Measuring staff | |
| Spirit level | |
| Tape measure 30 m | |
| Adjustable spanner |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Automatic level | 1 Pc per Candidate |
| 2 | Tripod stand | 1 Pc per Candidate |
| 3 | Measuring staff (leveling rod) | 1 Pc per Candidate |
| 4 | Spirit level | 1 Pc per Candidate |
| 5 | Tape measure 30 m | 1 Pc per Candidate |
| 6 | Adjustable spanner | 1 Pc per Candidate |
| 7 | Safety boots | 1 Pair per Candidate |
| 8 | Dust coat or overalls | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Assemble and Set Up the Level and Tripod Stand | |||
| Wears appropriate PPE including safety boots and dust coat (Award 1 mark for correct PPE use) | 1 | ||
| Correctly spreads and fixes the tripod legs firmly on ground (Award 2 marks for stable and well positioned tripod) | 2 | ||
| Attaches the automatic level securely onto the tripod (Award 1 mark for proper fixation of instrument) | 1 | ||
| Centers the automatic level approximately over the survey point (Award 2 marks for accurate centering) | 2 | ||
| Levels the instrument using foot screws and spirit level bubble (Award 3 marks for correct levelling technique and bubble centered) | 3 | ||
| Checks and adjusts the horizontal crosshair for clear sighting (Award 1 mark for clear and aligned crosshair) | 1 | ||
| Ensures tripod is stable after levelling and instrument setup (Award 1 mark for stable setup without wobble) | 1 | ||
| Sub-Total | 11 | ||
| PRODUCT CHECKLIST | |||
| Level and tripod stand assembled and set up with correct centering over point within 5 cm tolerance (Award 3 marks for centering accuracy) | 3 | ||
| Instrument perfectly leveled as indicated by spirit level bubble centered (Award 4 marks for correct levelling) | 4 | ||
| Instrument securely fixed on tripod without movement (Award 2 marks for secure fixation) | 2 | ||
| Tripod legs firmly planted ensuring no instability (Award 2 marks for stable tripod legs) | 2 | ||
| Sub-Total | 11 | ||
| GRAND TOTAL | 22 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.