Land Survey  ·  Level 5
Engineering Survey 1
Chapter 2: Collect original ground levels
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Select the right tools, equipment, and materials for measuring ground levels based on the survey’s purpose.
  • Identify different types of existing control points accurately.
  • Measure ground levels precisely to meet the survey’s objectives.
  • Record ground levels clearly and correctly following non-title survey guidelines.

Mastering these skills ensures you collect reliable data that forms the foundation for successful engineering projects.

Collecting original ground levels is a fundamental activity in land surveying, especially in engineering projects where precise vertical positioning informs design and construction. This chapter focuses on the essential tools, equipment, and materials required to collect accurate ground level data in Kenya’s diverse terrain. Surveyors working in counties such as Uasin Gishu or Kisumu must be adept at selecting and handling these instruments to ensure data integrity and reliability. Mastery of these tools enables survey professionals to provide crucial inputs for infrastructure projects, land development, and environmental management.

2.1 Tools, Equipment and Materials

The accuracy of ground level data depends heavily on the quality and suitability of the tools and materials used in the field. Surveyors must be familiar with each item’s specifications, proper usage, and maintenance to achieve consistent results. In Kenyan land surveying practice, these tools range from optical instruments to simple hand tools, each playing a distinct role in the process.

2.1.1 Level and Tripod Stand with Oral

Name Specification Use
Automatic Level 24x magnification, ±0.5mm per km accuracy Measure height differences by sighting staff readings
Adjustable Tripod Lightweight aluminum, adjustable legs up to 1.5m Support and stabilize the level on uneven ground
Spirit Vial (Oral) Bubble vial attached to level for horizontal alignment Confirm horizontal positioning of the level before use

Importance of Level Accuracy

The level’s precision directly affects the reliability of ground level data. Inaccurate levels can cause cumulative errors in height measurements, leading to flawed engineering designs. For example, at a county government construction site in Kisii, poor leveling could result in drainage systems that fail to function properly.

Setup and Adjustment of Tripod and Level

Proper setup involves extending tripod legs to a stable height and ensuring the head is roughly level before mounting the instrument. The level is then attached securely, and the oral is checked to confirm horizontal alignment. Adjusting foot screws fine-tunes the position to achieve perfect leveling.

Maintenance and Calibration of the Level

Regular maintenance includes cleaning lenses, checking the optical plummet, and verifying calibration against known benchmarks. Calibration should be conducted annually or after any significant shock to the instrument. For instance, surveyors at Nairobi Water Company routinely calibrate their levels to maintain accuracy in water pipeline installations.

2.1.2 Levelling Staff

The levelling staff is a graduated rod used to measure the vertical distance from the instrument’s line of sight to the ground. It is typically made of wood, aluminum, or fiberglass and features clear graduations in meters and centimeters.

Name Specification Use
Telescopic Staff Extendable up to 5 meters, graduated in centimeters Measure vertical height differences from level sight line
Wooden Staff Fixed length 3 meters, painted with black and white bands Used for quick approximate readings on flat terrain

Types of Levelling Staff

Common types include the invar staff for high precision, the aluminium telescopic staff for portability, and the wooden staff for rugged conditions. Each type suits different surveying environments; for example, an aluminium telescopic staff is preferred in urban surveys for ease of transport.

Reading and Handling the Levelling Staff

The surveyor or assistant holds the staff vertically on the point being measured while the instrument operator sights through the telescope. Proper vertical alignment is critical to avoid parallax errors. In a farm survey in Meru County, correct staff handling ensures accurate contour mapping for irrigation planning.

Care and Storage of the Staff

Levelling staffs should be kept clean-free of dents, and stored in protective cases to prevent damage. Exposure to harsh sunlight or moisture can cause warping or fading of graduations, compromising accuracy. Surveyors at county offices in Nakuru emphasize routine inspection and cleaning after fieldwork.

2.1.3 Tape

Measuring tapes are essential for determining horizontal distances and offsets during leveling surveys. The tapes are usually made of steel or fiberglass, with metric graduations.

Name Specification Use
Steel Tape 30m length, metric graduations, durable coating Measure horizontal distances accurately on various terrain
Fiberglass Tape 30m length, flexible, resistant to stretching Used in rough terrain where steel tape may be damaged

Importance of Tape Accuracy

Precision in length measurement affects the calculation of reduced levels. Stretching or damage to the tape can lead to systematic errors. For example, in the survey of a school compound in Kisumu, inaccurate tapes could distort site layout plans.

Techniques for Correct Tape Usage

The tape must be pulled taut and kept straight without sagging. Readings should be taken at eye level to avoid parallax errors. It is advisable to use a plumb bob to mark points vertically when measuring offsets.

Maintenance and Storage

Tapes should be cleaned regularly, wiped dry after use, and stored in cases to prevent rust or stretching. Surveyors in Nairobi County routinely inspect tapes for kinks and replace worn-out tapes promptly.

2.1.4 Ranging Rod

Ranging rods are tall, brightly colored poles used to mark points and establish straight lines during surveys. They improve visibility over long distances.

Name Specification Use
Fiberglass Ranging Rod 2m length, alternating red and white bands, collapsible Mark survey points and assist in line ranging
Wooden Ranging Rod 2m length, painted with bright colors Used in rough terrain where durability is essential

Role in Survey Accuracy

Ranging rods help surveyors establish accurate straight lines between points, which is crucial in traversing and leveling. In a county road project in Machakos, proper use of ranging rods ensured alignment of the road profile.

Visibility and Placement

The alternating bands of red and white enhance visibility in varied lighting and vegetation conditions. Placement at eye level of the instrument operator allows precise sighting.

Handling and Maintenance

Ranging rods should be handled carefully to avoid bending and kept clean for visibility. Storage in protective sleeves prevents damage during transport.

2.1.5 Booking Sheet

A booking sheet is a standardized form used to record field measurements and observations systematically during surveying operations.

Name Specification Use
Survey Booking Sheet Pre-printed columns for station, backsight, foresight, reduced level Record leveling data for later computation and verification

Structure and Content of Booking Sheets

Booking sheets typically include columns for instrument stations, backsight (BS), foresight (FS), intermediate sights (IS), and calculated reduced levels (RL). Properly filled sheets facilitate error checking and data processing.

Importance of Accurate Record-Keeping

Accurate and legible entries prevent errors during data reduction. In a hotel site survey in Kisii, well-maintained booking sheets enabled swift verification of ground contours.

Handling and Storage of Booking Sheets

Booking sheets should be protected from moisture and physical damage during fieldwork. Digital backups are increasingly used alongside paper forms in county government offices.

2.1.6 Pen/Pencil

Writing instruments are necessary for recording measurements and making notes during surveys.

Name Specification Use
Ballpoint Pen Blue or black ink, waterproof Permanent recording on booking sheets
Mechanical Pencil 0.5mm lead, refillable Used for sketching and temporary notes

Choosing Appropriate Writing Instruments

Pens with waterproof ink prevent smudging and loss of data in wet conditions. Pencils allow for corrections but can fade or smudge.

Usage in Field Conditions

Surveyors often carry both pen and pencil to balance permanence and flexibility. For example, at a cooperative farm survey in Meru, pencils are used for initial sketches before final entries in pen.

Maintenance and Replacement

Writing instruments should be checked daily, with spares carried to avoid interruption. Keeping pens capped and pencils sharpened preserves functionality.

2.1.7 Eraser

An eraser is used to correct pencil errors on booking sheets or sketches.

Name Specification Use
Rubber Eraser Soft, non-abrasive material Remove pencil marks cleanly without damaging paper

Importance in Data Accuracy

Erasing mistakes cleanly prevents confusion and maintains legibility. In a county health facility survey, clean corrections ensured reliable data transfer.

Proper Use of Erasers

Applying gentle pressure avoids tearing paper or smudging adjacent text. Erasers should be clean and free from grit.

Storage and Replacement

Erasers should be kept in pencil cases to avoid dirt contamination. Survey teams in Nairobi schools often keep multiple erasers for fieldwork.

2.1.8 Calculator

Calculators assist in performing quick and accurate arithmetic operations during field computations.

Name Specification Use
Scientific Calculator Basic scientific functions, solar powered or battery operated Compute reduced levels and other survey calculations

Significance of Calculators in Surveying

Fast and accurate calculations reduce errors and increase efficiency in data processing. Surveyors at a retail business site in Nakuru rely on calculators for on-site computations.

Features to Consider

A calculator with memory functions and solar power reduces dependency on batteries and supports complex computations. Durability and portability are also key.

Usage and Care

Calculators should be protected from dust and moisture. Surveyors should verify results manually to catch potential input errors.

2.1.9 Pegs

Pegs are used to mark surveyed points on the ground, providing physical reference during and after data collection.

Name Specification Use
Wooden Pegs 30cm length, pointed end, durable hardwood Mark ground points for reference and future identification

Role in Survey Accuracy

Pegs provide a tangible reference that can be revisited for verification or further work. For example, in a county government housing project, pegs marked plot corners for contractors.

Selection and Placement

Pegs should be sturdy enough to withstand environmental conditions and placed firmly in the ground at surveyed points.

Maintenance and Retrieval

Survey teams retrieve pegs after project completion or replace damaged ones during extended surveys. Proper storage ensures pegs remain intact for reuse.

2.1.10 Mallet

A mallet is a tool used to drive pegs into the ground without damaging them.

Name Specification Use
Wooden Mallet 500g weight, hardwood head and handle Drive pegs securely into hard or compacted soil

Importance of Using a Mallet

Using a mallet prevents splitting or breaking pegs and ensures they are driven to the correct depth. At agricultural cooperative surveys in Bungoma, mallets help set pegs firmly in rocky soils.

Proper Handling Techniques

The mallet should be swung with controlled force to avoid injury and equipment damage. Surveyors must wear gloves for grip and protection.

Maintenance of Mallets

Mallets should be inspected for cracks and cleaned after use. Wooden mallets benefit from occasional oiling to prevent drying and splitting.

2.1.11 Marker Pen

Marker pens are used to make visible marks on pegs, staffs, or other surfaces for identification.

Name Specification Use
Permanent Marker Waterproof ink, fine and broad tips Mark pegs, staffs, and booking sheets for clear identification

Uses in Field Marking

Marker pens improve visibility of survey points and notes, especially on wood or plastic surfaces. In a hotel site survey in Eldoret, markers helped distinguish plot corners.

Choosing the Right Marker

Waterproof ink ensures marks persist in wet and dusty conditions. Different tip sizes allow for precision or broad markings.

Care and Storage

Caps should be replaced immediately after use to prevent drying. Marker pens should be stored horizontally to maintain ink flow.

2.1.12 Panga

A panga is a machete-like tool used for clearing vegetation and preparing the survey site.

Name Specification Use
Panga 40cm blade, sharpened steel, wooden handle Clear bushes, cut grass, and create access paths for surveyors

Role in Survey Preparation

Clearing vegetation ensures clear lines of sight for leveling and positioning instruments. For example, surveyors at a county hospital site in Kitui use pangas to open access corridors.

Safety and Handling

Proper handling techniques reduce risk of injury; gloves and protective clothing are recommended. The blade should be kept sharp to minimize effort.

Maintenance and Storage

Regular cleaning prevents rust and prolongs blade life. Pangas should be stored in sheathes to protect the blade and users.

Practice Questions

  1. Explain the role of the level and tripod stand in collecting ground levels and describe how to properly set them up in the field. (10 marks)
  2. Discuss the different types of levelling staffs and their suitability for various surveying environments. (8 marks)
  3. Describe the maintenance practices necessary for surveying tapes to ensure accuracy over time. (6 marks)
  4. Outline the importance of booking sheets in leveling surveys and list five critical pieces of information recorded on them. (10 marks)
  5. Explain how a panga is used in surveying and why proper maintenance is essential for fieldwork efficiency. (6 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Identification of Existing Control Points

In land surveying, accurately identifying existing control points is critical for establishing a reliable framework for further measurements. In Kenya, surveyors working on projects such as county infrastructure planning or agricultural land subdivision depend…

🔒2.3 Ground Levels Taking

Measuring ground levels accurately is a fundamental task in land surveying that informs design, construction, and land management decisions. In Kenya, precise ground level data supports infrastructure projects such as road construction, drainage system design,…

🔒2.4 Ground levels booking

In land surveying, recording ground levels accurately is crucial for producing reliable survey data that informs design, construction, and land management decisions. Ground levels booking refers to the systematic documentation of instrument readings and calcul…

Chapter Summary

This chapter covered the essential tools, equipment, and materials required for collecting original ground levels, including the level and tripod stand, levelling staff, tape, ranging rod, booking sheet, pen or pencil, eraser, calculator, pegs, mallet, marker pen, and panga. Each item plays a specific role in ensuring accurate measurement and recording during surveying. The process begins with the identification of existing control points, which serve as reference locations for establishing ground level measurements. The actual taking of ground levels involves the careful use of the levelling instrument and staff to determine the vertical heights at various points on the terrain. Accurate recording of these measurements is then done through ground levels booking, where data is systematically logged on the booking sheet for further analysis and use in engineering projects. Mastery of these steps ensures reliable and precise surveying outcomes necessary for successful construction and land development activities.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of a levelling staff in land surveying? (2 marks)
  2. Identify three key features of an effective booking sheet used in ground level recording. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe the purpose of a levelling staff in the process of collecting original ground levels in land surveying. (4 marks)
  2. Explain why a tripod stand is essential when using a level instrument during ground level measurement. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify and set up existing control points on site

Land Survey · Level 5
Engineering Survey 1
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Locate and mark three existing control points within a 50 m by 50 m site area using theodolite, tape measure, and ranging rods as per the provided site layout.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Theodolite and tripod standWooden pegs
Ranging rodsNylon string
100 m tape measureChalk line
Wooden pegsFoolscap paper
MalletA3 drawing paper
Nylon string
Chalk line
Technical drawing set
Pencil and eraser
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Safety boots/closed shoes1 Pair per Candidate
2Dust coat/overalls/reflector vest1 Set per Candidate
3Theodolite and tripod stand1 Set per 5 Candidates
4Ranging rods3 Pcs per 5 Candidates
5100 m tape measure1 Pc per Candidate
6Wooden pegs3 Pcs per Candidate
7Mallet1 Pc per Candidate
8Nylon string1 Roll per 5 Candidates
9Chalk line1 Pc per 5 Candidates
10Technical drawing set1 Set per Candidate
11Foolscap paper2 Sheets per Candidate
12A3 drawing paper1 Sheet per Candidate
13Pencil and eraser1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Identification and setting up of control points
Wears appropriate PPE before commencing work
(Award 1 mark for correct use of safety boots, dust coat/reflector vest)
1
Correctly identifies existing control points on site
(Award 1 mark per correctly identified control point, 2 points total)
2
Properly sets up and levels the theodolite on tripod
(Award 1 mark for centering, 1 mark for levelling)
2
Accurately measures distances between control points using tape and ranging rods
(Award 1 mark per accurate distance measurement for 2 distances)
2
Marks control points clearly with wooden pegs and mallet
(Award 1 mark per pegged control point, 2 points total)
2
Uses nylon string or chalk line to visually connect control points
(Award 1 mark for neat and taut string or clear chalk line between points)
1
Sub-Total10
PRODUCT CHECKLIST
Control points marked within ±10 cm of original positions as per site layout
(Award 1 mark per control point within tolerance, 3 points total)
3
Distances between control points measured correctly within ±0.1 m
(Award 1 mark per distance measurement within tolerance, 2 points total)
2
Site layout plan correctly annotated with control points and measurements
(Award full marks for neatness, correct labels, and completeness)
3
Sub-Total8
GRAND TOTAL18
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Assemble and Set Up Level and Tripod Stand for Ground Level Surveying

Land Survey · Level 5
Engineering Survey 1
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Assemble and set up the automatic level on the tripod stand ensuring correct centering and levelling for ground level surveying.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Automatic levelSafety boots
Tripod standDust coat or overalls
Measuring staff
Spirit level
Tape measure 30 m
Adjustable spanner
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Automatic level1 Pc per Candidate
2Tripod stand1 Pc per Candidate
3Measuring staff (leveling rod)1 Pc per Candidate
4Spirit level1 Pc per Candidate
5Tape measure 30 m1 Pc per Candidate
6Adjustable spanner1 Pc per Candidate
7Safety boots1 Pair per Candidate
8Dust coat or overalls1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Assemble and Set Up the Level and Tripod Stand
Wears appropriate PPE including safety boots and dust coat
(Award 1 mark for correct PPE use)
1
Correctly spreads and fixes the tripod legs firmly on ground
(Award 2 marks for stable and well positioned tripod)
2
Attaches the automatic level securely onto the tripod
(Award 1 mark for proper fixation of instrument)
1
Centers the automatic level approximately over the survey point
(Award 2 marks for accurate centering)
2
Levels the instrument using foot screws and spirit level bubble
(Award 3 marks for correct levelling technique and bubble centered)
3
Checks and adjusts the horizontal crosshair for clear sighting
(Award 1 mark for clear and aligned crosshair)
1
Ensures tripod is stable after levelling and instrument setup
(Award 1 mark for stable setup without wobble)
1
Sub-Total11
PRODUCT CHECKLIST
Level and tripod stand assembled and set up with correct centering over point within 5 cm tolerance
(Award 3 marks for centering accuracy)
3
Instrument perfectly leveled as indicated by spirit level bubble centered
(Award 4 marks for correct levelling)
4
Instrument securely fixed on tripod without movement
(Award 2 marks for secure fixation)
2
Tripod legs firmly planted ensuring no instability
(Award 2 marks for stable tripod legs)
2
Sub-Total11
GRAND TOTAL22
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Use levelling staff to take ground level measurementsPractical 3
🔒Measure horizontal distances on site using a 30 m tapePractical 4
🔒Use ranging rods to establish a straight alignment and sighting for ground level collectionPractical 5
🔒Record Ground Levels in Booking SheetPractical 6
🔒Calculate reduced levels from recorded ground level measurementsPractical 7
🔒Marking and pegging original ground level pointsPractical 8
🔒Clearing vegetation for survey area using a pangaPractical 9
🔒Set out and level a 50m profile line with ground levelsPractical 10
🔒Prepare a complete booking sheet with ground level calculationsPractical 11
🔒Set up and use a level instrument for differential levelling between two pointsPractical 12
🔒Mark and identify control points with marker penPractical 13
🔒Measure offsets from baseline using ranging rods and tapePractical 14
🔒Maintenance and Handling of Surveying InstrumentsPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 20 questions Start quiz ▾
0%
0 / 2
🔒

18 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Select the right tools, equipment, and materials for measuring ground levels based on the survey’s purpose.
  • Identify different types of existing control points accurately.
  • Measure ground levels precisely to meet the survey’s objectives.
  • Record ground levels clearly and correctly following non-title survey guidelines.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.