4.1 Modification of drawings
Modification of drawings is the process of changing existing drawings to reflect new information, correct errors or develop the design further. Drawings are rarely right the first time: clients change their minds, site measurements reveal differences, budgets are cut, regulations require adjustments and the design itself improves as it develops. In CAD, modification is fast and clean compared with erasing and redrawing on paper, but it must be controlled so that every affected drawing is updated and no one builds from outdated information. Example: after reviewing the first layout of a furniture showroom, the owner asks for a larger display area near the entrance, so the designer moves two partitions, rearranges the display units and updates the floor plan, the ceiling plan and the elevations that show the moved partitions.
4.1.1 Reasons for modifying drawings
Changes come from many sources at every stage of a project. Understanding why a change is needed helps the designer judge its effect on cost, time and other drawings. Example: a chama investment group building rental flats asks for a second bathroom in each two-bedroom unit, which affects plans, plumbing layouts and the bill of quantities.
Common reasons
- Client requests: The client changes requirements, adds spaces or prefers different finishes after seeing the first proposals.
- Site conditions: Measurements on site differ from the original drawings, or hidden columns, pipes or beams are discovered.
- Design development: The designer refines the layout, details or finishes as the design progresses.
- Errors and omissions: Mistakes in dimensions, missing items or clashes between elements are found during checking.
- Regulatory requirements: Approving authorities or fire officers require changes to exits, accessibility or fire safety.
- Budget changes: Costs exceed the budget and materials or features must be changed or removed.
- Consultant coordination: Structural, electrical or mechanical consultants need space or positions changed for their services.
- Supplier information: Actual product sizes differ from the assumed sizes used in the drawings.
4.1.2 Types of modifications
Modifications range from small changes in a note to major changes in layout. Classifying the change helps decide which drawings must be updated and how much checking is needed. Example: changing the tile colour in a pharmaceutical distributor's warehouse office is a minor annotation change, while relocating its toilets is a major layout change affecting several disciplines.
| Type of modification |
Examples |
Drawings usually affected |
| Geometric |
Moving walls, resizing rooms, changing door positions |
Plans, elevations, sections and details |
| Content |
Adding or removing furniture, fittings or equipment |
Plans, elevations and schedules |
| Property |
Changing layers, line types, colours or hatch patterns |
The drawing being edited |
| Annotation |
Correcting dimensions, notes, room names or tags |
The drawing being edited and related schedules |
| Specification |
Changing materials, finishes or products |
Finishes plans, details and schedules |
| Presentation |
Changing sheet layout, viewport scale or title block details |
Printed sheets |
4.1.3 Receiving and recording change requests
Every change should be received in writing and recorded before work begins, so that there is a clear record of who asked for what and when. This protects the designer if disputes arise over cost or time. Example: a Montessori school's director sends marked-up PDFs showing where she wants extra storage, and the designer logs each comment in a change register before editing.
Ways changes are communicated
- Marked-up prints: Changes sketched or written on printed drawings by the client or consultant.
- Marked-up PDFs: Comments, clouds and sketches added digitally to PDF drawings.
- Meeting minutes: Changes agreed in design meetings and recorded in the minutes.
- Emails and letters: Written instructions from the client or project manager.
- Site instructions: Formal instructions issued during construction to deal with site conditions.
- Change request forms: Standard forms describing the change, reason, requester and approval.
Information recorded for each change
- Change reference number: A unique number used to track the change.
- Description of the change: What is to be changed and where.
- Reason for the change: Why the change is required.
- Requested by and date: Who asked for the change and when.
- Drawings affected: The list of drawings that must be updated.
- Approval status: Whether the change has been approved, especially if it affects cost or time.
4.1.4 Procedure for modifying drawings
Modifications should follow an orderly procedure so that nothing is missed and earlier versions remain available. Example: an animal feeds factory's office refurbishment designer saves a copy of each drawing before changing the canteen layout, so the original can be shown if the client asks to compare.
- Review the change request: Read the instruction carefully and clarify anything unclear with the person who requested it.
- Assess the impact: Identify all drawings, schedules and consultants affected and any effect on cost or programme.
- Obtain approval where needed: Confirm the change with the client if it affects cost, time or other parties.
- Preserve the current version: Save or archive the current drawing before editing so the previous state can be recovered.
- Make the changes in the model: Edit geometry, content and properties in the drawing files.
- Update related drawings: Carry the change through to plans, elevations, sections, details and schedules that show the same element.
- Update annotation: Correct dimensions, tags, notes and room names affected by the change.
- Check the modified drawings: Compare against the change request and check for new clashes or errors.
- Record the change: Update the change register and prepare the drawings for formal issue.
Impact checks after a modification
- Dimensions: Overall and room dimensions still add up correctly.
- Clearances: Circulation and door swings remain clear.
- Services: Sockets, lights and plumbing positions still suit the new layout.
- Consistency across views: Plans, elevations and sections show the same arrangement.
- Schedules: Door, finish and furniture schedules match the changed drawings.
- Regulations: Exits, accessibility and fire requirements are still met.
Worked example: change in floor area after moving a partition
Change in area = distance moved × length of partition
A partition 4.5 m long in a flower farm's pack-house office is moved 0.8 m to enlarge the manager's office.
Change in area = 0.8 × 4.5
Change in area = 3.6 m², added to the manager's office and taken from the open office
Worked example: cost of a client change
Cost of change = quantity changed × unit rate
A client asks to replace 42 m² of vinyl flooring with porcelain tiles. Vinyl costs Ksh 1,800 per m² and porcelain tiles Ksh 3,200 per m², both installed.
Difference in rate = 3,200 − 1,800 = Ksh 1,400 per m²
Cost of change = 42 × 1,400
Cost of change = Ksh 58,800 extra
The rest of this chapter
🔒Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free account 🔒4.2 Modification tools and commands application
Modification tools and commands are the CAD functions used to change objects that already exist in a drawing: moving, copying, rotating, resizing, reshaping, repeating and changing their properties. Applying them well means choosing the right command for each…
🔒4.3 Design proposed concepts
Designing proposed concepts is the stage where the designer turns the client's brief and the site information into one or more clear design ideas and presents them in drawings and visuals for the client to choose from. A concept sets the overall direction of t…
🔒4.4 Revision of drawings
Revision of drawings is the formal process of recording, identifying and issuing changes made to drawings that have already been shared with others. While modification is the act of changing the drawing, revision is the control system around it: every issued c…