Industrial Mechatronics Technology  ·  Level 6
Supervisory Control And Data Acquisition Systems
Chapter 2: Mount SCADA system components
📚 9 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Apply health and safety procedures correctly throughout the SCADA system installation.
  • Select the right SCADA system installation tools based on the job requirements.
  • Prepare SCADA system installation cabinets following the manufacturer’s specifications.
  • Fit SCADA components accurately according to the job requirements.
  • Carry out SCADA system wiring safely and correctly following IEEE regulations.

Mastering these skills ensures you install SCADA systems safely and efficiently, which is essential for reliable and effective industrial control.

Supervisory Control and Data Acquisition (SCADA) systems are central to modern industrial mechatronics, enabling remote monitoring and control of complex processes. Proper mounting and installation of SCADA hardware require strict adherence to health and safety protocols to protect personnel and equipment. This chapter focuses on the key health and safety components involved in mounting SCADA systems within industrial mechatronics environments in Kenya, emphasizing practical guidelines and standards critical for safe and efficient operation.

2.1 Health and Safety System

In industrial mechatronics settings such as automated manufacturing plants or water treatment facilities, health and safety systems are vital to prevent accidents and ensure compliance with Kenyan occupational safety laws. SCADA system installation and maintenance involve risks including electrical hazards, mechanical injuries, and environmental impacts. This section covers personal protective equipment, work permits, waste management, electrical wiring protocols, warning signage, barricading, and high voltage signage essential for SCADA hardware mounting.

2.1.1 PPEs Components

Personal Protective Equipment (PPE) is the frontline defense for technicians and engineers working on SCADA hardware, particularly when dealing with electrical panels, mounting structures, or wiring tasks.

Types of PPE Used in SCADA Mounting

  • Safety Helmets: Protect against falling objects or accidental head bumps during hardware installation on poles or control rooms.
  • Insulated Gloves: Provide electrical insulation when handling live wires or testing electrical components.
  • Safety Goggles: Shield eyes from sparks, dust, or debris generated during drilling or fixing hardware enclosures.
  • Protective Footwear: Safety boots with steel toes prevent foot injuries from heavy equipment or sharp objects on site.
  • High-Visibility Clothing: Ensures workers are easily seen in busy industrial environments, reducing collision risks.

Selection Criteria for PPE

  • Compliance with KEBS Standards: PPE must meet Kenya Bureau of Standards (KEBS) regulations to guarantee quality and safety.
  • Task Specificity: PPE chosen depends on the nature of the task; electrical work requires dielectric gloves, while mechanical mounting needs impact-resistant helmets.
  • Comfort and Fit: Proper fit is crucial to avoid discomfort that might lead to non-compliance or accidents.
  • Durability: PPE should withstand harsh environmental conditions typical in industrial mechatronics sites.
  • Maintenance Requirements: PPE must be easy to clean and maintain to ensure long-term usability.

Proper Usage and Maintenance of PPE

  • Inspection Before Use: Check for cracks, tears, or electrical insulation degradation before starting work.
  • Correct Wearing Procedures: Gloves should cover wrists fully; helmets must be securely fastened.
  • Cleaning and Storage: Use manufacturer-recommended cleaning methods and store PPE in dry, dust-free areas.
  • Regular Replacement: Replace PPE immediately if damaged or after expiry date to maintain effectiveness.
  • Training: Workers must be trained on correct PPE usage and limitations to maximize protection.

PPE Limitations and Risks of Non-Compliance

  • False Sense of Security: PPE reduces risk but does not eliminate hazards; safe work practices remain essential.
  • Inadequate Protection: Using wrong or damaged PPE can increase injury risk.
  • Legal Consequences: Failure to provide or use PPE can lead to penalties under the Occupational Safety and Health Act, 2007.
  • Reduced Productivity: Discomfort from poor-quality PPE may lead to reduced work efficiency.
  • Accident Severity: Lack of proper PPE increases the severity of injuries during incidents.

2.1.2 Work Permits

Work permits regulate hazardous activities during SCADA system installation or maintenance to ensure authorized, safe operations.

Purpose of Work Permits

  • Hazard Identification: Identifies specific risks related to the task such as electrical shock or confined space entry.
  • Authorization Control: Ensures only qualified personnel perform high-risk activities.
  • Communication Tool: Provides clear instructions and safety measures to all involved parties.
  • Documentation: Records safety precautions and approvals for accountability.
  • Emergency Preparedness: Specifies emergency contacts and procedures in case of incidents.

Types of Work Permits Relevant to SCADA Installation

  • Electrical Work Permit: Required for wiring, panel installation, or testing live circuits.
  • Hot Work Permit: For tasks involving welding or cutting near SCADA enclosures.
  • Confined Space Entry Permit: When mounting hardware inside tanks or restricted areas.
  • Height Work Permit: For installing SCADA components on poles or elevated platforms.
  • Lockout/Tagout Permit: Controls energy sources during maintenance to prevent accidental energizing.

Procedures for Issuing and Managing Work Permits

  1. Risk Assessment: Identify hazards and determine necessary control measures.
  2. Permit Application: Technician submits a detailed request including task description and hazards.
  3. Permit Approval: Safety officer reviews and authorizes the permit, specifying conditions.
  4. Pre-Work Briefing: All personnel involved are briefed on safety requirements and emergency actions.
  5. Permit Display: Permit is displayed visibly at the worksite during the task.
  6. Closure and Review: Upon task completion, the permit is signed off and archived for future reference.

Consequences of Non-Adherence to Work Permit Systems

  • Increased Accident Risk: Unauthorized work leads to uncontrolled hazards.
  • Legal Liability: Violations attract fines or shutdowns by regulatory bodies.
  • Damage to Equipment: Improper procedures can destroy sensitive SCADA components.
  • Loss of Reputation: Companies known for poor safety compliance lose client trust.
  • Operational Downtime: Incidents cause production delays and financial losses.

2.1.3 Waste Management

Proper management of waste generated during SCADA system mounting prevents environmental contamination and promotes workplace safety.

Types of Waste Generated

  • Electrical Waste: Discarded wires, cables, and damaged electronic components.
  • Packaging Materials: Plastic wraps, cardboard boxes, and foam used for hardware protection.
  • Construction Debris: Metal scraps, drill dust, and mounting brackets.
  • Chemical Waste: Lubricants, cleaning solvents, or adhesives used in installation.
  • General Waste: Food wrappers or personal protective equipment disposables.

Waste Segregation and Disposal Methods

  • Segregation at Source: Separate waste into electrical, chemical, and general categories.
  • Recycling: Copper wires and metal scraps should be sent to certified recyclers.
  • Safe Disposal of Chemicals: Use designated containers for solvents and oils to prevent soil contamination.
  • Disposal of E-Waste: Follow NEMA guidelines for hazardous electronic waste handling.
  • General Waste Collection: Use covered bins to avoid littering and pest attraction.

Environmental and Regulatory Compliance

  • NEMA Regulations: Adhere to National Environment Management Authority waste management standards.
  • County Waste Bylaws: Comply with local government waste disposal rules.
  • Hazardous Waste Permits: Obtain permits for handling and transporting hazardous waste.
  • Environmental Impact Assessment: Conduct assessments before large-scale SCADA projects.
  • Worker Training: Educate personnel on proper waste handling to minimize environmental risks.

Benefits of Effective Waste Management

  • Workplace Safety: Reduces trip hazards and exposure to harmful substances.
  • Environmental Protection: Prevents pollution of soil and water bodies.
  • Cost Savings: Recycling reduces material costs and disposal fees.
  • Regulatory Compliance: Avoids penalties and project delays.
  • Corporate Social Responsibility: Enhances company image among stakeholders.

2.1.4 Electrical Wiring Colour Coding

Correct electrical wiring colour coding is crucial for safe and effective SCADA hardware installation, facilitating maintenance and fault diagnosis.

Standard Colour Codes in Kenya

  • Live (Phase) Wires: Red for single-phase, brown for three-phase systems.
  • Neutral Wires: Black or blue, depending on system conventions.
  • Earth (Ground) Wires: Green with yellow stripes.
  • Control Wiring: Orange or white for control circuits.
  • DC Circuits: Red for positive and black for negative terminals.

Importance of Colour Coding

  • Safety: Prevents accidental contact with live wires.
  • Ease of Maintenance: Technicians quickly identify circuits during troubleshooting.
  • Compliance: Meets Kenya Electricity Generating Company (KenGen) and KEBS standards.
  • Standardisation: Facilitates interoperability across equipment and sites.
  • Error Reduction: Minimizes wiring mistakes during installation or repairs.

Procedures for Implementing Colour Coding

  1. Plan Wiring Layout: Define circuits and assign colour codes before installation.
  2. Source Certified Cables: Use cables with factory-applied colour insulation.
  3. Labeling: Supplement colour coding with clear labels or markers.
  4. Documentation: Maintain updated wiring diagrams reflecting colour codes.
  5. Training: Ensure all electricians and technicians understand the colour scheme.
  6. Inspection: Perform post-installation checks to verify colour code adherence.

Common Colour Coding Errors and Prevention

  • Colour Mixing: Using non-standard colours can cause confusion.
  • Faded Colours: Exposure to sunlight or heat can degrade insulation colour.
  • Incorrect Connections: Misinterpreting colour codes leads to wiring faults.
  • Lack of Labels: Colour alone may be insufficient in complex systems.
  • Non-Compliance: Using cables without KEBS certification risks safety.

2.1.5 Danger Warning Signage

Warning signs alert personnel to electrical and mechanical hazards associated with SCADA equipment, preventing accidents.

Types of Danger Warning Signs

  • High Voltage Signs: Indicate presence of live electrical components.
  • Electrical Shock Hazard: Warns of risk of electrocution.
  • No Unauthorized Access: Restricts entry to SCADA control rooms or panels.
  • Personal Protective Equipment Required: Indicates mandatory PPE use.
  • General Danger Signs: Alert to mechanical hazards like moving parts.

Design and Placement of Signage

  • Visibility: Signs must be placed at eye level and illuminated if necessary.
  • Durability: Use weather-resistant materials for outdoor installations.
  • Standard Symbols: Employ ISO 7010 compliant pictograms for universal understanding.
  • Multilingual Text: Include Kiswahili and English for broader comprehension.
  • Proximity: Place signs near hazard sources, including entry points and mounting structures.

Regulatory Requirements for Signage

  • Occupational Safety and Health Act: Mandates clear hazard communication.
  • KEBS Standards: Specifies size, colour, and format of safety signs.
  • NEMA Guidelines: Require environmental hazard warnings where applicable.
  • Periodic Inspection: Signs must be checked regularly for legibility and condition.
  • Worker Training: Personnel should understand signage meanings and actions required.

Impact of Warning Signs on Safety Culture

  • Accident Reduction: Early hazard identification prevents injuries.
  • Compliance Reinforcement: Visible signs remind workers of safety protocols.
  • Emergency Preparedness: Signs guide safe evacuation routes.
  • Behavioral Influence: Promote cautious and responsible conduct.
  • Legal Protection: Demonstrate employer’s commitment to safety standards.

2.1.6 Barricades

Barricades physically restrict access to hazardous areas during SCADA system installation or maintenance, protecting workers and the public.

Types of Barricades Used

  • Physical Barriers: Metal or plastic fences around electrical panels or excavation sites.
  • Warning Tape: Brightly coloured tape to cordon off dangerous zones temporarily.
  • Safety Cones: Used to mark off walkways or alert to trip hazards.
  • Fixed Barriers: Permanent enclosures for sensitive SCADA hardware.
  • Retractable Barricades: Flexible barriers for adjustable access control.

Criteria for Effective Barricading

  • Height and Strength: Barricades must be tall and sturdy enough to prevent entry.
  • Visibility: Use fluorescent colours and reflective materials for low-light conditions.
  • Signage Integration: Attach warning signs to barricades for hazard identification.
  • Access Control: Provide secure gates or locks where necessary.
  • Compliance with Standards: Follow KEBS and OSHA guidelines on barricade specifications.

Installation Procedures for Barricades

  1. Site Assessment: Identify hazard zones needing barricading.
  2. Material Selection: Choose appropriate barricade type based on hazard severity.
  3. Marking Boundaries: Clearly define the perimeter for installation.
  4. Erection: Install barricades ensuring stability and visibility.
  5. Sign Installation: Attach relevant warning signs on barricades.
  6. Inspection and Maintenance: Regularly check barricades for damage or displacement.

Challenges and Solutions in Barricading SCADA Sites

Challenges
  • Limited Space: Congested industrial sites may restrict barricade placement.
  • Unauthorized Removal: Barricades may be moved or ignored by untrained personnel.
  • Weather Damage: Outdoor barricades exposed to wind or rain degrade quickly.
  • Inadequate Visibility: Poor lighting reduces effectiveness of barriers.
  • Cost Constraints: High-quality barricades may be expensive for small firms.
Solutions
  • Compact Barricade Designs: Use space-saving barriers for tight areas.
  • Staff Training: Educate workers on importance of maintaining barricades.
  • Durable Materials: Invest in weather-resistant barricades.
  • Supplementary Lighting: Install portable lights near barricades.
  • Budget Planning: Allocate funds for essential safety equipment in project budgets.

2.1.7 High Voltage Signage SCADA Hardware Mounting

High voltage signage is critical when mounting SCADA hardware connected to or near high voltage electrical systems, ensuring clear hazard communication.

Importance of High Voltage Signage

  • Prevents Electrocution: Alerts personnel to the presence of dangerous voltage levels.
  • Regulatory Compliance: Fulfils requirements of the Energy Act and Occupational Safety and Health Act.
  • Protects Equipment: Discourages unauthorized access that could cause damage.
  • Emergency Response: Assists first responders in hazard identification during incidents.
  • Public Awareness: Warns visitors or passersby in industrial or public utility sites.

Specifications for High Voltage Signs

Name Specification Use
High Voltage Danger Yellow background, black lightning symbol, minimum size 150x150 mm Mounted on SCADA control panels and near high voltage cables
Electrical Hazard Red border, white background, black text Used inside control rooms and panel doors
No Unauthorized Entry Red circle with diagonal line over a person symbol Positioned at site entry points
  • Signs must be weatherproof and UV resistant.
  • Use reflective materials for visibility at night.
  • Include text in English and Kiswahili.

Placement Guidelines for High Voltage Signage

  • Proximity: Place signs at all entry points to high voltage areas.
  • Height: Mount signs at eye level, approximately 1.5 meters above ground.
  • Repetition: Install multiple signs along access routes for continuous warning.
  • Visibility: Avoid obstructions such as equipment or vegetation.
  • Maintenance: Regularly clean and replace faded or damaged signs.

Installation Procedure for High Voltage Signage on SCADA Hardware

  1. Site Survey: Identify all areas and equipment requiring high voltage signage.
  2. Select Appropriate Signage: Choose signs matching voltage levels and hazard types.
  3. Prepare Mounting Surface: Clean and smooth the panel or wall surface.
  4. Fix Signs Securely: Use screws or industrial adhesives to mount signs.
  5. Verify Visibility: Check sightlines from typical approach paths.
  6. Document Installation: Update safety records and inform personnel of signage locations.

Practice Questions

  1. Explain the importance of using insulated gloves and safety helmets when mounting SCADA system hardware. (6 marks)

  2. Describe the procedure for issuing a work permit for electrical wiring during SCADA installation. (8 marks)

  3. List five types of waste generated during SCADA hardware mounting and explain how each should be managed. (10 marks)

  4. Identify the standard colour codes for live, neutral, earth, and control wiring used in Kenya for SCADA systems. (8 marks)

  5. Discuss four key requirements for the effective placement of danger warning signage in SCADA installations. (8 marks)

  6. Outline six steps to properly install barricades around a SCADA hardware mounting site. (12 marks)

  7. Provide a specification table for high voltage signage used in SCADA systems and explain the rationale for its design. (10 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.3 Preparation of SCADA installation cabinet

In Industrial Mechatronics Technology, the installation cabinet is the physical foundation where SCADA system components are securely mounted and interconnected. Proper preparation of the SCADA cabinet is crucial to ensure system reliability, protection agains…

🔒2.4 SCADA components

SCADA systems rely on a collection of specialized components that perform data acquisition, processing, and control functions. In the context of Industrial Mechatronics Technology in Kenya, understanding these components is fundamental for designing, installin…

🔒2.5 SCADA system wiring

In Industrial Mechatronics Technology, the wiring of SCADA systems is fundamental to ensuring reliable data acquisition and supervisory control. In Kenya’s industrial settings such as manufacturing plants, water treatment facilities, and agro-processing units,…

🔒2.6 Network troubleshooting

In Industrial Mechatronics Technology environments in Kenya, SCADA systems rely heavily on robust communication networks for real-time monitoring and control. Network faults can cause significant disruptions, affecting production lines, safety, and data integr…

🔒2.7 SCADA hierarchical levels

SCADA systems in Industrial Mechatronics in Kenya are structured in hierarchical levels to organize data flow and control commands efficiently. Understanding these levels helps technicians and engineers design, maintain, and troubleshoot systems effectively, e…

🔒2.8 Functional classification of industrial communication networks

In Industrial Mechatronics Technology, robust communication networks enable seamless data exchange and control across complex automated systems. Kenyan industries such as manufacturing plants, agro-processing facilities, and water treatment plants rely heavily…

🔒2.9 SCADA Wiring regulations

In Kenya’s industrial mechatronics sector, adherence to wiring regulations for Supervisory Control And Data Acquisition (SCADA) systems is critical to ensure safety, reliability, and compliance with legal standards. SCADA wiring involves complex integration of…

🔒2.10 Project: Mount and wire a SCADA system

Installing a SCADA system involves not only understanding its components but also the practical skills to mount and wire the system according to industry standards. This project focuses on the step-by-step procedures for mounting and wiring a SCADA system in a…

Chapter Summary

This chapter covers the essential components and procedures involved in mounting a SCADA system, beginning with health and safety measures such as the use of personal protective equipment, work permits, waste management, and adherence to electrical wiring colour codes and signage requirements. It details the preparation of the SCADA installation cabinet and describes the main SCADA components, including data input devices like sensors, data processing units such as PLCs or RTUs, output devices like HMIs and relays, and communication devices. The chapter explains SCADA system wiring, highlighting industrial communication networks, automation control mechanisms, and transmission media options including wireless radio waves and wired connections like twisted pair, coaxial cable, and fiber optics. It addresses network troubleshooting techniques and outlines the hierarchical levels of SCADA systems from the field level through PLCs and RTUs, communication, and HMI levels. Functional classifications of industrial communication networks are discussed, including serial communication, HART, DeviceNet, Modbus, Profibus, and Foundation Fieldbus protocols. The chapter concludes with SCADA wiring regulations and a practical project focused on mounting and wiring a complete SCADA system.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of Personal Protective Equipment (PPE) in a SCADA installation environment? (2 marks)
  2. Identify the correct colour coding for live, neutral, and earth wires in Kenyan electrical wiring standards. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe four types of personal protective equipment (PPE) essential when mounting SCADA system components in an industrial setting. (4 marks)
  2. Explain the purpose of work permits in health and safety management during SCADA installation at a manufacturing plant. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Implement Health and Safety Measures in SCADA Installation Site

Industrial Mechatronics Technology · Level 6
Supervisory Control And Data Acquisition Systems
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Set up a SCADA installation site safety perimeter 5m x 5m implementing health and safety measures including signage, barricades, and work permit display.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring tape (5 meters)Safety boots
HammerOverall / Dust coat
NailsWork permit document
Marker paint or chalkDanger warning signage
Barricade tape
Barricade stands
SCADA installation site layout plan
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Safety boots1 Pair per Candidate
2Overall / Dust coat1 per Candidate
3Work permit document1 per Candidate
4Danger warning signage (High voltage, Electrical hazard)3 pcs per Candidate
5Barricade tape (red and white striped)10 meters per Candidate
6Barricade stands4 pcs per Candidate
7Marker paint or chalk for ground marking1 can per Candidate
8Measuring tape (5 meters)1 per Candidate
9Hammer and nails for signage fixing1 set per Candidate
10SCADA installation site layout plan1 per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: IMPLEMENT HEALTH AND SAFETY MEASURES FOR SCADA INSTALLATION
Wore personal protective equipment (Safety boots and Overall/Dust coat)
(Award 1 mark for each PPE worn as per workplace)
2
Displayed valid work permit at the installation site
(Award 2 marks for correct and visible display)
2
Set up barricade stands and fixed barricade tape to create a 5m x 5m safety perimeter
(Award 3 marks for correct perimeter dimensions and secure setup)
3
Placed danger warning signage (high voltage and electrical hazard) visibly around the site
(Award 1 mark each for three correctly positioned signs)
3
Marked installation site boundaries clearly on the ground using marker paint or chalk
(Award 2 marks for clear and accurate markings)
2
Used tools correctly and safely during installation of safety measures
(Award 1 mark for correct use of hammer and 1 mark for measuring tape)
2
Organized work area neatly and ensured proper housekeeping after setup
(Award 1 mark for neat organization and 1 mark for housekeeping)
2
Sub-Total16
PRODUCT CHECKLIST
Safety perimeter correctly set out to 5m x 5m dimensions as per layout plan
(Award 3 marks for correct dimensions within ±5cm tolerance)
3
Work permit displayed visibly and legibly at the site entrance
(Award 2 marks for correct placement and legibility)
2
Danger warning signage fixed securely and clearly visible from all sides of the perimeter
(Award 1 mark each for three signs properly fixed and visible)
3
Barricade tape properly tensioned and secured on stands with no sagging
(Award 2 marks for secure and taut barricade tape)
2
Ground markings are clear, continuous, and correctly locate the safety perimeter
(Award 2 marks for clear and accurate ground markings)
2
Sub-Total12
GRAND TOTAL28
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Manage Waste During SCADA System Installation

Industrial Mechatronics Technology · Level 6
Supervisory Control And Data Acquisition Systems
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Segregate, collect, and dispose of waste generated during SCADA system installation according to workplace waste management procedures.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Safety bootsWaste segregation bins (Plastic, Metal, Electronic, General Waste)
Overall / Dust coatPlastic bags for waste collection
Gloves (Disposable nitrile)Waste disposal logbook
Labeling tape and marker pensSCADA system components packaging waste
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Safety boots1 pair per Candidate
2Overall / Dust coat1 per Candidate
3Waste segregation bins (Plastic, Metal, Electronic, General Waste)4 bins per Candidate
4Plastic bags for waste collection5 pcs per Candidate
5Labeling tape and marker pens1 set per Candidate
6Gloves (Disposable nitrile)1 pair per Candidate
7Waste disposal logbook1 per Candidate
8SCADA system components packaging waste1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: MANAGE WASTE DURING SCADA SYSTEM INSTALLATION
Donning of personal protective equipment: safety boots and overall/dust coat
(Award 1 mark each for safety boots and overall/dust coat worn)
2
Use of gloves during waste handling
(Award 1 mark for correct use of gloves)
1
Segregation of waste into correct bins: plastic, metal, electronic, general waste
(Award 1 mark for each correct waste category segregated)
4
Collection of waste using plastic bags and proper labeling with tape and marker
(Award 2 marks for correct collection and 1 mark for clear labeling)
3
Recording waste disposal details accurately in the waste disposal logbook
(Award up to 3 marks based on completeness and accuracy of records)
3
Disposal of waste according to workplace procedures and environmental guidelines
(Award 5 marks for correct disposal method and adherence to guidelines)
5
Demonstration of good housekeeping after waste disposal: cleaning and organizing the workplace
(Award 1 mark each for neatness and proper housekeeping)
2
Sub-Total20
PRODUCT CHECKLIST
Properly segregated and labeled waste bins with all waste collected and disposed of as per guidelines
(Award up to 10 marks based on correctness, completeness and neatness of waste management)
10
Sub-Total10
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Label and Connect Electrical Wires Using Standard Colour Codes for a SCADA SystemPractical 3
🔒Prepare and mount SCADA hardware components inside the installation cabinetPractical 4
🔒Mount and wire SCADA data input devices including sensorsPractical 5
🔒Install and wire a PLC data processing device for SCADA integrationPractical 6
🔒Mount and wire data output devices in SCADA systemPractical 7
🔒Install SCADA Communication Devices for Data ExchangePractical 8
🔒Perform complete wiring of a SCADA system as per standardsPractical 9
🔒Configure and Connect Industrial Communication Networks for SCADA IntegrationPractical 10
🔒Troubleshoot and rectify faults in a SCADA communication networkPractical 11
🔒Demonstrate SCADA hierarchical levels configurationPractical 12
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Apply health and safety procedures correctly throughout the SCADA system installation.
  • Select the right SCADA system installation tools based on the job requirements.
  • Prepare SCADA system installation cabinets following the manufacturer’s specifications.
  • Fit SCADA components accurately according to the job requirements.
  • Carry out SCADA system wiring safely and correctly following IEEE regulations.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.