Refrigeration And Air Conditioning  ·  Level 6
Hydrocarbon Rac Units Installation And Maintenance
Chapter 3: Install hydrocarbon RAC system
📚 10 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Identify the correct hydrocarbon RAC unit to install by following workplace procedures.
  • Follow health, safety, and environmental standards like EPA, EMCA 2020, ASHRAE, ISO, and EN regulations to work safely and responsibly.
  • Choose the right tools, equipment, and materials needed for installing hydrocarbon RAC units.
  • Install the hydrocarbon RAC unit accurately by following the manufacturer’s manual step-by-step.
  • Perform lubrication and charging of the unit safely and correctly according to workplace procedures.
  • Select the appropriate insulation materials based on the specific task requirements.
  • Carry out pipe insulation properly to ensure efficient system performance.
  • Maintain a clean and safe work area by following environmental laws and workplace housekeeping procedures.
  • Prepare a clear and accurate installation report that meets workplace standards.

Mastering these skills will help you become a confident and responsible technician, ready to install hydrocarbon RAC systems safely and efficiently in the real world.

Refrigeration and air conditioning systems using hydrocarbon refrigerants are increasingly adopted in Kenya due to their high energy efficiency and low environmental impact. Installing these systems requires precise interpretation of technical drawings and adherence to specific safety and design standards tailored to hydrocarbons' flammability. This chapter equips refrigeration and air conditioning professionals with the skills to accurately interpret installation drawings and implement installation requirements critical for safe and effective hydrocarbon RAC systems in diverse Kenyan settings such as hospitals, hotels, and county government offices.

3.1 Interpretation of Installation Drawings

Interpretation of installation drawings is a foundational skill for refrigeration and air conditioning technicians working with hydrocarbon systems. These drawings serve as the blueprint detailing the layout, components, and interconnections necessary for system installation. In Kenya, where adherence to standards such as the Kenya Bureau of Standards (KEBS) and the National Environment Management Authority (NEMA) regulations is mandatory, the ability to read and understand these drawings ensures compliance, safety, and operational efficiency.

3.1.1 Types of Installation Drawings Used in Hydrocarbon RAC Systems

Installation drawings for hydrocarbon RAC systems vary in type and detail depending on the complexity of the system and the project scale. Recognizing these types is essential for proper interpretation and execution.

Component Layout Drawings

Component layout drawings provide a bird’s-eye view of all major system elements such as compressors, condensers, evaporators, and piping routes. In a university laboratory setting, these drawings help technicians position components to optimize space and maintenance access while ensuring safe distances between hydrocarbon-containing parts and ignition sources.

Piping and Instrumentation Diagrams (P&IDs)

P&IDs illustrate the detailed piping layout, including valves, sensors, and control systems. These diagrams are crucial in a hospital's refrigeration plant where precise control and monitoring of refrigerant flow are vital to maintain critical cooling conditions.

Electrical Wiring Diagrams

Electrical wiring diagrams show the electrical connections and controls for the hydrocarbon system components. For instance, in a county government office's air conditioning system, these diagrams ensure that technicians safely wire electrical components to avoid sparks near flammable refrigerants.

Isometric Drawings

Isometric drawings offer a three-dimensional perspective of pipe runs and component placement, aiding in visualizing spatial relationships. This is particularly useful in retail businesses where space constraints challenge straightforward component installation.

3.1.2 Symbols and Notations in Hydrocarbon RAC Drawings

Understanding the standardized symbols and notations used in hydrocarbon RAC installation drawings is critical to avoid misinterpretation that could lead to safety hazards or system malfunction.

Refrigerant Type Identification

Hydrocarbon refrigerants like propane (R290) or isobutane (R600a) are indicated using specific symbols or abbreviations. For example, a propane refrigerant line may be labeled as R290, alerting technicians to the flammable nature of the system.

Valve and Fitting Symbols

Different types of valves (e.g., solenoid, check, expansion) and fittings are represented by unique symbols. In a hotel refrigeration system, correct identification of these ensures proper installation and servicing procedures.

Electrical Components

Symbols for compressors, motors, switches, and sensors are standardized to convey electrical system design clearly. At a SACCO office's air conditioning plant, electricians rely on these symbols to implement safe electrical connections.

Safety and Warning Indicators

Drawings include symbols for safety devices like pressure relief valves and emergency shutoffs. These notations are essential in all sectors, especially in hospitals, to prevent accidents involving hydrocarbon leaks.

3.1.3 Reading and Interpreting Scale and Dimensions

Accurate interpretation of scale and dimension information on installation drawings is vital for correct component placement and system layout.

Scale Interpretation

Drawings use scales (e.g., 1:50 or 1:100) to represent real-world dimensions on paper. Technicians must convert these scaled measurements into actual lengths when installing piping or mounting components in a county government office.

Dimensioning Conventions

Dimensions are indicated using lines, arrows, and numerical values to specify distances between components. For instance, maintaining minimum clearance distances for hydrocarbon components to prevent ignition hazards in a retail shop is guided by these dimensions.

Tolerances and Allowances

Drawings may specify tolerances to accommodate installation variances. Understanding these helps technicians at a cooperative's cold storage facility ensure components fit correctly without compromising system integrity.

Units of Measurement

Kenyan installations commonly use metric units (millimeters, meters) on drawings. Consistency in unit interpretation prevents errors during installation in various sectors, including educational institutions.

3.1.4 Cross-Referencing Drawings and Documentation

Installation drawings are part of a broader set of technical documents that include specifications, manufacturers’ manuals, and safety standards. Cross-referencing these documents is essential for comprehensive understanding.

Matching Drawings with Equipment Specifications

Verifying that the components shown in drawings meet the specifications in manufacturers’ manuals ensures correct parts are installed. This practice is critical in a hospital refrigeration plant to maintain system reliability.

Compliance with Safety Codes

Cross-referencing drawings with KEBS and NEMA safety codes ensures that hydrocarbon systems adhere to legal requirements. This is especially important in public institutions like county hospitals.

Integration with Electrical and Control Documentation

Ensuring consistency between installation drawings and control system manuals prevents wiring errors in air conditioning systems at universities.

Updating Drawings During Installation

Field modifications may require updates to drawings to reflect actual installation, aiding future maintenance in commercial buildings.

Practice Questions

  1. Describe four types of installation drawings used in hydrocarbon RAC systems and their significance in system installation. (8 marks)
  2. Explain why understanding symbols and notations on hydrocarbon RAC installation drawings is critical for safety. Provide five examples of common symbols. (10 marks)
  3. How do scale and dimension interpretation affect hydrocarbon RAC system installation? Illustrate with two examples from a real installation context. (7 marks)
  4. Discuss the importance of cross-referencing installation drawings with other technical documentation during hydrocarbon RAC system installation. (5 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Hydrocarbon RAC System Installation Requirements

Installing hydrocarbon refrigeration and air conditioning systems demands strict adherence to specialized requirements due to the flammable nature of hydrocarbons. These requirements address safety, environmental compliance, and operational efficiency in Kenya…

🔒3.3 Air circulation/ventilation requirements

Proper air circulation and ventilation are critical when installing hydrocarbon refrigeration and air conditioning (RAC) systems due to the flammable nature of hydrocarbon refrigerants such as R290 and R600a. In Kenya, where safety standards are enforced by bo…

🔒3.4 Drain disposal requirements

Drainage systems in hydrocarbon RAC installations manage condensate removal and prevent water accumulation that can cause equipment damage or safety risks. In Kenya’s varied climates, from humid coastal regions to highland areas, proper drain disposal is essen…

🔒3.5 Power Supply Requirements

In hydrocarbon refrigeration and air conditioning (RAC) systems, ensuring the correct power supply is fundamental to the safe and efficient operation of equipment. In Kenya, where power reliability can vary between urban centers and rural areas, understanding…

🔒3.6 Wall and Floor Finishing

The finishing of walls and floors in hydrocarbon RAC installations affects not only the aesthetics but also the safety, hygiene, and durability of the refrigeration environment. In Kenyan contexts such as hospitals, food processing plants, and cold storage fac…

🔒3.7 Provision for serviceability

In hydrocarbon refrigeration and air conditioning (RAC) systems, ensuring that equipment is serviceable is critical for maintaining system efficiency and safety. Kenya’s growing adoption of hydrocarbon refrigerants like propane (R290) and isobutane (R600a) in…

🔒3.8 User access to the unit

User access to hydrocarbon RAC units encompasses the ability of operators or end-users to interact safely and effectively with the system for routine checks, adjustments, or emergency shutdowns. In Kenyan commercial environments such as retail shops or county…

🔒3.9 Tools, Equipment and Materials

Installation and maintenance of hydrocarbon refrigeration and air conditioning (RAC) systems require specialized tools, equipment, and materials. In the Kenyan context, technicians working in environments such as hospitals, county government offices, and hotel…

🔒3.10 Specific Health, Safety and Environmental Requirements and Standards

In the refrigeration and air conditioning (RAC) sector in Kenya, compliance with health, safety, and environmental standards is critical, especially when working with hydrocarbon refrigerants. These substances, while efficient and environmentally friendly alte…

Chapter Summary

This chapter provided a comprehensive guide on installing hydrocarbon RAC systems, beginning with the crucial skill of interpreting installation drawings to ensure accurate placement and connections. It outlined the specific installation requirements necessary for the safe and efficient operation of these systems. The importance of adequate air circulation and ventilation was emphasized to maintain system performance and safety. Proper drain disposal methods were discussed to prevent environmental contamination. The chapter also covered power supply considerations essential for reliable system operation. Attention was given to wall and floor finishing to support installation integrity and maintenance. Provision for serviceability and user access was explained to facilitate routine maintenance and ease of use. Finally, the chapter detailed the relevant health, safety, and environmental standards and regulations, including those from EPA, EMCA 2020, ASHRAE, ISO 22172, EN 378, ISO 5149, and EN 13313, that govern hydrocarbon RAC system installation and operation.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of interpreting installation drawings in hydrocarbon RAC system installation? (3 marks)
  2. List four key installation requirements specific to hydrocarbon RAC systems and explain why each is important. (8 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain how to interpret installation drawings for a hydrocarbon RAC system installed in a Nairobi hospital (4 marks)
  2. List four key installation requirements specific to hydrocarbon RAC systems in commercial buildings (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Interpretation of Hydrocarbon RAC System Installation Drawings

Refrigeration And Air Conditioning · Level 6
Hydrocarbon Rac Units Installation And Maintenance
PRACTICAL ASSESSMENT
TIME: 3 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Interpret the hydrocarbon RAC system installation drawing showing a pipe run layout 1500mm long with key components identified and dimensioned as per the provided installation drawing.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Scale ruler 300 mmInstallation drawings for hydrocarbon RAC system
Pencil HBNotebook for notes
Eraser
Calculator
Drawing board
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Installation drawings for hydrocarbon RAC system1 Set per Candidate
2Scale ruler 300 mm1 Pc per Candidate
3Pencil HB1 Pc per Candidate
4Eraser1 Pc per Candidate
5Drawing board1 Pc per Candidate
6Notebook for notes1 Pc per Candidate
7Calculator1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Interpretation of Hydrocarbon RAC System Installation Drawings
Wore appropriate PPE as per SOP (dust coat, gloves, safety boots, goggles)
(Award 1 mark for correct PPE use or zero)
1
Handled tools and equipment as per workshop procedure
(Award 1 mark for correct and safe tool handling)
1
Identified and listed all key components on the installation drawing (compressor, condenser, evaporator, expansion valve, pipe runs, valves)
(Award 1 mark per correctly identified component, max 5 marks)
5
Interpreted pipe run layout and correctly noted main pipe dimensions (1500mm length, diameter 12mm and 8mm branches)
(Award 3 marks for correct interpretation of pipe sizes and lengths)
3
Noted correct positioning of indoor and outdoor units as per drawing
(Award 2 marks for correct location identification)
2
Recorded notes on installation sequence and connection points from the drawing
(Award 2 marks for clear and relevant notes)
2
Performed final review for accuracy and completeness of interpretation
(Award 1 mark for thorough review and correction if needed)
1
Sub-Total15
PRODUCT CHECKLIST
Accurate identification and dimensioning of pipe run length 1500mm as per drawing
(Award 3 marks for correct pipe length dimension)
3
Correct labeling of key components matching installation drawing
(Award 3 marks for accurate labeling)
3
Properly noted layout showing indoor and outdoor unit positions
(Award 2 marks for correct positioning)
2
Clear and legible notes on installation instructions and sequence
(Award 2 marks for clarity and relevance)
2
Drawing and notes presented neatly on drawing board
(Award 3 marks for neatness and presentation quality)
3
Sub-Total13
GRAND TOTAL28
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Set Up Air Circulation and Ventilation for Hydrocarbon RAC Unit

Refrigeration And Air Conditioning · Level 6
Hydrocarbon Rac Units Installation And Maintenance
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Install and configure an air circulation and ventilation duct system with dimensions 150mm x 150mm x 1.5m for a hydrocarbon RAC unit.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Electric drill with sheet metal bitsGalvanized sheet metal gauge 28
Tin snipsSheet metal duct connectors
Screwdriver set (insulated)Adjustable metal duct damper
Measuring tape 5mAluminium ventilation grilles
Spirit level 600mmSilicone sealant (tube)
Marker penSheet metal screws
Ventilation duct flexible hose (150mm diameter)
RAC unit mounting bracket
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Galvanized sheet metal gauge 28500mm x 500mm per Candidate
2Sheet metal duct connectors5 Pcs per Candidate
3Adjustable metal duct damper1 Pc per Candidate
4Aluminium ventilation grilles2 Pcs per Candidate
5Silicone sealant (tube)1 Tube per Candidate
6Sheet metal screws20 Pcs per Candidate
7Safety overall/dust coat1 per Candidate
8Safety boots1 Pair per Candidate
9Safety gloves1 Pair per Candidate
10Safety goggles1 Pair per Candidate
11Electric drill with sheet metal bits1 per Candidate
12Tin snips1 per Candidate
13Screwdriver set (insulated)1 per Candidate
14Measuring tape 5m1 per Candidate
15Spirit level 600mm1 per Candidate
16Marker pen1 per Candidate
17Work gloves (additional)1 Pair per Candidate
18Ventilation duct flexible hose (150mm diameter)2 meters per Candidate
19RAC unit mounting bracket1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Safety and Preparation
Wore appropriate PPE including overall/dust coat, safety boots, gloves, and goggles
(Award 1 mark for full compliance, else zero)
1
Handled tools and equipment correctly as per workshop procedures
(Award 1 mark for correct and safe tool handling)
1
Measured and marked sheet metal accurately to 150mm x 150mm x 1.5m dimensions
(Award 1 mark for accurate measurement and marking)
1
Cut sheet metal to size correctly using tin snips without deformation
(Award 1 mark for neat, straight cuts)
1
Drilled holes for duct connectors and mounting brackets accurately
(Award 1 mark for precise drilling matching layout)
1
Assembled duct sections and fitted connectors securely
(Award 1 mark each for secure assembly and proper fit)
2
Installed adjustable metal damper correctly within the duct system
(Award 1 mark for correct damper installation and orientation)
1
Mounted ventilation grilles at appropriate inlet and outlet points
(Award 1 mark for correct grille positioning and secure fixing)
1
Applied silicone sealant neatly on duct joints to prevent air leakage
(Award 1 mark for neat and sufficient sealant application)
1
Installed flexible ventilation duct hose correctly with secure connections
(Award 1 mark for proper hose fitting and sealing)
1
Positioned and secured the RAC unit mounting bracket as per specifications
(Award 1 mark for correct bracket installation and alignment)
1
Sub-Total12
TASK 2: Testing and Commissioning
Checked air flow through the ventilation system for unobstructed circulation
(Award 1 mark for confirming proper airflow)
1
Tested operation of adjustable damper to regulate air volume
(Award 1 mark for damper functional test)
1
Ensured all electrical connections to the RAC unit are secure and safe
(Award 1 mark for secure electrical connections)
1
Performed a final inspection for safety hazards and compliance with standards
(Award 1 mark for thorough final inspection)
1
Conducted housekeeping by cleaning the work area, tools, and disposing waste properly
(Award 1 mark for proper housekeeping)
1
Sub-Total5
TASK 3: Documentation
Prepared a service report including title, tools used, materials, and procedure
(Award 2 marks for complete and clear report)
2
Included safety observations and recommendations in the report
(Award 1 mark for inclusion of safety notes)
1
Sub-Total3
PRODUCT CHECKLIST
Duct system installed to exact dimensions 150mm x 150mm x 1.5m as per drawing
(Award up to 3 marks for dimensional accuracy)
3
Duct joints are well sealed with no visible air leaks
(Award 2 marks for airtight joints)
2
Ventilation grilles and damper installed symmetrically and securely fixed
(Award 2 marks for proper fitting and alignment)
2
RAC unit mounting bracket installed level and firmly fixed
(Award 1 mark for correct bracket installation)
1
Overall workmanship and finish of ventilation system neat and professional
(Award 2 marks for quality workmanship)
2
Sub-Total10
GRAND TOTAL30
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Install Drain Disposal System for Hydrocarbon RAC UnitPractical 3
🔒Connect Electrical Power Supply to Hydrocarbon RAC SystemPractical 4
🔒Apply wall and floor finishing around installed hydrocarbon RAC unitPractical 5
🔒Provision for Serviceability in Hydrocarbon RAC Unit InstallationPractical 6
🔒Installation of Access Panels and Pathways for Hydrocarbon RAC UnitPractical 7
🔒Select and Prepare Tools, Equipment and Materials for Hydrocarbon RAC System InstallationPractical 8
🔒Implement Health, Safety and Environmental Standards During Hydrocarbon RAC System InstallationPractical 9
🔒Apply EPA Regulations in Hydrocarbon RAC System InstallationPractical 10
🔒Installation of Hydrocarbon RAC System Complying with EMCA 2020 StandardsPractical 11
🔒Install Split Hydrocarbon RAC System According to ASHRAE StandardsPractical 12
🔒Installation of a Hydrocarbon RAC System Complying with ISO 22172 and ISO 5149Practical 13
🔒Installation of Hydrocarbon RAC System Components in Compliance with EN 378 and EN 13313Practical 14
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Identify the correct hydrocarbon RAC unit to install by following workplace procedures.
  • Follow health, safety, and environmental standards like EPA, EMCA 2020, ASHRAE, ISO, and EN regulations to work safely and responsibly.
  • Choose the right tools, equipment, and materials needed for installing hydrocarbon RAC units.
  • Install the hydrocarbon RAC unit accurately by following the manufacturer’s manual step-by-step.
  • Perform lubrication and charging of the unit safely and correctly according to workplace procedures.
  • Select the appropriate insulation materials based on the specific task requirements.
  • Carry out pipe insulation properly to ensure efficient system performance.
  • Maintain a clean and safe work area by following environmental laws and workplace housekeeping procedures.
  • Prepare a clear and accurate installation report that meets workplace standards.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.