Refrigeration And Air Conditioning  ·  Level 6
Air Conditioning Units Maintenance And Repair
Chapter 7: Test-run the maintained Refrigeration units
📚 7 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • safely check the voltage and current to match the rated requirements of the Air Conditioning unit
  • accurately measure the temperature and velocity of air based on the unit’s specifications
  • correctly check sound and vibration levels according to the unit’s specifications
  • perform housekeeping safely and properly by following workplace procedures and OSH legislation
  • hand over the Air Conditioning unit to the user following the correct workplace procedures
  • prepare a clear and accurate report following workplace procedures

These skills ensure you can confidently complete test-runs and deliver reliable, safe air conditioning units to users in the real world.

Test-running maintained refrigeration units is a critical phase in ensuring that the air conditioning system performs reliably and efficiently after maintenance or repair. This process involves careful measurement and monitoring of operational parameters to verify that the unit meets design specifications and safety standards. In Kenya, where climate conditions can vary widely across regions from Nairobi’s temperate climate to the coastal heat of Mombasa, accurate temperature testing during a test-run is essential for confirming system readiness and occupant comfort. Proper temperature testing also helps detect latent faults before the unit is returned to service in hospitals, schools, hotels, or commercial buildings.

7.1 Temperature Testing

Temperature testing is a fundamental aspect of commissioning refrigeration and air conditioning units after maintenance. It provides quantitative data on the unit’s cooling performance, verifies that refrigerant cycles operate within specified ranges, and confirms the effectiveness of heat exchange processes. For Kenyan refrigeration professionals, mastering temperature testing techniques is vital to meet client expectations, comply with industry standards, and avoid costly callbacks.

7.1.1 Principles of Temperature Testing in Refrigeration Units

Temperature testing involves measuring temperatures at strategic points within the refrigeration cycle to assess system performance. Understanding these principles ensures that technicians can interpret readings correctly and diagnose potential issues.

Key Points on Temperature Testing Principles

  • Temperature Differential Measurement: This involves measuring the temperature difference between the evaporator inlet and outlet air or refrigerant lines. A correct differential indicates proper heat absorption and transfer within the evaporator.

  • Superheat and Subcooling Concepts: Superheat is the temperature of the refrigerant vapor above its saturation temperature at the evaporator outlet; subcooling is the temperature of the refrigerant liquid below saturation at the condenser outlet. Both parameters confirm the refrigerant charge and system efficiency.

  • Use of Saturation Temperature: Saturation temperature is the temperature at which refrigerant changes phase at a given pressure. Measuring pressures and converting to saturation temperatures allows technicians to calculate superheat and subcooling accurately.

  • Thermocouple and Thermistor Sensors: These sensors are commonly used in temperature testing. Thermocouples provide fast response and wide temperature ranges, while thermistors offer high sensitivity and accuracy for low-temperature measurements.

  • Environmental Factors Impact: Ambient temperature and humidity influence temperature test results. For example, in Nairobi’s dry climate, evaporator performance may differ from that in humid coastal areas, requiring adjustments in interpretation.

7.1.2 Temperature Measurement Points on Refrigeration Units

Accurate temperature testing requires identifying specific points on the refrigeration unit to measure temperatures that reflect system performance comprehensively.

Critical Temperature Measurement Locations

  • Evaporator Coil Outlet Air Temperature: This measures the cooled air leaving the evaporator. It indicates whether the unit achieves the target cooling effect for the conditioned space.

  • Suction Line Temperature Near Compressor: Measuring here helps determine superheat and assess whether the evaporator is fully utilizing the refrigerant.

  • Discharge Line Temperature at Compressor Outlet: This temperature reflects compressor performance and refrigerant condition after compression.

  • Condenser Outlet Temperature: Measuring the temperature of the refrigerant liquid leaving the condenser confirms heat rejection efficiency.

  • Ambient Air Temperature Near Outdoor Unit: This provides context for performance evaluation, as condenser efficiency depends on ambient conditions.

7.1.3 Temperature Testing Instruments and Their Specifications

Selecting appropriate instruments for temperature testing ensures reliable and accurate data collection during the test-run phase.

Name Specification Use
Digital Thermometer Accuracy ±0.1°C, range -50°C to 150°C Measuring air and surface temperatures at various points
Thermocouple Probe Type K, fast response, temperature range -200°C to 1260°C Measuring refrigerant line temperatures
Infrared Thermometer Accuracy ±2%, distance-to-spot ratio 12:1 Non-contact surface temperature measurement
Psychrometer Measures dry bulb and wet bulb temperatures Assessing ambient humidity and temperature
Manifold Gauge with Temperature Probe Pressure gauge with temperature sensor for refrigerants Simultaneous pressure and temperature measurement to calculate saturation temperature

Proper calibration and maintenance of these instruments are essential to avoid erroneous readings that could mislead diagnosis.

7.1.4 Procedure for Conducting Temperature Testing During Test-Run

Executing temperature testing requires a systematic approach to ensure all relevant temperatures are recorded accurately and safely.

  1. Prepare the Unit for Testing: Ensure the refrigeration unit is fully installed, all maintenance completed, and the system charged with the correct refrigerant quantity.

  2. Power On the Unit and Stabilize Operation: Run the unit for at least 15-30 minutes to reach steady-state conditions where temperatures and pressures stabilize.

  3. Measure Ambient Temperature: Use a psychrometer or digital thermometer to record ambient air temperature near the condenser unit.

  4. Record Evaporator Outlet Air Temperature: Place the thermometer probe in the airflow exiting the evaporator coil, avoiding direct contact with the coil surface.

  5. Measure Suction Line Temperature Near Compressor: Attach a thermocouple probe securely to the suction line insulation close to the compressor inlet.

  6. Measure Discharge Line Temperature: Attach the thermocouple probe to the discharge line near the compressor outlet.

  7. Measure Condenser Outlet Temperature: Place the probe on the liquid line leaving the condenser coil.

  8. Record All Readings and Calculate Superheat and Subcooling: Use pressure measurements from the manifold gauge to find saturation temperatures, then apply the formulas:

  9. Superheat = Suction Line Temperature - Saturation Temperature at Suction Pressure

  10. Subcooling = Saturation Temperature at Condenser Pressure - Liquid Line Temperature

  11. Compare Results Against Manufacturer Specifications: Verify that temperature differentials, superheat, and subcooling fall within recommended ranges.

  12. Document Findings for Client and Maintenance Records: Provide a detailed report highlighting system performance and any anomalies detected.

Practice Questions

  1. Explain why measuring both superheat and subcooling is essential during temperature testing of refrigeration units. (10 marks)

  2. Describe the procedure for measuring the evaporator outlet air temperature during a test-run. (8 marks)

  3. List and explain five critical temperature measurement points on a refrigeration unit and their significance. (12 marks)

  4. Given a suction line temperature of 7°C and a saturation temperature at suction pressure of 3°C, calculate the superheat. Show your working. (5 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒7.2 Current and voltage measurement

In the maintenance and repair of refrigeration and air conditioning units, accurate measurement of electrical parameters such as current and voltage is essential. In Kenya, where energy costs and electrical safety are critical concerns, technicians must ensure…

🔒7.3 Sound and vibration checking

In the maintenance and repair of refrigeration and air conditioning units, sound and vibration checking is a critical phase of the test-run process. These checks ensure that the unit operates smoothly, safely, and efficiently without excessive noise or harmful…

🔒7.4 Operation of Air Conditioning Unit Within Acceptable Parameters

In Kenya’s diverse climatic zones and expanding urban environments, maintaining air conditioning units to operate within acceptable parameters is critical for ensuring comfort, energy efficiency, and equipment longevity. For refrigeration and air conditioning…

🔒7.5 Training the user on use of the unit

In the Kenyan refrigeration and air conditioning sector, successful maintenance and repair of units is incomplete without effective user training. Proper training ensures that the end-users operate the equipment optimally, prolong its lifespan, and prevent avo…

🔒7.6 Handing Over Procedures

Handing over procedures mark the critical transition phase after maintenance or repair work on refrigeration and air conditioning units. In Kenya, where facilities such as hospitals, universities, hotels, and county government offices depend heavily on reliabl…

🔒7.7 Report Writing

Effective report writing is crucial for refrigeration and air conditioning professionals in Kenya, especially after test-running maintained refrigeration units. A well-prepared report documents the maintenance activities, test results, and any recommendations…

Chapter Summary

This chapter focused on the essential steps involved in test-running maintained refrigeration units to ensure optimal performance. It began with temperature testing to verify that the unit maintains the desired cooling levels accurately. Following this, current and voltage measurements were conducted to assess the electrical health and efficiency of the air conditioning system. Sound and vibration checks were performed to detect any abnormal noises or mechanical issues that could indicate underlying faults. The operation of the unit was then evaluated to confirm it functioned within acceptable parameters, safeguarding both performance and safety. Training the user on proper operation and maintenance was emphasized to prolong the unit’s lifespan and prevent misuse. The chapter concluded with procedures for handing over the unit to the user and the importance of thorough report writing to document the maintenance and test-run results comprehensively.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the importance of temperature testing during the test-run of a maintained air conditioning unit? (2 marks)
  2. Describe the procedure for measuring current and voltage in an air conditioning unit during maintenance. (3 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the importance of temperature testing during the test-run of a maintained air conditioning unit in a Nairobi hospital setting. (4 marks)
  2. Describe the procedure for measuring current and voltage in a split air conditioning system at a county government office. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Perform temperature testing on a refrigeration unit

Refrigeration And Air Conditioning · Level 6
Air Conditioning Units Maintenance And Repair
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Perform temperature testing on the refrigeration unit and record temperature at the evaporator inlet and outlet points as per the service manual specifications.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Digital thermometer with probeRefrigeration unit (split type)
Clamp meterOverall/dust coat
Digital multimeterGloves
Insulated screwdriver setSafety boots
PliersSafety goggles
Wire strippers and cuttersService manual for refrigeration unit
Allen keys set
Electrical tape
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Refrigeration unit (split type)1 Pc per Candidate
2Digital thermometer with probe1 Pc per Candidate
3Clamp meter1 Pc per Candidate
4Digital multimeter1 Pc per Candidate
5Insulated screwdriver set1 Set per Candidate
6Pliers1 Pc per Candidate
7Wire strippers and cutters1 Set per Candidate
8Allen keys set1 Set per Candidate
9Electrical tape1 Roll per Candidate
10Safety boots1 Pair per Candidate
11Overall/dust coat1 Pc per Candidate
12Gloves1 Pair per Candidate
13Safety goggles1 Pc per Candidate
14Service manual for refrigeration unit1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Safety and Preparation
Wore appropriate PPE (overall/dust coat, gloves, safety boots, goggles)
(Award 1 mark for correct PPE usage)
1
Handled tools and equipment safely as per workshop procedure
(Award 1 mark for correct and safe handling)
1
Verified refrigeration unit is powered off before testing
(Award 1 mark for isolation of power)
1
Checked service manual and identified points for temperature measurement
(Award 1 mark for correct identification)
1
Set up digital thermometer and clamp meter correctly for testing
(Award 1 mark for correct setup)
1
Sub-Total5
TASK 2: Perform Temperature Testing
Switched on refrigeration unit and allowed it to stabilize
(Award 1 mark for correct procedure)
1
Measured and recorded temperature at evaporator inlet
(Award 2 marks for accurate measurement and recording)
2
Measured and recorded temperature at evaporator outlet
(Award 2 marks for accurate measurement and recording)
2
Checked and recorded electrical current using clamp meter
(Award 1 mark for correct use of clamp meter)
1
Interpreted recorded temperatures to assess cooling performance
(Award 1 mark for correct interpretation)
1
Sub-Total7
TASK 3: Housekeeping and Reporting
Switched off refrigeration unit and safely disconnected test equipment
(Award 1 mark for safe shutdown and disconnection)
1
Cleaned work area and stored tools and equipment properly
(Award 1 mark for proper housekeeping)
1
Prepared a service report including title, tools used, temperature readings, and observations
(Award 2 marks for completeness and clarity of report)
2
Sub-Total4
PRODUCT CHECKLIST
Temperature recorded at evaporator inlet and outlet matches expected ranges within ±2°C
(Award up to 3 marks based on accuracy)
3
Electrical current measurement within manufacturer's specification ±0.1A
(Award up to 2 marks based on accuracy)
2
Service report is clear, complete, and correctly formatted
(Award up to 3 marks for report quality)
3
Sub-Total8
GRAND TOTAL24
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Measure Electrical Current and Voltage of a Split Air Conditioning Unit During Operation

Refrigeration And Air Conditioning · Level 6
Air Conditioning Units Maintenance And Repair
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Measure and record the electrical current (in amperes) and voltage (in volts) of the split air conditioning unit during operation following the service manual specifications.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Digital Clamp MeterSplit Air Conditioning Unit
Digital MultimeterPersonal Protective Equipment (PPE) - Gloves, Safety Boots, Overall/Dust Coat, Goggles
Insulated Screwdriver SetService Manual for Split Air Conditioning Unit
Pliers
Wire Strippers and Cutters
Electrical Tape
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Split Air Conditioning Unit1 Pc per Candidate
2Digital Clamp Meter1 Pc per Candidate
3Digital Multimeter1 Pc per Candidate
4Insulated Screwdriver Set1 Set per Candidate
5Pliers1 Pc per Candidate
6Wire Strippers and Cutters1 Pc per Candidate
7Electrical Tape1 Roll per Candidate
8Personal Protective Equipment (PPE) - Gloves, Safety Boots, Overall/Dust Coat, Goggles1 Set per Candidate
9Service Manual for Split Air Conditioning Unit1 Pc per Station
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Prepare and Safety Check
Wore appropriate PPE as per job requirements (Gloves, Overall/Dust Coat, Safety Boots, Goggles)
(Award 1 mark for correct PPE use or zero)
1
Handled tools and electrical instruments correctly and safely
(Award 1 mark for correct and safe handling or zero)
1
Sub-Total2
TASK 2: Measurement Procedure
Verified unit is powered and operational before testing
(Award 1 mark for verification or zero)
1
Used digital clamp meter to measure current on the live conductor correctly
(Award 1 mark each for correct clamp placement and reading)
2
Used digital multimeter to measure voltage across the correct terminals accurately
(Award 1 mark each for correct connection and reading)
2
Recorded the measurements clearly and legibly
(Award 1 mark for clear recording or zero)
1
Ensured all electrical connections and equipment are safely restored after measurement
(Award 1 mark for safe restoration or zero)
1
Sub-Total7
TASK 3: Housekeeping and Reporting
Cleaned the work station and returned tools and equipment to storage
(Award 1 mark for proper housekeeping or zero)
1
Prepared a brief service report including measured current and voltage, tools used, and observations
(Award 2 marks for accurate and complete report or zero)
2
Sub-Total3
PRODUCT CHECKLIST
Accurately measured and recorded electrical current (amperes) and voltage (volts) matching unit specifications
(Award up to 5 marks based on accuracy and completeness of recorded values)
5
Sub-Total5
GRAND TOTAL17
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Check sound and vibration levels of refrigeration unitPractical 3
🔒Test-run and evaluate operation of a maintained split air conditioning unitPractical 4
🔒Conduct user training on operation of a maintained air conditioning unitPractical 5
🔒Perform handing over procedures of maintained refrigeration unitPractical 6
🔒Write maintenance and test report for refrigeration unitPractical 7
🔒Integrated Electrical and Temperature Testing of a Maintained Refrigeration UnitPractical 8
🔒Integrated Sound, Vibration and Operational Assessment of a Maintained Split Air Conditioning UnitPractical 9
🔒Conduct User Training and Formal Handover of Maintained Refrigeration UnitPractical 10
Flashcards 19 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

17 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • safely check the voltage and current to match the rated requirements of the Air Conditioning unit
  • accurately measure the temperature and velocity of air based on the unit’s specifications
  • correctly check sound and vibration levels according to the unit’s specifications
  • perform housekeeping safely and properly by following workplace procedures and OSH legislation
  • hand over the Air Conditioning unit to the user following the correct workplace procedures
  • prepare a clear and accurate report following workplace procedures

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.