Refrigeration And Air Conditioning  ·  Level 6
Air Conditioning Units Installation
Chapter 3: Install A/C units
📚 11 Topics

Air conditioning unit installation is a critical skill for refrigeration and air conditioning professionals in Kenya, involving precise interpretation of technical drawings and understanding the different types of units available. Mastery of schematic drawings allows installers to correctly follow system designs, ensuring efficient and safe operation. Selecting the appropriate air conditioning unit type is essential to meet diverse environmental and client needs, ranging from residential to commercial applications. This chapter focuses on interpreting schematic drawings and the characteristics of window and split air conditioning units, foundational knowledge for effective installation.

3.1 Interpretation of Schematic Drawings

Understanding schematic drawings is fundamental for refrigeration and air conditioning technicians in Kenya, as these drawings provide a visual representation of the system layout, components, and wiring connections. Accurate interpretation ensures proper installation, troubleshooting, and maintenance of air conditioning systems, which is vital in environments such as hospitals or county government offices where uninterrupted cooling is critical. These drawings can vary in complexity depending on the system size and type, requiring a systematic approach to decode symbols, lines, and annotations.

3.1.1 Purpose of Schematic Drawings

Schematic drawings serve as a blueprint for the installation and servicing of air conditioning units. They illustrate the electrical and mechanical layout, showing how components like compressors, condensers, evaporators, and thermostats interconnect. These drawings help avoid installation errors that could lead to system inefficiency or failure. For example, at a Nairobi hospital, technicians rely on schematic diagrams to ensure that the HVAC system maintains the sterile environment required in operating theatres. Additionally, schematic drawings are essential for coordinating with other trades during building construction or renovation, preventing conflicts in piping or wiring routes.

3.1.2 Common Symbols and Their Meanings

Schematic drawings use standardized symbols to represent components and connections, enabling technicians to read and understand the system quickly. Recognizing these symbols is crucial for correct installation and troubleshooting. Common symbols include:

Common Symbols in Air Conditioning Schematics

  • Compressor: Typically represented by a circle with a letter "C" inside, indicating the heart of the refrigeration cycle.
  • Fan: Shown as a circle with blades or a propeller symbol, representing air movement components.
  • Thermostat: Depicted as a small rectangle or switch symbol, indicating temperature control devices.
  • Electrical connections: Lines with dots where wires join, or breaks where switches are located, guiding correct wiring.
  • Valves: Various shapes like triangles or arrows indicating flow direction and control points.

Technicians working in sectors like retail stores or hotels must familiarize themselves with these symbols to prevent mistakes during installation or repairs.

3.1.3 Reading Wiring Diagrams

Wiring diagrams are a subset of schematic drawings focusing on electrical connections, showing how power is supplied to and controlled within the air conditioning system. Understanding wiring diagrams allows for correct connection of components such as contactors, capacitors, and overload protectors. In a county government office, proper wiring ensures system reliability and safety, preventing electrical hazards.

Key Aspects of Wiring Diagram Interpretation

  • Power supply identification: Recognizing incoming voltage and phase to match equipment requirements.
  • Control circuit layout: Understanding how switches, thermostats, and relays interact to operate the system.
  • Component interconnections: Tracing wires from power source through control devices to motors and compressors.
  • Safety devices: Identifying fuses, circuit breakers, and overload protectors to ensure protection against faults.
  • Color coding: Following standard wire color codes to avoid confusion during installation or maintenance.

3.1.4 Practical Tips for Accurate Interpretation

Interpreting schematic drawings requires attention to detail and a methodical approach to avoid costly installation errors. Professionals in Kenya’s refrigeration sector often face challenges such as incomplete drawings or outdated symbols, especially in older buildings.

Tips for Effective Schematic Reading

  • Confirm drawing version: Always verify that you are using the latest schematic to avoid outdated information.
  • Use legend and notes: Refer to drawing legends and notes for symbol explanations and special instructions.
  • Cross-reference with equipment manuals: Compare schematic details with manufacturer manuals for component specifications.
  • Mark up drawings: Annotate drawings during site visits to record modifications or observations.
  • Seek clarification: Consult engineers or designers if any part of the schematic is unclear before proceeding with installation.

Practice Questions

  1. Explain the importance of schematic drawings in air conditioning installation and provide examples of how they assist technicians in the field. (10 marks)

  2. Identify and describe five common symbols found in air conditioning schematic drawings. (10 marks)

  3. Describe the key elements a technician should look for when reading a wiring diagram for an air conditioning unit. (10 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒3.2 Types of Air Conditioning Units

In Kenya’s diverse climate and building types, refrigeration and air conditioning professionals must understand the characteristics and installation requirements of different air conditioning units. Two widely used types are window units and split units, each…

🔒3.3 Types of Air Conditioning Unit Components

In the installation and maintenance of air conditioning units in Kenya, understanding the various components is fundamental for technicians to ensure efficient and reliable systems. Each component plays a critical role in the cooling cycle, affecting energy co…

🔒3.4 Types of Refrigerants (Including Hydrocarbons)

The choice of refrigerant significantly influences the performance, environmental impact, and regulatory compliance of air conditioning systems in Kenya. Refrigerants are substances that absorb and transfer heat in the refrigeration cycle, and their chemical p…

🔒3.5 Types of lubricants

Lubricants play a critical role in the smooth operation and longevity of air conditioning units. In the Kenyan refrigeration and air conditioning industry, selecting the correct lubricant ensures that compressors and moving parts operate efficiently under vary…

🔒3.6 Sealants and insulation materials

In air conditioning units, proper sealing and insulation are essential to maintain system efficiency, prevent energy losses, and avoid moisture ingress that can damage components. Kenyan refrigeration and air conditioning professionals must understand the type…

🔒3.7 Fastening Devices

Fastening devices are critical components in the installation of air conditioning units, ensuring that the equipment is securely mounted and remains stable during operation. In the Kenyan refrigeration and air conditioning industry, selecting the appropriate f…

🔒3.8 Types of PVC Drain Pipes and Fittings

PVC drain pipes and fittings play a crucial role in the efficient removal of condensate water from air conditioning units, preventing water damage and ensuring hygienic conditions. In Kenya's refrigeration and air conditioning sector, knowledge of the types an…

🔒3.9 Safety Practices: EN 378, ISO 5149, EN 13313 Standards

In the Kenyan refrigeration and air conditioning sector, adherence to international safety standards is critical to protect technicians, users, and the environment. These standards provide comprehensive frameworks for handling refrigerants, installing equipmen…

🔒3.10 Air Conditioning Installation Procedure

Installing air conditioning units in Kenya requires a systematic procedure that ensures safety, efficiency, and compliance with industry standards. Whether installing in a county government office or a retail business, following a structured installation proce…

🔒3.11 Installation of Hydrocarbon Units

The use of hydrocarbon refrigerants in refrigeration and air conditioning systems is gaining traction in Kenya due to their low global warming potential and energy efficiency. However, hydrocarbons such as propane (R290) and isobutane (R600a) are flammable, re…

Chapter Summary

This chapter covers the essential knowledge and skills required for installing air conditioning units, starting with how to interpret schematic drawings that guide the installation process. It explores the main types of air conditioning units, focusing on window and split systems, explaining their distinct features and applications. The various components that make up these units are detailed to provide a clear understanding of their functions. Different refrigerants, including hydrocarbons, are introduced along with their properties and usage considerations. The chapter also examines types of lubricants necessary for system efficiency and the role of sealants and insulation materials in maintaining performance. Fastening devices and PVC drain pipes with their fittings are discussed as critical elements in securing and managing condensate. Safety practices aligned with EN 378, ISO 5149, and EN 13313 standards are emphasized to ensure compliant and safe installation. Finally, the chapter outlines the step-by-step air conditioning installation procedure and highlights specific considerations when installing hydrocarbon units.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What is the primary purpose of interpreting schematic drawings during air conditioning unit installation? (2 marks)
  2. Identify two key differences between window air conditioning units and split air conditioning units. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Describe the main symbols used in schematic drawings for split air conditioning units and explain their significance in installation. (4 marks)
  2. Differentiate between window and split air conditioning units in terms of installation requirements and typical applications in Kenyan residential buildings. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Interpret schematic drawings for installation of split air conditioning units

Refrigeration And Air Conditioning · Level 6
Air Conditioning Units Installation
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Interpret the provided schematic drawing to identify and mark the installation points and connections for a split air conditioning unit with indoor unit bracket size 400mm x 120mm and outdoor unit bracket size 600mm x 150mm.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring tapeSchematic drawing for split AC installation
Marker penPersonal Protective Equipment (overall, gloves, safety boots, goggles)
Scale ruler
Notebook and pen
Calculator
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Schematic drawing for split AC installation1 per Candidate
2Measuring tape1 per Candidate
3Marker pen1 per Candidate
4Scale ruler1 per Candidate
5Notebook and pen1 set per Candidate
6Calculator1 per Candidate
7Personal Protective Equipment (overall, gloves, safety boots, goggles)1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Interpret schematic drawing for split AC installation
Wore prescribed PPE (overall, gloves, safety boots, goggles)
(Award 1 mark for wearing all PPE as per workplace safety procedures)
1
Selected and used tools correctly (measuring tape, scale ruler, marker pen, calculator)
(Award 1 mark for correct selection and handling of tools)
1
Identified installation site for indoor unit as per schematic drawing
(Award 2 marks for accurately identifying and marking indoor unit bracket position with correct dimensions)
2
Identified installation site for outdoor unit as per schematic drawing
(Award 2 marks for accurately identifying and marking outdoor unit bracket position with correct dimensions)
2
Interpreted refrigerant line routing and drainage pipe placement
(Award 2 marks for correctly identifying suction and discharge line routes and drainage pipe location)
2
Noted electrical connection points as per schematic
(Award 1 mark for correctly identifying electrical cable entry points on indoor and outdoor units)
1
Prepared clear notes and sketches in notebook based on schematic interpretation
(Award 1 mark for neat and accurate notes and sketches)
1
Performed housekeeping by organizing tools and cleaning workspace
(Award 1 mark for proper housekeeping after task completion)
1
Sub-Total11
PRODUCT CHECKLIST
Accurate marking of indoor unit bracket position with dimensions 400mm x 120mm
(Award up to 3 marks for correct position and dimension accuracy within ±5mm)
3
Accurate marking of outdoor unit bracket position with dimensions 600mm x 150mm
(Award up to 3 marks for correct position and dimension accuracy within ±5mm)
3
Correct identification and marking of suction, discharge lines and drainage pipe routing
(Award up to 3 marks for correct line routes matching schematic drawing)
3
Clear and legible notes and sketches matching schematic drawing details
(Award up to 2 marks for clarity, completeness and accuracy of notes and sketches)
2
Sub-Total11
GRAND TOTAL22
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Identify and Handle Types of Air Conditioning Units for Installation

Refrigeration And Air Conditioning · Level 6
Air Conditioning Units Installation
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Identify and prepare a window air conditioning unit 1200mm x 400mm x 350mm and a split air conditioning unit with an indoor unit 900mm x 300mm x 210mm and outdoor unit 800mm x 540mm x 320mm for installation.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Flaring KitWindow Air Conditioning Unit
Manifold Gauge SetSplit Air Conditioning Unit
Tape MeasureCopper Tubes (1/2 inch diameter)
Assorted ScrewdriversSealants (Silicone or Foam)
Assorted PliersDrain Hose
Vacuum PumpMounting Brackets
Leak Detector
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Window Air Conditioning Unit1 Pc per Candidate
2Split Air Conditioning Unit (Indoor and Outdoor)1 Set per Candidate
3Flaring Kit1 Set per Candidate
4Manifold Gauge Set1 Set per Candidate
5Tape Measure1 Pc per Candidate
6Assorted Screwdrivers1 Set per Candidate
7Assorted Pliers1 Set per Candidate
8Copper Tubes (1/2 inch diameter)Enough per Candidate
9Vacuum Pump1 Pc per Candidate
10Leak Detector1 Pc per Candidate
11Safety Gloves1 Pair per Candidate
12Safety Goggles1 Pair per Candidate
13Safety Boots1 Pair per Candidate
14Overall/Dust Coat1 Pc per Candidate
15Sealants (Silicone or Foam)Enough per Candidate
16Drain HoseEnough per Candidate
17Mounting Brackets2 Sets per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Adhere to Safety Precautions and Handle Tools
Wore safety gloves, overall/dust coat, safety boots, and safety goggles
(Award 1 mark for full PPE usage or zero)
1
Handled tools and equipment correctly as per workshop procedures
(Award 1 mark for correct and safe tool handling or zero)
1
Sub-Total2
TASK 2: Identify Air Conditioning Units and Installation Sites
Identified window air conditioning unit and its key parts (compressor, evaporator, controls)
(Award 1 mark for correct identification or zero)
1
Identified split air conditioning indoor and outdoor units and their components
(Award 1 mark for correct identification or zero)
1
Identified suitable mounting positions for indoor and outdoor units
(Award 1 mark for correct site identification or zero)
1
Sub-Total3
TASK 3: Prepare Air Conditioning Units for Installation
Measured and marked mounting bracket locations accurately
(Award 1 mark for accurate measurement or zero)
1
Mounted the indoor unit bracket and secured it properly
(Award 1 mark for correct mounting or zero)
1
Mounted the outdoor unit bracket and secured it properly
(Award 1 mark for correct mounting or zero)
1
Cut and flared copper tubes to correct lengths for suction and discharge lines
(Award up to 2 marks for correct cutting and flaring or zero)
2
Connected suction and discharge lines to indoor and outdoor units using flaring nuts
(Award 1 mark for proper connection or zero)
1
Installed drainage pipe and sealed joints with appropriate sealant
(Award 1 mark for proper installation or zero)
1
Performed lagging (insulation) of suction and discharge tubes
(Award 1 mark for correct lagging or zero)
1
Sub-Total8
TASK 4: Perform System Leak Test and Evacuation Preparation
Connected oxygen-free nitrogen cylinder and pressurized the system correctly
(Award 1 mark for correct connection and pressurization or zero)
1
Checked for leaks using leak detector or soap foam and took corrective action if needed
(Award 1 mark for leak detection and correction or zero)
1
Connected vacuum pump and evacuated the system to zero pressure
(Award 1 mark for correct evacuation or zero)
1
Sub-Total3
TASK 5: Housekeeping and Reporting
Cleaned the work area and tools, disposed of waste properly
(Award 1 mark for proper housekeeping or zero)
1
Prepared a clear installation report including title, tools and materials used, and procedure description
(Award 1 mark for complete report or zero)
1
Sub-Total2
PRODUCT CHECKLIST
Window AC unit dimensions match 1200mm x 400mm x 350mm with all components intact and undamaged
(Award 2 marks for correct unit identification and condition or zero)
2
Split AC indoor unit dimensions match 900mm x 300mm x 210mm and outdoor unit 800mm x 540mm x 320mm
(Award 2 marks for correct unit identification and condition or zero)
2
Copper tubes cut and flared accurately with no leaks on joints
(Award 2 marks for accurate fabrication and leak-free joints or zero)
2
Mounting brackets installed level and secure for both indoor and outdoor units
(Award 2 marks for proper mounting or zero)
2
Drainage and sealing properly installed and sealed with no visible gaps
(Award 1 mark for correct installation or zero)
1
System evacuated successfully to zero pressure with no leaks detected
(Award 1 mark for proper evacuation and leak-free system or zero)
1
Sub-Total10
GRAND TOTAL28
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Identify and Explain Components of a Split Air Conditioning UnitPractical 3
🔒Select and Charge Refrigerants including Hydrocarbons in a Split Air Conditioning UnitPractical 4
🔒Select and Apply Lubricants for Air Conditioning Unit ComponentsPractical 5
🔒Apply Sealants and Insulation Materials on Air Conditioning UnitsPractical 6
🔒Install and Secure a Split Air Conditioning Unit Using Appropriate Fastening DevicesPractical 7
🔒Installation of PVC Drain Pipes and Fittings for Air Conditioning Condensate DrainagePractical 8
🔒Implement Safety Practices for Installation of a Split Air Conditioning UnitPractical 9
🔒Installation of a Split Air Conditioning Unit 1.5 Ton CapacityPractical 10
🔒Installation of a Window Type Air Conditioning UnitPractical 11
🔒Installation of Hydrocarbon Refrigerant Split Air Conditioning Unit 1.2kWPractical 12
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 14 questions Start quiz ▾
0%
0 / 2
🔒

12 more in this section.

Create a free account