By the end of this chapter, you will be able to:
- correctly carry out a pressure strength test on a refrigeration unit following the KS ISO 5149-2:2014 Para 5.3 standard
- accurately perform a pressure tightness test according to the KS ISO 5149-2:2014 Para 5.3 standard
- safely complete housekeeping tasks in line with workplace policies and occupational safety and health regulations
- maintain a clean and safe work environment while working on refrigeration units
Mastering these skills ensures your refrigeration installations are safe, reliable, and meet professional standards, preparing you for success in the trade.
Pressure testing is a critical phase in the installation and commissioning of domestic refrigeration units. It ensures the system’s structural integrity and leak-tightness before introduction of refrigerant, preventing costly damage, inefficiencies, and safety hazards. In Kenya, where refrigeration units serve households, hotels, and retail businesses, rigorous pressure testing safeguards investments and aligns with standards set by bodies such as the Kenya Bureau of Standards (KEBS). This chapter explores the two main types of pressure tests applied to refrigeration units: the pressure strength test and the pressure tightness test.
Pressure strength testing verifies that the refrigeration system can safely withstand pressures beyond its normal operating limits without structural failure. This test is essential to confirm the durability of components such as evaporators, condensers, and piping before refrigerant charging. Kenyan refrigeration technicians working in domestic installations, such as those servicing hotels in Mombasa or supermarkets in Nairobi, rely on this test to avoid equipment damage and ensure user safety.
The pressure strength test aims to confirm that the refrigeration system components can tolerate pressures higher than those experienced during normal operation. This is crucial to prevent catastrophic failures such as pipe bursts or tank ruptures that could cause refrigerant leaks, property damage, or personal injury. It also helps identify weak points in welds, joints, or thin metal areas before the system is put into service.
Pressure strength tests typically use inert gases or liquids to apply pressure in the system. The choice of test medium affects safety, accuracy, and ease of detecting leaks.
A systematic approach ensures the test is conducted safely and yields reliable results. Kenyan refrigeration technicians must follow precise steps to avoid accidents and ensure compliance.
Pressure tests carry inherent risks, especially when using gases under high pressure. Observing safety measures protects personnel and equipment.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter covers the essential procedures for conducting pressure tests on domestic refrigeration units to ensure their safety and functionality. The pressure strength test evaluates the refrigeration system's ability to withstand high pressure without failure, confirming the structural integrity of components under stress conditions. Following this, the pressure tightness test checks for leaks by maintaining pressure within the system and monitoring any drops that would indicate a breach. The chapter also highlights the importance of adhering to relevant international standards, focusing specifically on KS ISO 5149-2:2014 Paragraph 5.3, which provides detailed requirements for pressure testing in refrigeration systems. Compliance with these standards ensures that installations meet safety and quality benchmarks necessary for reliable operation. Understanding and applying these tests correctly protects equipment longevity and user safety while maintaining regulatory compliance.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Oxygen Free Dry Nitrogen (OFDN) cylinder with pressure regulator | Domestic refrigeration unit |
| Manifold gauge set | Pressure test report form |
| Leak detector or soap foam solution | |
| Pressure test hose and connectors |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Domestic refrigeration unit | 1 Pc per Candidate |
| 2 | Oxygen Free Dry Nitrogen (OFDN) cylinder with pressure regulator | 1 set per Candidate |
| 3 | Manifold gauge set | 1 set per Candidate |
| 4 | Leak detector or soap foam solution | 1 set per Candidate |
| 5 | Pressure test hose and connectors | 1 set per Candidate |
| 6 | Safety gloves | 1 Pair per Candidate |
| 7 | Safety goggles | 1 Pair per Candidate |
| 8 | Dust coat/overall | 1 Pc per Candidate |
| 9 | Safety boots | 1 Pair per Candidate |
| 10 | Pressure test report form | 1 Pc per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Prepare for Pressure Test | |||
| Wore all required PPE: gloves, goggles, dust coat, safety boots (Award 1 mark if all PPE worn correctly, else zero) | 1 | ||
| Selected and inspected all tools and equipment for functionality (Award 1 mark if tools and equipment are suitable and in good condition) | 1 | ||
| Connected the OFDN cylinder to the refrigeration unit using pressure test hose and manifold gauge (Award 1 mark for correct and leak-free connections) | 1 | ||
| Set the pressure regulator to 300 kPa and applied pressure slowly to the system (Award 2 marks for correct pressure setting and controlled application) | 2 | ||
| Monitored pressure gauge for at least 10 minutes to ensure stable pressure (Award 2 marks if pressure remains stable without drop) | 2 | ||
| Checked all joints, connections, and the refrigeration unit surface for leaks using leak detector or soap foam (Award 3 marks if a thorough check is done and no leaks found or properly repaired) | 3 | ||
| Released pressure safely after completion of the test (Award 1 mark for safe and correct pressure release) | 1 | ||
| Disassembled and stored tools and equipment properly (Award 1 mark for proper handling and storage) | 1 | ||
| Prepared and completed pressure test report form with all relevant details (Award 2 marks for complete and accurate report) | 2 | ||
| Performed housekeeping by cleaning the work area and disposing of waste as per workplace procedure (Award 1 mark for proper housekeeping) | 1 | ||
| Sub-Total | 15 | ||
| PRODUCT CHECKLIST | |||
| Refrigeration unit maintained 300 kPa pressure for 10 minutes without pressure drop (Award 2 marks if pressure stability is achieved) | 2 | ||
| No leaks detected on the refrigeration unit or joints during the test (Award 3 marks if the system is leak-tight) | 3 | ||
| Pressure test report correctly filled with pressure values, observations, and candidate details (Award 2 marks if report is complete and legible) | 2 | ||
| Sub-Total | 7 | ||
| GRAND TOTAL | 22 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Manifold gauge set with charging hoses | Domestic refrigeration unit |
| Vacuum pump with hoses | Cleaning rags |
| Assorted wrenches and screwdrivers | Safety gloves |
| Leak detector or soap foam solution | Safety goggles |
| Charging valve | Dust coat/Overall |
| Oxygen Free Dry Nitrogen (OFDN) gas cylinder with regulator | Safety boots |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Domestic refrigeration unit | 1 Pc per Candidate |
| 2 | Oxygen Free Dry Nitrogen (OFDN) gas cylinder with regulator | 1 set per Candidate |
| 3 | Manifold gauge set with charging hoses | 1 set per Candidate |
| 4 | Leak detector or soap foam solution | 1 per Candidate |
| 5 | Vacuum pump with hoses | 1 set per Candidate |
| 6 | Charging valve | 1 Pc per Candidate |
| 7 | Assorted wrenches and screwdrivers | 1 set per Candidate |
| 8 | Safety gloves | 1 pair per Candidate |
| 9 | Safety goggles | 1 per Candidate |
| 10 | Dust coat/Overall | 1 per Candidate |
| 11 | Safety boots | 1 pair per Candidate |
| 12 | Cleaning rags | Enough per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Prepare and conduct pressure tightness test | |||
| Wore appropriate Personal Protective Equipment (gloves, goggles, dust coat, safety boots) (Award 1 mark for correct PPE usage or zero) | 1 | ||
| Correctly connected Oxygen Free Dry Nitrogen (OFDN) gas cylinder and regulator to the refrigeration unit (Award 1 mark for proper connection and 1 mark for correct regulator setting) | 2 | ||
| Pressurized refrigeration unit to 150 psi using OFDN (Award 2 marks for reaching and maintaining correct pressure) | 2 | ||
| Checked all joints, brazed connections, and valves for leaks using leak detector or soap foam solution (Award marks based on thoroughness and correct use of leak detection method) | 4 | ||
| Released pressure safely and disconnected OFDN cylinder and equipment (Award 1 mark for safe and correct disconnection) | 1 | ||
| Performed housekeeping by cleaning workspace and storing tools appropriately (Award 1 mark for proper housekeeping) | 1 | ||
| Sub-Total | 11 | ||
| PRODUCT CHECKLIST | |||
| Refrigeration unit maintains pressure at 150 psi for at least 15 minutes without pressure drop (Award 3 marks for no pressure loss indicating tightness; 0 if leaks detected) | 3 | ||
| No visible leaks detected on all joints and connections after testing (Award 3 marks for absence of leaks; 0 if leaks present) | 3 | ||
| Equipment and connections are clean and free from damage after test (Award 2 marks for cleanliness and intact equipment post-test) | 2 | ||
| Sub-Total | 8 | ||
| GRAND TOTAL | 19 | ||
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.