Air conditioning installation demands precise planning and execution to ensure optimal system performance and durability. Conducting a thorough site survey is a critical step that informs design decisions, material selection, and safety considerations. Among the essential activities during the site survey is performing leakage tests, which verify the integrity of the refrigerant circuit and prevent environmental harm and system inefficiency. In Kenya, where refrigeration and air conditioning systems serve diverse settings such as hospitals, hotels, and commercial offices, effective leakage testing safeguards both equipment longevity and compliance with environmental regulations.
Leakage tests are vital procedures performed to detect and quantify refrigerant leaks in air conditioning systems before commissioning or during maintenance. These tests protect the environment by preventing the release of harmful refrigerants and ensure that the system operates at its designed capacity without loss of cooling efficiency. For refrigeration and air conditioning professionals in Kenya, leakage testing aligns with national standards and environmental policies, particularly under regulations enforced by bodies such as NEMA. Proper leakage detection also reduces operational costs by preventing refrigerant replacement and system downtime.
Leakage testing serves multiple critical functions in air conditioning installations, contributing to system reliability and environmental stewardship. Understanding these purposes helps technicians appreciate the necessity of rigorous testing procedures during site surveys.
Various techniques exist to detect refrigerant leaks, each suited to different system types and leak sizes. Selection depends on equipment availability, system sensitivity, and the nature of the refrigerant used.
Effective leakage testing requires specialized tools calibrated to detect refrigerants commonly used in Kenya’s air conditioning systems, such as R410A, R134a, and R22.
| Name | Specification | Use |
|---|---|---|
| Electronic Leak Detector | Sensitivity: detects leaks as small as 0.1 oz/year; powered by rechargeable battery | Detects refrigerant gas leaks in joints and components |
| Soap Solution Spray | Non-toxic, water-based with surfactants | Identifies visible leaks by bubble formation |
| UV Dye Kit | Dye compatible with refrigerants; includes UV light source | Locates leaks by fluorescence under UV light |
| Pressure Gauge | Range 0-500 psi; accuracy ±1% | Measures system pressure during decay tests |
| Halide Torch | Flame temperature approx. 1900°C; portable design | Detects halogen refrigerant leaks by flame color change |
Performing leakage tests systematically during site surveys ensures accurate detection and timely rectification of faults before system commissioning. The following steps outline a comprehensive approach:
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter focused on the critical steps involved in conducting a site survey for air conditioning unit installation. It began with procedures for conducting leakage tests to ensure system integrity and prevent refrigerant loss. Next, it covered the testing of temperature settings to verify that the system maintains desired environmental conditions. The chapter then explained how to measure current and voltage to confirm electrical parameters are within safe and efficient operating limits. Attention was given to sound and vibration checking, assessing the unit’s mechanical stability and noise levels. The operation of the air conditioning system was evaluated against acceptable standards to guarantee performance and reliability. Finally, the chapter outlined commissioning and handing over procedures that formalize system readiness and client satisfaction, followed by guidance on report writing to document findings and actions taken during the survey.
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Leak detector | Split air conditioning unit |
| Manifold gauge with hoses | Appropriate refrigerant (R410A) |
| Vacuum pump | Flare nuts (3/8 inch and 1/4 inch) |
| Oxygen Free Dry Nitrogen gas cylinder with gauges | |
| Tube cutter | |
| Flaring and swaging tool kit | |
| Assorted torque wrenches | |
| Digital weighing scale | |
| Set of screwdrivers (flat and star) | |
| Safety goggles | |
| Dust coat/overall | |
| Safety boots | |
| Gloves (chemical resistant) |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Split air conditioning unit | 1 Pc per Candidate |
| 2 | Leak detector | 1 Pc per Candidate |
| 3 | Manifold gauge with hoses | 1 Set per Candidate |
| 4 | Vacuum pump | 1 Pc per Candidate |
| 5 | Oxygen Free Dry Nitrogen gas cylinder with gauges | 1 Pc per Candidate |
| 6 | Tube cutter | 1 Pc per Candidate |
| 7 | Flaring and swaging tool kit | 1 Set per Candidate |
| 8 | Assorted torque wrenches | 1 Set per Candidate |
| 9 | Digital weighing scale | 1 Pc per Candidate |
| 10 | Appropriate refrigerant (R410A) | Enough for center |
| 11 | Flare nuts (3/8 inch and 1/4 inch) | 2 Pcs per Candidate |
| 12 | Set of screwdrivers (flat and star) | 1 Set per Candidate |
| 13 | Safety goggles | 1 Pair per Candidate |
| 14 | Dust coat/overall | 1 Pc per Candidate |
| 15 | Safety boots | 1 Pair per Candidate |
| 16 | Gloves (chemical resistant) | 1 Pair per Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Safety and Preparation | |||
| Wore dust coat/overall, safety boots, safety goggles, and gloves (Award 1 mark for correct PPE or zero) | 1 | ||
| Handled tools and equipment correctly and observed safety procedures (Award 2 marks for proper handling and safety or zero) | 2 | ||
| Sub-Total | 3 | ||
| TASK 2: Pumping Down and Isolation | |||
| Turned off indoor unit and connected manifold gauge service ports correctly (Award 1 mark or zero) | 1 | ||
| Opened both service valves fully and set AC unit to cooling mode (Award 1 mark or zero) | 1 | ||
| Closed liquid line valve first, monitored suction pressure gauge (Award 1 mark or zero) | 1 | ||
| Turned off unit when pressure neared zero psi and closed suction valve (Award 1 mark or zero) | 1 | ||
| Disconnected gauges and securely re-capped service valves (Award 1 mark or zero) | 1 | ||
| Sub-Total | 5 | ||
| TASK 3: Flare Nut Replacement and Inspection | |||
| Checked all valves were tightly closed (Award 1 mark or zero) | 1 | ||
| Released flare nuts using spanners and inspected copper tubes for damage (Award 1 mark or zero) | 1 | ||
| Cut tube holding flare nut using tube cutter and replaced flare nuts (Award 1 mark or zero) | 1 | ||
| Flared copper tubes, reconnected and tightened flare nuts properly (Award 1 mark or zero) | 1 | ||
| Sub-Total | 4 | ||
| TASK 4: Pressure Testing and Leak Detection | |||
| Set up pressure testing equipment correctly and applied pressure of 150 psi (Award 1 mark or zero) | 1 | ||
| Monitored pressure by closing valves and checked for leaks at flared joints (Award 1 mark or zero) | 1 | ||
| Repaired leaking joints by tightening flare nuts as necessary (Award 1 mark or zero) | 1 | ||
| Applied leak detector to joints and identified any refrigerant leaks (Award 1 mark or zero) | 1 | ||
| Sub-Total | 4 | ||
| TASK 5: Evacuation Process | |||
| Connected vacuum pump and manifold gauge correctly to the system (Award 1 mark or zero) | 1 | ||
| Monitored evacuation process and achieved pressure below 500 microns (Award 2 marks for correct monitoring and pressure or zero) | 2 | ||
| Stopped evacuation process as per SOP and disconnected equipment properly (Award 1 mark or zero) | 1 | ||
| Sub-Total | 4 | ||
| TASK 6: System Performance Monitoring and Commissioning | |||
| Switched on unit and checked for vibrations and noise (Award 1 mark or zero) | 1 | ||
| Examined cool air from evaporator and checked thermostat functionality (Award 1 mark or zero) | 1 | ||
| Checked superheat and cooling performance as per workplace procedures (Award 1 mark or zero) | 1 | ||
| Sub-Total | 3 | ||
| TASK 7: Housekeeping and Reporting | |||
| Cleared workstation, cleaned and stored tools and equipment (Award 1 mark or zero) | 1 | ||
| Disposed of any waste according to workplace policy (Award 1 mark or zero) | 1 | ||
| Prepared a detailed service report in line with workplace procedures (Award up to 5 marks for completeness and accuracy or zero) | 5 | ||
| Sub-Total | 7 | ||
| PRODUCT CHECKLIST | |||
| Leakage test completed with no detectable leaks at service valves and flare joints (Award 3 marks if no leaks detected or zero) | 3 | ||
| Pressure maintained at 150 psi during testing without drop over 30 minutes (Award 2 marks for stable pressure or zero) | 2 | ||
| Evacuation pressure achieved below 500 microns and system sealed properly (Award 3 marks for correct evacuation or zero) | 3 | ||
| System commissioning shows correct cooling and vibration within acceptable limits (Award 2 marks for proper commissioning or zero) | 2 | ||
| Sub-Total | 10 | ||
| GRAND TOTAL | 40 | ||
Type: Individual
| Tools & Equipment | Materials |
|---|---|
| Digital thermometer | Split air conditioning unit |
| Manifold gauge set with hoses | Appropriate refrigerant (R410A) |
| Vacuum pump | Lubricating oil |
| Refrigerant charging kit | |
| Leak detector | |
| Assorted spanners | |
| Screwdrivers (flat and cross) | |
| Digital weighing scale | |
| PPE (overall/dust coat, safety boots, gloves, safety goggles) |
| S/N | Item | Quantity |
|---|---|---|
| 1 | Split air conditioning unit | 1 Pc per Candidate |
| 2 | Digital thermometer | 1 Pc per Candidate |
| 3 | Manifold gauge set with hoses | 1 Set per Candidate |
| 4 | Vacuum pump | 1 Pc per Candidate |
| 5 | Refrigerant charging kit | 1 Set per Candidate |
| 6 | Leak detector | 1 Pc per Candidate |
| 7 | Assorted spanners | 1 Set per Candidate |
| 8 | Screwdrivers (flat and cross) | 1 Set per Candidate |
| 9 | Digital weighing scale | 1 Pc per Candidate |
| 10 | PPE (overall/dust coat, safety boots, gloves, safety goggles) | 1 Set per Candidate |
| 11 | Appropriate refrigerant (R410A) | Enough for the Centre |
| 12 | Lubricating oil | Enough for the Candidate |
| Items to be Evaluated | Marks Available | Marks Obtained | Comments |
|---|---|---|---|
| TASK 1: Preparation and Safety | |||
| Wore appropriate PPE including overall/dust coat, safety boots, gloves, and goggles (Award 1 mark for correct PPE use or zero) | 1 | ||
| Handled tools and equipment correctly following safety procedures (Award 2 marks for correct and safe tool handling or zero) | 2 | ||
| Sub-Total | 3 | ||
| TASK 2: Testing Temperature Settings | |||
| Switched on the split air conditioning unit and set to cooling mode (Award 1 mark for correct unit operation or zero) | 1 | ||
| Used digital thermometer to measure the air temperature at the evaporator outlet (Award 2 marks for correct measurement technique and accuracy or zero) | 2 | ||
| Monitored the temperature readings and compared with the specified 24°C ±1°C (Award 2 marks for accurate monitoring and comparison or zero) | 2 | ||
| Sub-Total | 5 | ||
| TASK 3: Adjusting Temperature Settings | |||
| Adjusted thermostat settings to achieve specified cooling temperature (Award 2 marks for correct adjustment or zero) | 2 | ||
| Checked and adjusted refrigerant charge using manifold gauges and weighing scale as necessary (Award 3 marks for correct charging and monitoring or zero) | 3 | ||
| Checked for leaks using leak detector and repaired if necessary (Award 2 marks for proper leak detection and repair or zero) | 2 | ||
| Sub-Total | 7 | ||
| TASK 4: Monitoring System Performance and Commissioning | |||
| Verified cooling performance by measuring temperature after adjustment (Award 2 marks for confirmation of cooling temperature within specification or zero) | 2 | ||
| Checked system for abnormal vibrations and noises (Award 1 mark for proper system inspection or zero) | 1 | ||
| Commissioned the unit according to standard operating procedures (Award 1 mark for correct commissioning or zero) | 1 | ||
| Sub-Total | 4 | ||
| TASK 5: Housekeeping and Reporting | |||
| Cleaned and stored tools and equipment properly (Award 1 mark for proper housekeeping or zero) | 1 | ||
| Disposed of waste materials according to workplace safety procedures (Award 1 mark for correct waste disposal or zero) | 1 | ||
| Prepared and submitted a detailed service report in line with workplace procedures (Award 5 marks for complete and accurate report or zero) | 5 | ||
| Sub-Total | 7 | ||
| PRODUCT CHECKLIST | |||
| Achieved and maintained indoor air temperature at 24°C ±1°C as specified (Award 3 marks for temperature within tolerance or zero) | 3 | ||
| No refrigerant leaks detected after adjustment (Award 2 marks for leak free system or zero) | 2 | ||
| Thermostat settings correctly adjusted and functional (Award 2 marks for correct thermostat operation or zero) | 2 | ||
| Sub-Total | 7 | ||
| GRAND TOTAL | 33 | ||